ML20259C390
From kanterella
Jump to navigation
Jump to search
ML20259C390 | |
Person / Time | |
---|---|
Site: | Three Mile Island |
Issue date: | 06/03/1983 |
From: | GENERAL PUBLIC UTILITIES CORP. |
To: | |
Shared Package | |
ML20076G241 | List: |
References | |
SP-1101-06-008, SP-1101-6-8, NUDOCS 8306140594 | |
Download: ML20259C390 (1) | |
Similar Documents at Three Mile Island | |
---|---|
Category:DRAWINGS
MONTHYEARML20266C4371994-06-0202 June 1994
[Table view]3 Ms 1 Class Iinp Reactor Bldg ML20262E8401993-11-18018 November 1993 ISI Boundary Sketch Main Steam System and Drainage ML20262E8441993-02-0303 February 1993 ISI Boundary Sketch Emergency Feedwater and Feedwater Systems ML20266H5241990-04-23023 April 1990 Reactor Protection System ML20266C2291989-09-18018 September 1989 24 Ms 1 from Vessel to Valve Ms AOV 80B Reactor Bldg Class in Piping LOOP B.Sheet 6 of 8 ML20260K7591989-08-0303 August 1989 Piping Sys Rc Pump MOTOR-REMOTE Lube Oil Fill ML20260K7631989-08-0303 August 1989 Piping Sys Rc Pump (RC-P-1A)-MOTOR Lube Oil ML20260A6821988-10-11011 October 1988 Dwcs Coagulant/Filter Aid Systems ML20265F4951988-07-26026 July 1988 General Arrangement Plenum and Fuel Removal Reactor Bldg Plan Fl El 347 FEET-6 Inches. Rev Date Illegible ML20260A6871988-07-16016 July 1988 Defueling Water Cleanup (Dwc) Fuel Transfer Canal/Spent Fuel Pool Cleanup System ML20265F4871988-05-10010 May 1988 Dwcs Coagulant/Filter Aid Systems ML20265F4991988-05-10010 May 1988 P&ID Dwc - Reactor Vessel Cleanup System ML20265F5081988-05-0606 May 1988 Piping & Instrument Diagram Defueling Water Cleanup (Dwc) Fuel Transfer Canal/Spent Fuel Pool Cleanup System ML20265F5041988-01-28028 January 1988 Piping & Instrument Diagram Defueling Water Cleanup (Dwc) Auxiliary Systems ML20266J6381987-07-0909 July 1987 Piping & Instrument Diagram Pressurizer Defueling System ML20266A7941987-01-13013 January 1987 Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 2 of 2 ML20266A7881987-01-13013 January 1987 Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 1 of 2 ML20265B4531986-09-0202 September 1986 P&Id:Pressurizer Defueling Sys ML20265F4901986-06-13013 June 1986 General Arrangement Fuel Handling Building/Truck Bay Plan Floor El 347 FEET-6 Inches 8 El 305 Feet 1-INCH ML20262E9411985-09-27027 September 1985 General Arrangement Plenum and Fuel Removal Reactor Bldg Plan Fl El 347 Ft 6 Inches. Rev Date Illegible ML20262E9481985-08-0808 August 1985 General Arrangement Fuel Handling Bldg/Truck Bay Plan Floor El 347 Ft 6 Inches 8 El 305 Ft 1 Inch ML20260G0941985-02-0707 February 1985 Fire Zone FH-Z1 Study, Conceptual ML20260B6411985-01-14014 January 1985 General Arrangement:Plenum and Fuel Removal Reactor Bldg Plan Fl El 347 Ft 8 Inches. Rev Date Illegible ML20260B6451985-01-14014 January 1985 General Arrangement:Fuel Handling Building Plan Floor El 347 Ft 6 Inches. Rev Date Illegible ML20260B6531984-09-17017 September 1984 Piping & Instrument Diagram:Defueling Water Cleanup (Dwc) Fuel Transfer Canal/Spent Fuel Pool Cleanup System ML20260B6491984-09-17017 September 1984 Piping & Instrument Diagram:Defueling Water Cleanup (Dwc) Auxiliary Systems ML20260B6581984-09-17017 September 1984 Piping & Instrument Diagram:Defueling Water Cleanup (Dwc) Reactor Vessel Cleanup System ML20263Q6521984-03-30030 March 1984 Elementary Diagram:Ac Primary Trip Breaker Unit 10 (11) CRDM Breaker Modification ML20263Q6551984-03-30030 March 1984 Block Diagram:Control Rod Drive Mechanism Circuit Breaker Modification ML20263Q6581984-03-30030 March 1984 Elementary Diagram:Dc Breakers CB1 & CB2 (CB3 & CB4) CRDM Breaker Modification ML20024B5141983-07-0606 July 1983 Figure 9, Makeup Tank Level. ML20024B5171983-07-0606 July 1983 Figure 11, Makeup Tank Level,780423. ML20024B5151983-07-0606 July 1983 Figure 10, Calculated Makeup Tank Level. ML20024B5071983-07-0606 July 1983 Figure 5-2, Flow Regime 2. ML20024B4921983-07-0606 July 1983 Makeup/Letdown Sys,Automatic Injection Mode. ML20024B4861983-07-0606 July 1983 Makeup/Letdown Sys,Makeup Mode Using Pump 1-B. ML20024B5211983-07-0606 July 1983 Figure 13, Makeup Tank Level. ML20024B5191983-07-0606 July 1983 Figure 12, Calculated Makeup Tank Level,780423. ML20024B5101983-07-0606 July 1983 Figure 6, Makeup Tank Flow Regimes. ML20024B5091983-07-0606 July 1983 Figure 5-3, Flow Regime 3. ML20024B5051983-07-0606 July 1983 Figure 5-1, Flow Regime 1. ML20024B5021983-07-0606 July 1983 Figure 3, Lumped Flow Resistance Model. ML20024B4891983-07-0606 July 1983 Makeup/Letdown Sys,Manual Injection Mode Following Reactor Trip. ML20024B4881983-07-0606 July 1983 Makeup/Letdown Sys,Makeup Mode Following Reactor Trip. ML20024B5131983-07-0606 July 1983 Figure 8, Calculated Makeup Tank Level. ML20259C3851983-06-0303 June 1983 OTSG Tube Repair,Rcs Cleanup;Otsg Test Program. Sheet 65 of 68 ML20259C4001983-06-0303 June 1983 Power Escalation Test Logic. Sheet 68 of 68 ML20259C3901983-06-0303 June 1983 Hot Functional Test Logic. Sheet 66 of 68 ML20259C3941983-06-0303 June 1983 Zero and Low Power Test Logic. Sheet 67 of 68 ML20063B7891982-08-23023 August 1982 Reactor Coolant System Vent to Containment Piping Plan. Sheet 1.No Revision Date 1994-06-02 Category:DRAWINGS-OTHER-APPLICANT'S FACILITY MONTHYEARML20266A7881987-01-13013 January 1987
[Table view]Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 1 of 2 ML20266A7941987-01-13013 January 1987 Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 2 of 2 ML20024B5101983-07-0606 July 1983 Figure 6, Makeup Tank Flow Regimes. ML20024B5021983-07-0606 July 1983 Figure 3, Lumped Flow Resistance Model. ML20024B5051983-07-0606 July 1983 Figure 5-1, Flow Regime 1. ML20024B5091983-07-0606 July 1983 Figure 5-3, Flow Regime 3. ML20024B5131983-07-0606 July 1983 Figure 8, Calculated Makeup Tank Level. ML20024B5141983-07-0606 July 1983 Figure 9, Makeup Tank Level. ML20024B5191983-07-0606 July 1983 Figure 12, Calculated Makeup Tank Level,780423. ML20024B5211983-07-0606 July 1983 Figure 13, Makeup Tank Level. ML20024B5071983-07-0606 July 1983 Figure 5-2, Flow Regime 2. ML20024B5151983-07-0606 July 1983 Figure 10, Calculated Makeup Tank Level. ML20024B5171983-07-0606 July 1983 Figure 11, Makeup Tank Level,780423. ML20259C3851983-06-0303 June 1983 OTSG Tube Repair,Rcs Cleanup;Otsg Test Program. Sheet 65 of 68 ML20259C3901983-06-0303 June 1983 Hot Functional Test Logic. Sheet 66 of 68 ML20259C3941983-06-0303 June 1983 Zero and Low Power Test Logic. Sheet 67 of 68 ML20259C4001983-06-0303 June 1983 Power Escalation Test Logic. Sheet 68 of 68 ML20085A5211982-04-13013 April 1982 Sketch of Piping & Valves ML20085A4381981-09-30030 September 1981 Sketching of Hot Leg ML20259C5941978-12-29029 December 1978 Ventilation & Purge:Reactor Bldg, (Plan at Elevation 305 Ft) ML20259C5261978-12-29029 December 1978 Heating & Ventilation:Emergency Diesel Generator Bldg ML20259C5821978-12-29029 December 1978 Heating,Ventilation & Air Conditioning:Control Bldg, (Mechanical Room) ML20259C5071978-12-29029 December 1978 Heating & Ventilation:Auxiliary Bldg,(Sections & Part Plans Elevation 258 Ft,6 Inches & 354 Ft) ML20259C5041978-10-31031 October 1978 Heating & Ventilation:Auxiliary Bldg,(Sections A-A,B-B, & C-C) ML20259C5591978-10-30030 October 1978 Heating & Ventilation:Coagulator Bldg, (Plan & Sections) ML20259C5921978-10-10010 October 1978 Ventilation & Purge:Reactor Bldg, (Plan at Elevation 282 Ft 6 Inches & 347 Ft,6 Inches) ML20259C5991978-01-29029 January 1978 Ventilation & Purge:Reactor Bldg, (Sections) ML20259C5331978-01-17017 January 1978 Heating,Ventilation & Air Conditioning:Svc Bldg, (Plan Elevation 305 Ft & Sections).19 ML20259C4991977-10-28028 October 1977 Heating & Ventilation:Auxiliary Bldg,(Sections D-D,E-E,F-F & G-G,Elevation 328 Ft) ML20024B5281977-09-24024 September 1977 Graph of Davis Besse Reactor Trip from 9% Full Power.Drawing of PWR & Toledo Edison Organization Chart Encl ML20024B4971977-09-24024 September 1977 Graph Representing Temp & Pressure Levels Vs Time at Davis-Besse on 770924 ML20259C5111977-09-12012 September 1977 Heating & Ventilation:Fuel Handling Bldg, (Plan & Sections, Elevation 347 Ft,6 Inches) ML20259C4881977-09-12012 September 1977 Heating & Ventilation:Control Bldg Area & Svc Bldg, (Plan Elevation 280 Ft,6 Inches ML20259C5371977-09-12012 September 1977 Heating,Ventilation & Air Conditioning:Svc Bldg, (Plan Elevation 322 Ft & 331 Ft,6 Inches & Sections) ML20259C5471977-08-19019 August 1977 Heating,Ventilation & Air Conditioning:Control Bldg-Control Room ML20259C5511977-08-19019 August 1977 Heating,Ventilation & Air Conditioning:Control Bldg-Control Room, (Sections) ML20259C5781977-06-0707 June 1977 Ventilation & Purge:Reactor Bldg, (Enlarged Plan-Elevation 282 Ft,6 Inches) ML20259C6121977-06-0606 June 1977 Floor & Equipment Drains:Turbine Bldg-East Side, (Plan Elevation 305 Ft) ML20259C5301977-01-19019 January 1977 Heating & Ventilation:Emergency Diesel Generator Bldg ML20259C6081976-06-15015 June 1976 Floor & Equipment Drains:Reactor Bldg & Control Bldg, (Area Elevation 282 Ft,6 Inches) ML20259C5551976-06-0808 June 1976 Heating & Ventilation:Circulation Water Chlorinator House, (Plans & Sections) ML20259C5641976-04-15015 April 1976 Heating & Ventilation:Turbine Bldg-North Side, (Elevation 331 Ft,6 Inches Plan & Sections) ML20259C5731976-04-0101 April 1976 Heating & Ventilation:Turbine Bldg-South Side, (Elevation 305 Ft Plan & Sections) ML20259C5441975-12-0404 December 1975 Heating & Ventilation:Turbine Bldg-South Side, (Elevation 281 Ft,6 Inches,Plan & Sections) ML20259C5861975-12-0404 December 1975 Heating,Ventilation & Air Conditioning:Control Bldg, (Cable Room) ML20259C4971975-10-15015 October 1975 Heating & Ventilation:River Water Pump House ML20259C5711975-04-18018 April 1975 Heating & Ventilation:Turbine Bldg-North Side, (Elevation 305 Ft Plan & Sections) ML20259C5401975-04-18018 April 1975 Heating & Ventilation:Turbine Bldg-North Side, (Elevation 281 Ft,6 Inches,Plan & Sections) ML20259C6181974-11-0505 November 1974 Floor & Equipment Drains:Auxiliary & Fuel Handling Bldg (Plan Elevation 258 Ft,6 Inches & 280 Ft,6 Inches) ML20259C6141974-08-0202 August 1974 Floor & Equipment Drains:Reactor Bldg, (Plan Elevation 305 Ft) 1987-01-13 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20259C390&oldid=3144411"