Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
JAFP-23-0048, Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | 31 August 2023 | Supplemental Information for License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | Recently irradiated fuel |
ML19301A504 | 13 August 2019 | JAF-CALC-NBI-00206 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-58A,B and 02-3STU-259A,B) | Safe Shutdown Reactor Vessel Water Level Earthquake |
ML19301A505 | 13 August 2019 | JAF-CALC-NBI-00205 Setpoint Calculation for Vessel Lo-Lo Lvl Primary Containment Isolation Function (02-3LT-57A,B and 02-3STU-258A,B) | Safe Shutdown Reactor Vessel Water Level Earthquake |
JAFP-13-0035, Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment 23 | 17 April 2013 | Response to Request for Additional Information on Core for Plate Rim Hold Down Bolting, Plant Specific Analysis and Inspection Plan, License Renewal Commitment #23 | Finite Element Analysis License Renewal Earthquake Loctite Flow Induced Vibration Power Uprate Affidavit |
JAFP-10-0033, Attachment 2 to JAFP-10-0033, Calculation JAF-CALC-NBS-02052, Revision 4 | 5 March 2010 | Attachment 2 to JAFP-10-0033, Calculation JAF-CALC-NBS-02052, Revision 4 | Safe Shutdown Earthquake |
JAFP-08-0131, Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C | 4 December 2008 | Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C | Weld Overlay Dissimilar Metal Weld |
ML083590339 | 4 December 2008 | Enclosure 2, Structural Integrity Associates, Inc. Calculation 0800769.311 Crack Growth Analysis for Recirculation Inlet Nozzle N-2C | Weld Overlay Dissimilar Metal Weld |
JAFP-08-0131, Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report | 3 December 2008 | Enclosure 3, Structural Integrity Associates, Inc. Calculation 0800769.316 Reconciliation of Recirculation Inlet N2 Nozzle-to-Safe End Weld Overlay Repair with Nozzle Stress Report | Weld Overlay Finite Element Analysis Dissimilar Metal Weld |
ML082100457 | 22 July 2008 | Calculation No. 0800846.302, Revision 0, Comparison of Instrument Nozzle (N16) and Beltline P-T Curves. | Hydrostatic Finite Element Analysis |
JAFP-08-0067, Calculation No. 0800846.302, Revision 0, Comparison of Instrument Nozzle (N16) and Beltline P-T Curves. | 22 July 2008 | Calculation No. 0800846.302, Revision 0, Comparison of Instrument Nozzle (N16) and Beltline P-T Curves. | Hydrostatic Finite Element Analysis |
JAFP-08-0067, Calculation No. 0800846.301, Revision 0, 2 Instrument Nozzle Stress Analysis. | 16 July 2008 | Calculation No. 0800846.301, Revision 0, 2 Instrument Nozzle Stress Analysis. | |
ML082100456 | 26 February 2008 | Calculation No. FITZ-10Q-302, Revision 0, Revised Pressure-Temperature Curves. | Hydrostatic Finite Element Analysis |
JAFP-08-0067, Calculation No. FITZ-10Q-302, Revision 0, Revised Pressure-Temperature Curves. | 26 February 2008 | Calculation No. FITZ-10Q-302, Revision 0, Revised Pressure-Temperature Curves. | Hydrostatic Finite Element Analysis |
JAFP-08-0067, Calculation No. FITZ-10Q-301, Revision 0, Evaluation of Adjusted Reference Temperatures and Reference Temperature Shifts. | 15 February 2008 | Calculation No. FITZ-10Q-301, Revision 0, Evaluation of Adjusted Reference Temperatures and Reference Temperature Shifts. | |
ML082100455 | 15 February 2008 | Calculation No. FITZ-10Q-301, Revision 0, Evaluation of Adjusted Reference Temperatures and Reference Temperature Shifts. | |
JAFP-07-0125, ENT-FLU-002-R-005, Rev 0, James A. FitzPatrick, License Renewal Application - Amendment 14, Fluence Calculation, Non-Proprietary Version | 31 October 2007 | ENT-FLU-002-R-005, Rev 0, James A. FitzPatrick, License Renewal Application - Amendment 14, Fluence Calculation, Non-Proprietary Version | |
ML063630360 | 9 September 2004 | JAFNPP - Site Audit Requests - Offsite Dose Calculation Model (DVP-01.02, Rev 9) | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
JAFP-05-0179, Enclosure 13, Calculation JAF-CALC-ELEC-02610 125VDC B Station Battery Sizing & Voltage Drop Revision 2, Appendix 4, Page 2 of 2, SBO | 16 May 2003 | Enclosure 13, Calculation JAF-CALC-ELEC-02610 125VDC B Station Battery Sizing & Voltage Drop Revision 2, Appendix 4, Page 2 of 2, SBO | Battery sizing |