NL-17-0580, and Vogtle, Annual Non-Radioactive Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2016 | 26 April 2017 | and Vogtle, Annual Non-Radioactive Environmental Operating Reports, Annual Radioactive Effluent Release Reports, and Offsite Dose Calculation Manual for 2016 | Grab sample Offsite Dose Calculation Manual Met Tower Annual Radioactive Effluent Release Report Annual Radiological Environmental Operating Report Process Control Program Grace period Power change |
ML16314A517 | 3 November 2016 | Calculation SNC024-CALC-004, VEGP Determination of Emergency Action Level for Initiating Condition E-HU1. | |
ML16314A521 | 3 November 2016 | Southern Nuclear Design Calculation X6CNA14 | Surveillance Frequency Control Program Pressure Boundary Leakage Power change |
ML16260A101 | 22 September 2016 | Draft Fuel Handling Accident Dose Consequences Using AST Methods | |
ML16260A109 | 22 September 2016 | Draft LOCA Dose Consequences Using AST Methods | |
NL-16-0388, Draft Fuel Handling Accident Dose Consequences Using AST Methods | 22 September 2016 | Draft Fuel Handling Accident Dose Consequences Using AST Methods | |
NL-16-0388, Draft LOCA Dose Consequences Using AST Methods | 22 September 2016 | Draft LOCA Dose Consequences Using AST Methods | |
NL-16-0784, Units 1 and 2 - Response to Request for Additional Information for TSTF-312. Enclosure 2 Excerpts from Calculation SM-96-1064-001 | 25 July 2016 | Units 1 and 2 - Response to Request for Additional Information for TSTF-312. Enclosure 2 Excerpts from Calculation SM-96-1064-001 | |
NL-16-0644, Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manual for 2015 | 27 April 2016 | Annual Radioactive Effluent Release Reports and Offsite Dose Calculation Manual for 2015 | Offsite Dose Calculation Manual Annual Radioactive Effluent Release Report |
NL-16-0007, Technical Specification 3.3.5, Loss of Power Diesel Generator Start Instrumentation, Supplement to License Amendment Request | 12 January 2016 | Technical Specification 3.3.5, Loss of Power Diesel Generator Start Instrumentation, Supplement to License Amendment Request | |
ML14038A022 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5 | Hot Short Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Operator Manual Action Large early release frequency Fire Protection Program |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5 | Hot Short Safe Shutdown Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 3 of 5 | Hot Short Safe Shutdown Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
NL-13-1503, Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML14038A020 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Verion 1.0. Part 1 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Operator Manual Action Large early release frequency Fire Protection Program |
ML14038A021 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part of 5 | Hot Short Safe Shutdown Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML14038A024 | 24 September 2013 | Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 4 of 5 | Hot Short Safe Shutdown Boric Acid Shutdown Margin Mission time Fire Barrier Probabilistic Risk Assessment Large early release frequency |
ML14038A025 | 24 September 2013 | Farley, Units 1 and 2, Calculation Number: SE-C051326701-008, NFPA 805 Fire Risk Evaluations, Version 1.0. Part 5 of 5 | |
ML13198A463 | 30 June 2013 | FAI/13-0392 - Request for Additional Information by the Office of Nuclear Reactor Regulation Joseph M. Farley Nuclear Plants, Units 1 and 2 Southern Nuclear Operating Company, Project No.: SNC-WRAI-CST-Vortex | |
ML14038A027 | 11 September 2012 | Joseph M. Farley, Units 1 and 2, Calculation Number: PRA-BC-F-11-014, Fire Scenario Development, Version 2 | |
NL-13-1503, Joseph M. Farley, Units 1 and 2, Calculations Number: PRA-BC-F-11-004, Fire PRA Logic Model for Farley Nuclear Plants, Version 2 | 28 June 2012 | Joseph M. Farley, Units 1 and 2, Calculations Number: PRA-BC-F-11-004, Fire PRA Logic Model for Farley Nuclear Plants, Version 2 | |
ML14038A030 | 28 June 2012 | Calculations Number: PRA-BC-F-11-004, Fire PRA Logic Model for Farley Nuclear Plants, Version 2 | |
NL-13-1503, Joesph M. Farley, Units 1 and 2, Calculation Number: PRA-BC-F-11-002, Component Selection for Farley Fire PRA, Version 3. Part 1 of 2 | 26 June 2012 | Joesph M. Farley, Units 1 and 2, Calculation Number: PRA-BC-F-11-002, Component Selection for Farley Fire PRA, Version 3. Part 1 of 2 | |
ML14038A031 | 26 June 2012 | Joesph M. Farley, Units 1 and 2, Calculation Number: PRA-BC-F-11-002, Component Selection for Farley Fire PRA, Version 3. Part 1 of 2 | |
NL-13-1503, Calculation Number; PRA-BC-F-11-006, Farley Fire PRA Task 13, Seismic-fire Interactions Assessment, Version 1 | 15 September 2011 | Calculation Number; PRA-BC-F-11-006, Farley Fire PRA Task 13, Seismic-fire Interactions Assessment, Version 1 | Safe Shutdown Fire Barrier Safe Shutdown Earthquake Internal Flooding Operating Basis Earthquake Earthquake Fire Protection Program |
ML071220473 | 31 March 2006 | Offsite Dose Calculation Manual, Version 22 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |
ML061240253 | 30 September 2005 | Offsite Dose Calculation Manual - Version 21 | Grab sample Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program Power change |