 Issue dateTitleTopic
RA-20-0328, Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection Intervals19 January 2021Request for Alternative for Implementation of Extended Reactor Vessel Inservice Inspection IntervalsProbabilistic Risk Assessment
Power change
RA-20-0280, Submittal of IWB-3640 Analytical Evaluation Performed to Accept an ASME Section XI Code Rejected Sub-Surface Flaw14 September 2020Submittal of IWB-3640 Analytical Evaluation Performed to Accept an ASME Section XI Code Rejected Sub-Surface FlawSafe Shutdown Earthquake
Operating Basis Earthquake
Finite Element Analysis
RA-19-0211, 2018 Annual Radioactive Effluent Release Report (ARERR) and Offsite Dose Calculation Manual (ODCM)30 April 20192018 Annual Radioactive Effluent Release Report (ARERR) and Offsite Dose Calculation Manual (ODCM)Grab sample
Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
Annual Radiological Effluent Release Report
Power change
Uranium Hexafluoride
ONS-2018-016, Calculation 0079-0191-CALC-002, Induced Differential Voltage in Control Cables.12 February 2018Calculation 0079-0191-CALC-002, Induced Differential Voltage in Control Cables.
ML16123A14930 April 2016Transmittal of 2015 Annual Radioactive Effluent Release Report, and Revisions 22 and 23 to the Offsite Dose Calculation ManualOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
ONS-2016-039, Offsite Dose Calculation Manual, Revision 277 March 2016Offsite Dose Calculation Manual, Revision 27Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
Uranium Hexafluoride
ONS-2015-043, Oconee, Units 1, 2, and 3 - Offsite Dose Calculation Manual (Odcm), Revision 5616 March 2015Oconee, Units 1, 2, and 3 - Offsite Dose Calculation Manual (Odcm), Revision 56Offsite Dose Calculation Manual
Anticipated operational occurrence
Uranium Hexafluoride
ML15138A12516 March 2015Offsite Dose Calculation Manual (Odcm), Revision 56Offsite Dose Calculation Manual
Anticipated operational occurrence
Uranium Hexafluoride
CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)29 January 2015(Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)
ML14346A00913 August 2014Calculation 13922-0402, Revision 0, Helium Leak Rate Evaluation for 24PHB Dsc.Exemption Request
ML14346A0102 April 2014Calculation 1098-8, Revision 3, Helium Leak Testing Vent and Siphon Ports for Leak Tight Nuhoms Dscs.
ML13305A12225 November 2013Enclosure 3 - Areva Document No. 32-9212003-000, Lst Considering RCS Piping and RVCH Limit for B&W Plant Designs, September 2012Hydrostatic
ML14015A40422 November 2013Attachment 6 - NDQ099920010019 - Ex-Containment Removal Coefficients for Alternative Source Term Analyses, Through Attachment 11 - List of Regulatory CommitmentsDesign basis earthquake
Earthquake
ONS-2014-044, Revision 54 to the Offsite Dose Calculation Manual (OCDM)10 October 2013Revision 54 to the Offsite Dose Calculation Manual (OCDM)Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
Uranium Hexafluoride
ML13214A06214 March 2013Offsite Dose Calculation Manual, Revision 53Offsite Dose Calculation Manual
ML12125A32531 March 20122011 Offsite Dose Calculation Manual Compact DiscOffsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radioactive Effluent Release Report
Annual Radiological Effluent Release Report
Uranium Hexafluoride
ML12080A1991 March 2012Tornado and High Energy Line Break Mitigation License Amendment Requests - Supplemental Responses to Request for Additional Information Nos. 70, 76, and 106Safe Shutdown
ML12080A20029 February 2012Calculation OSC-10008, Revision 1, Calculation Impact AssessmentSafe Shutdown
Test box
ML12080A20221 February 2012Calculation OSC-9510, Revision 1, FMEA for Ssf 4.16kV Alternate Power Feed from Psw EC91876 (OD500928)
ML12123A0185 July 20110-ODCM-001, Revision 0021, Offsite Dose Calculation Manual, Enclosure 5Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML11124A12628 April 2011Response to RAI, License Amendment Request to Change Technical Specification Surveillance Requirement Frequencies to Support 24-Month Fuel Cycles License Amendment Request (LAR) No. 2010-001, Supplement 2
ML11129A29631 January 2011Offsite Dose Calculation Manual 2011Offsite Dose Calculation Manual
ML10126047130 April 2010Enclosure 5, Browns Ferry Nuclear Plant Offsite Dose Calculation Manual 0-OCDM-001, Revision 20Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML10126047430 April 2010Offsite Dose Calculation Manual, Revision 50Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radiological Effluent Release Report
Uranium Hexafluoride
ML11223A01222 September 2009Calculation OSC-9863, Oconee, Units 1, 2 and 3 - License Exemption Using BAW-2308Anticipated operational occurrence
Hydrostatic
Exemption Request
ML09246049819 August 2009Calculation Package 0900833.302, Rev. 0, Steam Dryer Hood Stiffener Stress Relief Modification Stress Reduction Factor (Srf) Computation, Enclosure 4
ML09128026430 April 2009Offsite Dose Calculation Manual 0-ODCM-001, Revision 0019Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML0910002913 April 2009(BFN) - Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to Round 23 Request for Additional Information (RAI) EMCB.205 and EMCB.206
ML09128066531 January 2009Offsite Dose Calculation Manual, Revision 49Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radiological Effluent Release Report
Uranium Hexafluoride
ML09182016927 January 2009Letter from F. Godwin, TVA to NRC on Browns Ferry Proposed Request for Exemption from 10 CFR 50, Appendix R. Paragraph lll.G.2, Fire Protection of Safe Shutdown CapacityHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Exemption Request
Fire Protection Program
ML0902203948 January 2009Response to Round 23 RAI Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate, Enclosure 2 - Structural Integrity Associates, Inc. Calculation Package 0006982.304, Revision 1 and Encls 4 and 5Finite Element Analysis
ML08312030830 October 2008Calculation Package 0006982.304, Extended Power Uprate Main Steam Line Strain Gauge Vibration Monitoring.Finite Element Analysis
ML09104021428 October 2008Calculation No. OSC-9314, Rev. 0, NFPA 805 Transition Risk-Informed, Performance-Based Change Evaluation Methodology.Safe Shutdown
Fire Barrier
Probabilistic Risk Assessment
Operator Manual Action
NFPA 805
Large early release frequency
Power Operated Valves
Fire Protection Program
ML08175008116 June 2008Encl. 6, Calculation Package 0006982.301, Extended Power Uprate Main Steam Line Strain Gage Vibration Monitoring, and Encl. 7, Response to Round 15 Group 4 and Round 17 Request for Additional InformationTime of Discovery
ML09104020629 May 2008Calculation No. OSC-9291, Rev. 0, NFPA 805 Transition B-2 Table.Hot Short
Safe Shutdown
Shutdown Margin
Fire Barrier
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Thermoset
Earthquake
Fire Protection Program
Manual Operator Action
ML09104020828 May 2008Calculation No. OSC-9295, Rev. 1, NFPA 805 Transition B-1 Table/Report.
ML09104020723 May 2008Calculation No. OSC-9293, Rev. 0, NFPA 805 Transition Radioactive Release G-1 Table.Fuel cladding
ML08143050631 January 2008Units, 1, 2 and 3 - 2008 Oconee Offsite Dose Calculation Manual, Revision 48Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radiological Effluent Release Report
Uranium Hexafluoride
ML07213038631 July 2007CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution
ML07213038231 July 2007CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213040131 July 2007CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz
ML07213041531 July 2007CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components
ML07213042931 July 2007C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings
ML07213037531 July 2007CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07158102331 January 2007Rev. 47 to Offsite Dose Calculation Manual (ODCM)Offsite Dose Calculation Manual
Anticipated operational occurrence
Annual Radiological Effluent Release Report
Uranium Hexafluoride
ML06251038221 August 2006Enclosure 2, Browns Ferry, Units 1, 2 & 3 - Calculation MDQ099920060011, Revision 1, Transient Npsh/Containment Pressure Evaluation of RHR and Core Spray Pumps.Safe Shutdown
Coast down
ML06251037421 August 2006Enclosure 1, Browns Ferry, Units 1, 2 & 3 - Calculation MDQ0999970046, Rev 10, NPSH Evaluation of Browns Ferry RHR and CS Pumps.Safe Shutdown
Severe Accident Management Guideline
ML0622300584 August 2006Calculation MDQ099970046, Rev. 9, NPSH Evaluation of Browns Ferry RHR and CS Pumps.Safe Shutdown
Severe Accident Management Guideline
ML0622300634 August 2006Calculation MDQ099920060011, Rev. 0, Transient Npsh/Containment Pressure Evaluation of RHR and Core Spray Pumps.Safe Shutdown
Coast down
ML06118007827 March 2006Unit 3 Calculations for Oconee TAC MC8127FLEX
Stress corrosion cracking