Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML16123A14930 April 2016Transmittal of 2015 Annual Radioactive Effluent Release Report, and Revisions 22 and 23 to the Offsite Dose Calculation ManualOffsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
CNL-14-068, (Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)29 January 2015(Bfn), Units 1, 2 and 3 - Supplement to Proposed Technical Specification Change to Revise the Leakage Rate Through MSIVs (TS-485)
ML14015A40422 November 2013Attachment 6 - NDQ099920010019 - Ex-Containment Removal Coefficients for Alternative Source Term Analyses, Through Attachment 11 - List of Regulatory CommitmentsDesign basis earthquake
Earthquake
ML12123A0185 July 20110-ODCM-001, Revision 0021, Offsite Dose Calculation Manual, Enclosure 5Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML10126047130 April 2010Enclosure 5, Browns Ferry Nuclear Plant Offsite Dose Calculation Manual 0-OCDM-001, Revision 20Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML09246049819 August 2009Calculation Package 0900833.302, Rev. 0, Steam Dryer Hood Stiffener Stress Relief Modification Stress Reduction Factor (Srf) Computation, Enclosure 4
ML09128026430 April 2009Offsite Dose Calculation Manual 0-ODCM-001, Revision 0019Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML0910002913 April 2009(BFN) - Unit 1 - Technical Specifications (TS) Change TS-431 - Extended Power Uprate (EPU) - Response to Round 23 Request for Additional Information (RAI) EMCB.205 and EMCB.206
ML09182016927 January 2009Letter from F. Godwin, TVA to NRC on Browns Ferry Proposed Request for Exemption from 10 CFR 50, Appendix R. Paragraph lll.G.2, Fire Protection of Safe Shutdown CapacityHot Short
Safe Shutdown
Fire Barrier
Operator Manual Action
Multiple Spurious Operation
Emergency Lighting
Significance Determination Process
Exemption Request
Fire Protection Program
ML0902203948 January 2009Response to Round 23 RAI Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate, Enclosure 2 - Structural Integrity Associates, Inc. Calculation Package 0006982.304, Revision 1 and Encls 4 and 5Finite Element Analysis
ML08312030830 October 2008Calculation Package 0006982.304, Extended Power Uprate Main Steam Line Strain Gauge Vibration Monitoring.Finite Element Analysis
ML08175008116 June 2008Encl. 6, Calculation Package 0006982.301, Extended Power Uprate Main Steam Line Strain Gage Vibration Monitoring, and Encl. 7, Response to Round 15 Group 4 and Round 17 Request for Additional InformationTime of Discovery
ML07213038231 July 2007CDI Report No. 07-06NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 2 & 2 Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213037531 July 2007CDI Report No. 07-05NP, Revision 0, Finite Element Model for Stress Assessment of Browns Ferry, Unit 1, Steam Dryer to 250 HzFinite Element Analysis
Liquid penetrant
ML07213038631 July 2007CDI Report No. 07-09NP, Revision 0, Methodology to Predict Full Scale Steam Dryer Loads from In-Plant Measurements, with Inclusion of a Low Frequency Hydrodynamic Contribution
ML07213041531 July 2007CDI Report No. 07-11NP, Revision 0, Dynamics of BWR Steam Dryer Components
ML07213042931 July 2007C.D.I. Technical Memorandum No. 07-26NP, Revision 0, Comparison of Browns Ferry Unit 1 & Unit 2 Main Steam Line Strain Gage / Pressure Readings
ML07213040131 July 2007CDI Report No. 07-10NP, Revision 0, Acoustic and Low Frequency Hydrodynamic Loads at CLTP Power Level on Browns Ferry, Unit 2, Steam Dryer to 250 Hz
ML06251038221 August 2006Enclosure 2, Browns Ferry, Units 1, 2 & 3 - Calculation MDQ099920060011, Revision 1, Transient Npsh/Containment Pressure Evaluation of RHR and Core Spray Pumps.Safe Shutdown
Coast down
ML06251037421 August 2006Enclosure 1, Browns Ferry, Units 1, 2 & 3 - Calculation MDQ0999970046, Rev 10, NPSH Evaluation of Browns Ferry RHR and CS Pumps.Safe Shutdown
Severe Accident Management Guideline
ML0622300634 August 2006Calculation MDQ099920060011, Rev. 0, Transient Npsh/Containment Pressure Evaluation of RHR and Core Spray Pumps.Safe Shutdown
Coast down
ML0622300584 August 2006Calculation MDQ099970046, Rev. 9, NPSH Evaluation of Browns Ferry RHR and CS Pumps.Safe Shutdown
Severe Accident Management Guideline
ML06088046923 March 2006Calculation MDQ0999970046 NPSH Evaluation of Browns Ferry RHR and CS PumpsCoatings
ML0608804159 March 2006Calculation MDQ0999970046, Rev. 008, NPSH Evaluation of Browns Ferry RHR and CS PumpsCoatings
ML05125060028 April 2005Offsite Dose Calculation Manual, Revision 0016Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML05077037011 March 2005Technical Specifications (TS) Change TS-447, Request for Additional Information (RAI) - Extension of Channel Calibration Surveillance Requirement Performance Frequency and Allowable Value RevisionSafe Shutdown Earthquake
ML0612206474 February 2005Offsite Dose Calculation Manual, Revision 17Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML0603806779 June 2004TVA Calculation CDQ1 074 2004 0160, Rev 0, HCLPF Calculations of RHR Heat Exchanger Anchorage for Seismic IPEEE Program.Safe Shutdown
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Weak link
ML0603806769 June 2004TVA Calculation CDQ1 999 2004 0156, Rev. 0, HCLPF Calculations of MCC Anchorage for Seismic IPEEE Program.Safe Shutdown
High winds
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Earthquake
Weak link
ML0614405596 March 2004Enclosure 5, Browns Ferry, Units 1, 2 & 3 - Changes to the Offsite Dose Calculation Manual 2004, Rev 16Grab sample
Offsite Dose Calculation Manual
Annual Radioactive Effluent Release Report
Annual Radiological Environmental Operating Report
Process Control Program
ML0424500614 March 2004Calculation CDN1-000-2004, Seismic Verification of Condenser and Its Anchorage, MSIV Ruggedness Seismic Analysis - Resolution of Pos 15-1.Hydrostatic
Design basis earthquake
Earthquake
ML06038067214 June 1996Calculation CD-Q0000-940339, Rev. 1, Calculation of Basic Parameters for A46 and Individual Plant Examination of External Events (IPEEE) Seismic Program.Safe Shutdown
Earthquake