Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML15308A298 | 24 November 2015 | Report for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 | Safe Shutdown Safe Shutdown Earthquake FLEX Spent Fuel Pool Instrumentation Earthquake |
ML15208A119 | 31 July 2015 | Audit of the Licensee'S Management of Regulatory Commitments | Weld Overlay Power Uprate |
ML15085A227 | 14 April 2015 | October 15, 2014, Onsite Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus | Safe Shutdown B.5.b Mitigating Strategies |
ML14260A130 | 25 November 2014 | April 23-25, 2014, Audit Report Regarding Maximum Extended Load Line Limit Analysis Plus Amendment Including Minimum Stable Film Boiling Temperature and Quench Model | Anticipated operational occurrence Fuel cladding |
ML14007A718 | 19 February 2014 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) | Safe Shutdown High winds Reactor Vessel Water Level Ultimate heat sink Safe Shutdown Earthquake Internal Flooding Coatings Operating Basis Earthquake Emergency Lighting FLEX Tornado Generated Missile Fukushima Dai-Ichi Seismically rugged Design basis earthquake Severe Accident Management Guideline Frazil ice Battery sizing Earthquake |
ML13121A333 | 17 May 2013 | Audit Report for the April 3-4, 2013 Audit of the Calculations Related to the Request to Revise the Criticality Safety Analysis and TS 4.3.1, Criticality, and Delete Spent Fuel Pool Loading Criteria License Condition | |
ML12228A516 | 22 August 2012 | Audit of the Licensee'S Management of Regulatory Commitments, Audit Performed August 4-5, 2011 | Cyber Security Mururoa Power Uprate |
ML12165A387 | 20 June 2012 | Scoping and Screening Methodology Audit Report Regarding the Grand Gulf Nuclear Station, Unit 1, License Renewal Application | Aging Management |
ML11350A053 | 4 January 2012 | Plan for the Scoping and Screening Regulatory Audit Regarding the Grand Gulf Nuclear Station, Unit 1 License Renewal Application Review | Aging Management Earthquake |
ML111720830 | 10 August 2011 | Report of May 24, 2011 Audit of Entergy and General Electric Hitachi Nuclear Energy Americas LLC Calculations Related to Technical Specification Changes and Supporting the Extended Power Uprate | |
ML080700209 | 20 March 2008 | Audit Report of Licensee'S Regulatory Commitment Management Program, for February 19-20, 2008 Audit | Fire Protection Program |
ML052440334 | 14 September 2005 | Audit Report for Grand Gulf Implementation of Stability Long Term Solution E1-A |