ML20263N143 | 9 March 1984 | Marked-up Equipment Location:Turbine Building Plan Ground Floor El 23 Ft. Rev Date Illegible. Acutual Drawing NUMBER:13984.20-EKS-64-2 | |
ML20263N141 | 9 March 1984 | Marked-up Equipment Location:Reactor Building Plan Ground Floor El 23 Ft. Rev Date Illegible. Actual Drawing NUMBER:13984.20-EKS-62-2 | |
ML20263N149 | 26 September 1983 | Marked-up Equipment Location:Reactor Building Plan - El 37 Ft. Actual Drawing NUMBER:13984.20-EKS-66-2 | |
ML20263N146 | 26 September 1983 | Marked-up Equipment Location:Turbine Building Plan El 37 Ft. Actual Drawing NUMBER:13984.20-EKS-65-2 | |
ML20263N151 | 26 September 1983 | Marked-up Equipment Location:Reactor Building Plan - El 51 Ft. Actual Drawing NUMBER:13984.20-EKS-67-2 | |
ML20263N138 | 24 September 1983 | Marked-up Equipment Location:Reactor Building Plan Basement El (-) 17 Ft 6 Inches. Actual Drawing NUMBER:13984.20-EKS-61-2 | |
ML20259D204 | 19 July 1983 | Field Assembly Suppression Chamber Columns Girders & Vent Header Supports. Rev Date Illegible | |
ML20259D209 | 16 September 1981 | Saddle Support Assembly (Torus). Sheet 1 of 2 | |
ML20260F542 | 15 August 1980 | Fire Protection Sys,Plan at Elevation 23 Ft | |
ML20260F547 | 15 August 1980 | Fire Protection Sys,Plan at Elevation 37 Ft | |
ML20260F552 | 15 August 1980 | Fire/Raceway Interaction Review,Reactor Bldg Areas 1 & 3, Plan Above Elevation 23 Ft, as-built | |
ML20260F558 | 15 August 1980 | Fire/Raceway Interaction Review,Reactor Bldg Areas 1 & 3, Plan Above Elevation 23 Ft | |
ML20260F539 | 15 August 1980 | Fire Protection Sys,Plan at Elevation 51 Ft & 74 Ft 2 Inches | |
ML20260F533 | 15 August 1980 | Fire Protection Sys,Plan at Elevation 17 Ft 6 Inches to 15 Ft | |
ML20260F528 | 31 July 1980 | Conduit & Tray Layout:Turbine Bldg - Area 9,Plan Below Elevation 23 Ft, as-built Update.Fire Hazard Analysis of Area 3.10 Encl | |
ML20260K449 | 8 May 1979 | Equipment Location Reactor Building Plan Ground Floor - El 23 Ft, as-built | |
ML20260K458 | 9 February 1979 | Equipment Location Turbine Building Plan Ground Floor El 23 Ft, as-built | |
ML20260K453 | 9 February 1979 | Equipment Location Reactor Building Plan - El 51 Ft, as- Built | |
ML20262K061 | 4 February 1979 | Marked-up Equipment Location:Reactor Building Plan Ground Floor - El 28 Ft | |
ML20260F593 | 4 October 1978 | Fire/Raceway Interaction Review,Cable Spreading Room,Plan Elevation 23 Ft. Sheet 1 of 2 | |
ML20260F584 | 7 September 1978 | Fire/Raceway Interaction Review,Turbine Bldg - Area 7, Plan Below Elevation 23 Ft & Below Elevation 37 Ft | |
ML20260F598 | 7 September 1978 | Fire/Raceway Interaction Review,Turbine Bldg - Area 7, Plan Below Elevation 23 Ft & Below Elevation 37 Ft | |
ML20260F588 | 15 July 1978 | Fire/Raceway Interaction Review,Turbine Bldg - Area 7, Plan Below Elevation 51 Ft & Above 51 Ft | |
ML20260F562 | 6 July 1978 | Fire/Raceway Interaction Review,Reactor Bldg Areas 1 & 3, Plan Above Elevation 51 Ft | |
ML20260F578 | 5 July 1978 | Fire/Raceway Interaction Review,Turbine Bldg Area 9, Evaluation Below 51 Ft | |
ML20260F573 | 5 May 1978 | Fire/Raceway Interaction Review,Turbine Bldg - Area 9, Plan Below Elevation 37 Ft | |
ML20260F567 | 1 May 1978 | Fire/Raceway Interaction Review,Reactor Auxiliary Bay Area 2,Plan Elevation 3 Ft & Elevation (-) 17 Ft | |
ML20260H394 | 24 February 1977 | Reactor & Turbine Bldgs:Floor Plan at Elevation 23 Ft, 0 Inches:Doors & Walls Fire Rating | |
ML20262K059 | 5 October 1973 | Marked-up Equipment Location:Reactor Building Plan - El 74 Ft 3 Inches & El 91 Ft 3 Inches | |
ML20260K462 | 5 October 1973 | Equipment Location Turbine Building Plan El 37 Ft | |
ML20260K465 | 5 October 1973 | Equipment Location Reactor Building Plan El 37 Ft |