ML20260F567
From kanterella
Jump to navigation
Jump to search
ML20260F567 | |
Person / Time | |
---|---|
Site: | Pilgrim |
Issue date: | 05/01/1978 |
From: | BECHTEL GROUP, INC. |
To: | BOSTON EDISON CO. |
Shared Package | |
ML19344A640 | List: |
References | |
CON-6498 E-309-V-4, NUDOCS 8008210424 | |
Download: ML20260F567 (1) | |
Similar Documents at Pilgrim | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20263N1431984-03-0909 March 1984
[Table view]Marked-up Equipment Location:Turbine Building Plan Ground Floor El 23 Ft. Rev Date Illegible. Acutual Drawing NUMBER:13984.20-EKS-64-2 ML20263N1411984-03-0909 March 1984 Marked-up Equipment Location:Reactor Building Plan Ground Floor El 23 Ft. Rev Date Illegible. Actual Drawing NUMBER:13984.20-EKS-62-2 ML20263N1491983-09-26026 September 1983 Marked-up Equipment Location:Reactor Building Plan - El 37 Ft. Actual Drawing NUMBER:13984.20-EKS-66-2 ML20263N1461983-09-26026 September 1983 Marked-up Equipment Location:Turbine Building Plan El 37 Ft. Actual Drawing NUMBER:13984.20-EKS-65-2 ML20263N1511983-09-26026 September 1983 Marked-up Equipment Location:Reactor Building Plan - El 51 Ft. Actual Drawing NUMBER:13984.20-EKS-67-2 ML20263N1381983-09-24024 September 1983 Marked-up Equipment Location:Reactor Building Plan Basement El (-) 17 Ft 6 Inches. Actual Drawing NUMBER:13984.20-EKS-61-2 ML20259D2041983-07-19019 July 1983 Field Assembly Suppression Chamber Columns Girders & Vent Header Supports. Rev Date Illegible ML20259D2091981-09-16016 September 1981 Saddle Support Assembly (Torus). Sheet 1 of 2 ML20260F5421980-08-15015 August 1980 Fire Protection Sys,Plan at Elevation 23 Ft ML20260F5471980-08-15015 August 1980 Fire Protection Sys,Plan at Elevation 37 Ft ML20260F5521980-08-15015 August 1980 Fire/Raceway Interaction Review,Reactor Bldg Areas 1 & 3, Plan Above Elevation 23 Ft, as-built ML20260F5581980-08-15015 August 1980 Fire/Raceway Interaction Review,Reactor Bldg Areas 1 & 3, Plan Above Elevation 23 Ft ML20260F5391980-08-15015 August 1980 Fire Protection Sys,Plan at Elevation 51 Ft & 74 Ft 2 Inches ML20260F5331980-08-15015 August 1980 Fire Protection Sys,Plan at Elevation 17 Ft 6 Inches to 15 Ft ML20260F5281980-07-31031 July 1980 Conduit & Tray Layout:Turbine Bldg - Area 9,Plan Below Elevation 23 Ft, as-built Update.Fire Hazard Analysis of Area 3.10 Encl ML20260K4491979-05-0808 May 1979 Equipment Location Reactor Building Plan Ground Floor - El 23 Ft, as-built ML20260K4581979-02-0909 February 1979 Equipment Location Turbine Building Plan Ground Floor El 23 Ft, as-built ML20260K4531979-02-0909 February 1979 Equipment Location Reactor Building Plan - El 51 Ft, as- Built ML20262K0611979-02-0404 February 1979 Marked-up Equipment Location:Reactor Building Plan Ground Floor - El 28 Ft ML20260F5931978-10-0404 October 1978 Fire/Raceway Interaction Review,Cable Spreading Room,Plan Elevation 23 Ft. Sheet 1 of 2 ML20260F5841978-09-0707 September 1978 Fire/Raceway Interaction Review,Turbine Bldg - Area 7, Plan Below Elevation 23 Ft & Below Elevation 37 Ft ML20260F5981978-09-0707 September 1978 Fire/Raceway Interaction Review,Turbine Bldg - Area 7, Plan Below Elevation 23 Ft & Below Elevation 37 Ft ML20260F5881978-07-15015 July 1978 Fire/Raceway Interaction Review,Turbine Bldg - Area 7, Plan Below Elevation 51 Ft & Above 51 Ft ML20260F5621978-07-0606 July 1978 Fire/Raceway Interaction Review,Reactor Bldg Areas 1 & 3, Plan Above Elevation 51 Ft ML20260F5781978-07-0505 July 1978 Fire/Raceway Interaction Review,Turbine Bldg Area 9, Evaluation Below 51 Ft ML20260F5731978-05-0505 May 1978 Fire/Raceway Interaction Review,Turbine Bldg - Area 9, Plan Below Elevation 37 Ft ML20260F5671978-05-0101 May 1978 Fire/Raceway Interaction Review,Reactor Auxiliary Bay Area 2,Plan Elevation 3 Ft & Elevation (-) 17 Ft ML20260H3941977-02-24024 February 1977 Reactor & Turbine Bldgs:Floor Plan at Elevation 23 Ft, 0 Inches:Doors & Walls Fire Rating ML20262K0591973-10-0505 October 1973 Marked-up Equipment Location:Reactor Building Plan - El 74 Ft 3 Inches & El 91 Ft 3 Inches ML20260K4621973-10-0505 October 1973 Equipment Location Turbine Building Plan El 37 Ft ML20260K4651973-10-0505 October 1973 Equipment Location Reactor Building Plan El 37 Ft 1984-03-09 Category:DRAWINGS MONTHYEARML20262E7981994-08-29029 August 1994
[Table view]Reactor Assembly.Sheet 2 of 2 ML20262E8031994-08-29029 August 1994 Shroud.Sheet 1 of 5 ML20262E8131994-08-29029 August 1994 Core Support ML20262E7941994-08-29029 August 1994 Reactor Assembly.Sheet 1 of 2 ML20262E8081994-08-29029 August 1994 Top Guide for Core Structure ML20260L7751989-12-12012 December 1989 Single Line Relay & Meter Diagram 125 V & 250 V DC Systems. Actual Rev STATUS:E26 ML20260K9771989-11-10010 November 1989 Main Breakwater Camera Locations & Survey Information. Sheet 2. Actual Rev STATUS:E1 ML20260L7711989-08-0808 August 1989 Single Line Meter & Relay Diagram 480 V System - Load Centers & Motor Control Centers B10 & B20. Actual Rev STATUS:E23 ML20260L7791989-08-0808 August 1989 Schematic DIAGRAM-480V System 480V LC B1 & B2 Tie Breakers to 480V LC B6. Actual Rev STATUS:E2 ML20266C7421988-08-25025 August 1988 Main Breakwater Camera Locations & Survey Info. Sheet 2 of 2. Actual Rev STATUS:E0 ML20265D5451987-12-31031 December 1987 Elementary Diagram ATWS System Instrument Data Sheet. Sheet 2. Actual Rev STATUS:E2 ML20265D5491987-12-31031 December 1987 Elementary Diagram ATWS System. Sheet 1. Actual Rev STATUS:E1 ML20265D5531987-12-31031 December 1987 Elementary Diagram ATWS System. Sheet 3. Actual Rev STATUS:E1 ML20265D5561987-12-31031 December 1987 Elementary Diagram ATWS System. Sheet 7. Actual Rev STATUS:E3 ML20265D5631987-12-31031 December 1987 Elementary Diagram ATWS System. Actual Rev STATUS:E3 ML20265D5671987-12-31031 December 1987 Functional Control Diagram Recirculation Flow Control System. Sheet 1 of 3. Actual Rev STATUS:E4 ML20265D5591987-12-0202 December 1987 Elementary Diagram ATWS System. Sheet 12. Actual Rev STATUS:E0 ML20266J8881987-08-30030 August 1987 Main Breakwater Camera Locations & Survey Information. Sheet 1 of 2.Drawing Consists of 2 Aperture Cards ML20266C0201987-04-14014 April 1987 PS15A B C & D-2-ED PS15-3-ED Thru PENET.X-8 ML20265A8581986-10-24024 October 1986 Bsc Plan No. 1455-7A Ground Control Data. Drawing Consists of Two Aperture Cards ML20266A1111985-10-31031 October 1985 Functional Description:Wet Pipe Sprinkler Sys. Sheet 14 ML20262G7821985-10-24024 October 1985 P&Id:Radwaste Collection System. Rev Date Illegible ML20262G7701985-10-24024 October 1985 P&Id:Diesel Oil Storage & Transfer System. Rev Date Illegible ML20262G7891985-10-24024 October 1985 P&Id:Post Accident Sampling & H2 & O2 Analyzer System. Sheet 2 of 3.Rev Date Illegible ML20262G7741985-10-24024 October 1985 P&Id:Containment Atmospheric Control Sys. Sheet 1 of 2. Rev Date Illegible. Actual Rev NUBER:E10 ML20262G7781985-10-24024 October 1985 P&Id:Containment Atmospheric Control System. Sheet 2 of 2. Rev Date Illegible ML20262G7851985-10-24024 October 1985 P&Id:Post Accident Sampling & H2 & O2 Analyzer System. Sheet 1 of 3.Rev Date Illegible ML20262G7661985-10-24024 October 1985 P&Id:Compressed Air System. Sheet 1 of 2.Rev Date Illegible. Actual Rev NUMBER:E11 ML20262G7631985-10-24024 October 1985 P&Id:Cooling Water System Reactor Building. Rev Date Illegible. Actual Rev NUMBER:E14 ML20262G7931985-10-24024 October 1985 Piping & Instrumentation Diagram:Residual Heat Removal System. Sheet 1 of 2.Rev Date Illegible. Actual Rev NUMBER:E12 ML20262G8251985-10-24024 October 1985 Control Rod Drive Hydraulic System. Sheet 1 of 2.Rev Date Illegible. Actual Rev NUMBER:E12 ML20262G7961985-10-24024 October 1985 Piping and Instrumentation Diag:Residual Heat Removal System. Sheet 2 of 2 Rev Date Illegible ML20262E4101985-07-22022 July 1985 Worksheet Showing Breakwaters,Channels & Soundings. Drawing Consists of Two Aperture Cards ML20262G8111985-07-18018 July 1985 P&Id:Rcic System. Sheet 1 ML20262G8181985-07-18018 July 1985 P&Id:Reactor Water Clean-Up System. Actual Rev NUMBER:E11 ML20262G8041985-07-18018 July 1985 P&Id:Hpci System. Sheet 1 ML20262G8081985-05-16016 May 1985 P&Id:Hpci System. Sheet 2 ML20262G8331985-04-0909 April 1985 Nuclear Boiler. Sheet 1 ML20262G8291985-01-10010 January 1985 P&Id:Recirc Pump Instrumentation ML20262G8221984-12-21021 December 1984 P&Id:Standby Liquid Control System ML20262G7591984-12-19019 December 1984 P&Id:Service Water,Screen Wash & Hypo-Chlorination Systems. Actual Rev NUMBER:E10 ML20262G8001984-12-14014 December 1984 Core Spray System ML20262G8141984-11-0808 November 1984 P&Id:Rcic System. Sheet 2 ML20263N1411984-03-0909 March 1984 Marked-up Equipment Location:Reactor Building Plan Ground Floor El 23 Ft. Rev Date Illegible. Actual Drawing NUMBER:13984.20-EKS-62-2 ML20263N1431984-03-0909 March 1984 Marked-up Equipment Location:Turbine Building Plan Ground Floor El 23 Ft. Rev Date Illegible. Acutual Drawing NUMBER:13984.20-EKS-64-2 ML20263N1461983-09-26026 September 1983 Marked-up Equipment Location:Turbine Building Plan El 37 Ft. Actual Drawing NUMBER:13984.20-EKS-65-2 ML20263N1491983-09-26026 September 1983 Marked-up Equipment Location:Reactor Building Plan - El 37 Ft. Actual Drawing NUMBER:13984.20-EKS-66-2 ML20263N1511983-09-26026 September 1983 Marked-up Equipment Location:Reactor Building Plan - El 51 Ft. Actual Drawing NUMBER:13984.20-EKS-67-2 ML20263N1381983-09-24024 September 1983 Marked-up Equipment Location:Reactor Building Plan Basement El (-) 17 Ft 6 Inches. Actual Drawing NUMBER:13984.20-EKS-61-2 ML20263C1941983-07-27027 July 1983 RHR Spray Header 1994-08-29 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20260F567&oldid=3142346"