ML20263C31318 June 1981Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (CRD Transfer Cart Removal Winch - 00H34 CRD Transfer Cart Path).Sheet 22.No Revision Date
ML20263C31018 June 1981Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building CRD Removal Platform Winch - Hoist (Wall Mounted) 20H20,30H20).Sheet 21.No Revision Date
ML20263C30218 June 1981General Arrangement:Plan at El 116 Ft, as-built. (Condensate Pump Hoist - 20H15 - 30H15 Condensate Pump Aux Hoist - 20H43 - 30H43 Load Path).Sheet 19.No Revision Date
ML20263C35318 June 1981Equipment Location:Reactor and Radwaste Building Plan at El 165 Ft, as-built.(Precoat Material Handling - 20H54 - 30H54 Vertical Load Path).Sheet 37.No Revision Date
ML20263C30018 June 1981Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building Recirc Pump Motor Hoists Load Path).Sheet 18.No Revision Date
ML20263C29418 June 1981Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building Recir Pump Motor-Gen Hoist 20H06 - 30H06 Load Path).Sheet 16
ML20263C34418 June 1981Plot Plan. (Restricted Areas for 15 Ton Yard Crane 00H56 - Ground Floor).Sheet 34.No Revision Date
ML20263C29718 June 1981Cw Pump Structure Plan Elev 112 Ft & 116 Ft, as-built. (Pump Structure Crane-00H16 - Load Path Pump Base - Pump Bldg Floor - El 112 Ft Pull Up Hatch & Load Path - Pump Bldg Roof - El 130 Ft 6 Inches Ground Floor - El 116 Ft).Sheet 17
ML20263C3426 February 1977Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (FP Filter Demin Hoist - 00H55 Filter Load Path). Sheet 33
ML20263C3156 February 1977Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (CRD Removal Hoist - 20H05 - 30H05 Load Path). Sheet 23
ML20263C3176 February 1977Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Equipment Access Lock Removal Hoist - 20H04 - 30H04 Load Path).Sheet 24
ML20263C3206 February 1977Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Personnel Lock Hoist - 20H22 - 30H22 Personnel Lock Load Path).Sheet 25
ML20263C35615 December 1975Emergency Cooling Tower Switchgear Area, as-built. (Emergency CT Emergency Cooling Tower Hoist - 00H49 Emerg CT Jib Crane - 00H49).Sheet 38
ML20263C30515 December 1975Shop & Warehouse 5 Ton Crane Runway, as-built.(Machine Shop Crane - 00H12 Load Path).Sheet 20
ML20263C35022 November 1975Stack Requirements, as-built.(Off Gas Stack Hoist Jib Crane - 00H46 Load Path).Sheet 36
ML20263C34029 October 1975Equipment Location:Recombiner Building Plans and Section, as-built.(Recombiner Building Hoist - 00H42 Load Path). Sheet 32
ML20263C35923 October 1975General Arrangement Plan at El 165 Ft, as-built. (Radwaste Bldg Equipment Hoist Load Path).Sheet 40
ML20263C36223 October 1975General Arrangement Plan at El 135 Ft, as-built. (Reactor Bldg CRD Jib Crane Load Path).Sheet 41
ML20263C36523 October 1975General Arrangement Plan at El 195 Ft, as-built. (Reactor Building - El 195 Ft CRD Transport Jib Crane Load Path).Sheet 42
ML20263C26923 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Drywell Head Load Path).Sheet 6
ML20263C27923 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Fuel Load Path).Sheet 10
ML20263C28223 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 Refueling Floor - Fuel Shipping Cask Load Path).Sheet 11
ML20263C27723 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Separator Load Path).Sheet 9
ML20263C27423 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Dryer Load Path).Sheet 8
ML20263C27123 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane - 20H01 - 30H01 Refueling Floor - RPV Head Load Path).Sheet 7
ML20263C25423 October 1973Equipment Location:Reactor and Radwaste Building, as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas for the Movement of Heavy Loads During Refueling.)Sheet 2
ML20263C26623 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Slot Plug Load Path).Sheet 5
ML20263C26323 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane - 20H01 - 30H01 (Stm Dryer-Sep) Pool Plug - Load Path).Sheet 4
ML20263C26023 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor Shield Plug Load Path).Sheet 3
ML20263C25723 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas for the Movement of Heavy Loads During Plant Operation.) Sheet 1
ML20263C37423 October 1973Equipment Location:Reactor Building Plan at El 195 Ft, as-built.(Reactor Bldg - El 195 Ft CRD Maintenance Bridge Crane Load Path).Sheet 44
ML20263C28523 October 1973Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 & 30H01 Refueling Floor - New Fuel Load Path).Sheet 12
ML20263C28823 October 1973General Arrangement:Plan at El 165 Ft, as-built. (TB Crane - OAH09 - OBH09 - Turbine & Generator Rotor & Parts Load Path Units 2 & 3).Sheet 13
ML20263C29123 October 1973Equipment Location:Turbine Building Plan at El 165 Ft, as-built.((Reactor) Feed Pump Crane - 20H07 - 30H07 Pump & Turbine Load Path).Sheet 14
ML20263C37123 October 1973General Arrangement Plan at El 195 Ft, as-built. (Reactor Building - El 195 Ft CRD Storage Jib Crane Load Path).Sheet 43
ML20263C34716 June 1973Cw Pump Structure Plan Elev 112 Ft & 116 Ft, as-built. (Cw Pump Structure Trash Handling Equipment Hoist - 20H50 - 30H50 Load Path).Sheet 35
ML20263C36812 June 1973Cw Screen Structure Weatherproof Building, as-built. (Screen Structure Trash Handling Eqpt Hoist - 2AH45,2BH45, 3AH45 & 3BH45).Sheet 39
ML20263C3256 February 1973Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (5000 Escapement Door Lift Winch - 00H32 Vertical Load Path).Sheet 27
ML20263C3286 February 1973Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (2500 Escapement Door Lift Winch - 0AH33 - 0BH33 Vertical Load Path).Sheet 28
ML20263C3316 February 1973Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (RW Building Demin Hoist - 00H35 Load Path). Sheet 29
ML20263C3346 February 1973Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Torus Equipment Removal Hoist 00H37 - Load Path).Sheet 30
ML20263C32223 January 1973Equipment Location:Turbine Building Plan at El 135 Ft, as-built.(Condensate Demin Hoist - 20H25 - 30H25 Condensate Demin Aux Hoist - 20H47 - 30H47 Load Path).Sheet 26
ML20263C33716 June 1972Off-Gas Filter Building Plans,Elevation,Details, as-built. (Off Gas Filter Trolley - 00H53 Load Path).Sheet 31