Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20263C313 | 18 June 1981 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (CRD Transfer Cart Removal Winch - 00H34 CRD Transfer Cart Path).Sheet 22.No Revision Date | |
ML20263C310 | 18 June 1981 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building CRD Removal Platform Winch - Hoist (Wall Mounted) 20H20,30H20).Sheet 21.No Revision Date | |
ML20263C302 | 18 June 1981 | General Arrangement:Plan at El 116 Ft, as-built. (Condensate Pump Hoist - 20H15 - 30H15 Condensate Pump Aux Hoist - 20H43 - 30H43 Load Path).Sheet 19.No Revision Date | |
ML20263C353 | 18 June 1981 | Equipment Location:Reactor and Radwaste Building Plan at El 165 Ft, as-built.(Precoat Material Handling - 20H54 - 30H54 Vertical Load Path).Sheet 37.No Revision Date | |
ML20263C300 | 18 June 1981 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building Recirc Pump Motor Hoists Load Path).Sheet 18.No Revision Date | |
ML20263C294 | 18 June 1981 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Reactor Building Recir Pump Motor-Gen Hoist 20H06 - 30H06 Load Path).Sheet 16 | |
ML20263C344 | 18 June 1981 | Plot Plan. (Restricted Areas for 15 Ton Yard Crane 00H56 - Ground Floor).Sheet 34.No Revision Date | |
ML20263C297 | 18 June 1981 | Cw Pump Structure Plan Elev 112 Ft & 116 Ft, as-built. (Pump Structure Crane-00H16 - Load Path Pump Base - Pump Bldg Floor - El 112 Ft Pull Up Hatch & Load Path - Pump Bldg Roof - El 130 Ft 6 Inches Ground Floor - El 116 Ft).Sheet 17 | |
ML20263C342 | 6 February 1977 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (FP Filter Demin Hoist - 00H55 Filter Load Path). Sheet 33 | |
ML20263C315 | 6 February 1977 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (CRD Removal Hoist - 20H05 - 30H05 Load Path). Sheet 23 | |
ML20263C317 | 6 February 1977 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Equipment Access Lock Removal Hoist - 20H04 - 30H04 Load Path).Sheet 24 | |
ML20263C320 | 6 February 1977 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Personnel Lock Hoist - 20H22 - 30H22 Personnel Lock Load Path).Sheet 25 | |
ML20263C356 | 15 December 1975 | Emergency Cooling Tower Switchgear Area, as-built. (Emergency CT Emergency Cooling Tower Hoist - 00H49 Emerg CT Jib Crane - 00H49).Sheet 38 | |
ML20263C305 | 15 December 1975 | Shop & Warehouse 5 Ton Crane Runway, as-built.(Machine Shop Crane - 00H12 Load Path).Sheet 20 | |
ML20263C350 | 22 November 1975 | Stack Requirements, as-built.(Off Gas Stack Hoist Jib Crane - 00H46 Load Path).Sheet 36 | |
ML20263C340 | 29 October 1975 | Equipment Location:Recombiner Building Plans and Section, as-built.(Recombiner Building Hoist - 00H42 Load Path). Sheet 32 | |
ML20263C359 | 23 October 1975 | General Arrangement Plan at El 165 Ft, as-built. (Radwaste Bldg Equipment Hoist Load Path).Sheet 40 | |
ML20263C362 | 23 October 1975 | General Arrangement Plan at El 135 Ft, as-built. (Reactor Bldg CRD Jib Crane Load Path).Sheet 41 | |
ML20263C365 | 23 October 1975 | General Arrangement Plan at El 195 Ft, as-built. (Reactor Building - El 195 Ft CRD Transport Jib Crane Load Path).Sheet 42 | |
ML20263C269 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Drywell Head Load Path).Sheet 6 | |
ML20263C279 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Fuel Load Path).Sheet 10 | |
ML20263C282 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 Refueling Floor - Fuel Shipping Cask Load Path).Sheet 11 | |
ML20263C277 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Separator Load Path).Sheet 9 | |
ML20263C274 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Steam Dryer Load Path).Sheet 8 | |
ML20263C271 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane - 20H01 - 30H01 Refueling Floor - RPV Head Load Path).Sheet 7 | |
ML20263C254 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building, as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas for the Movement of Heavy Loads During Refueling.)Sheet 2 | |
ML20263C266 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor - Slot Plug Load Path).Sheet 5 | |
ML20263C263 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane - 20H01 - 30H01 (Stm Dryer-Sep) Pool Plug - Load Path).Sheet 4 | |
ML20263C260 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 - 30H01 Refueling Floor Shield Plug Load Path).Sheet 3 | |
ML20263C257 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(Refueling Floor - El 234 Ft Restricted & Special Precaution Areas for the Movement of Heavy Loads During Plant Operation.) Sheet 1 | |
ML20263C374 | 23 October 1973 | Equipment Location:Reactor Building Plan at El 195 Ft, as-built.(Reactor Bldg - El 195 Ft CRD Maintenance Bridge Crane Load Path).Sheet 44 | |
ML20263C285 | 23 October 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 234 Ft, as-built.(R/B Crane 20H01 & 30H01 Refueling Floor - New Fuel Load Path).Sheet 12 | |
ML20263C288 | 23 October 1973 | General Arrangement:Plan at El 165 Ft, as-built. (TB Crane - OAH09 - OBH09 - Turbine & Generator Rotor & Parts Load Path Units 2 & 3).Sheet 13 | |
ML20263C291 | 23 October 1973 | Equipment Location:Turbine Building Plan at El 165 Ft, as-built.((Reactor) Feed Pump Crane - 20H07 - 30H07 Pump & Turbine Load Path).Sheet 14 | |
ML20263C371 | 23 October 1973 | General Arrangement Plan at El 195 Ft, as-built. (Reactor Building - El 195 Ft CRD Storage Jib Crane Load Path).Sheet 43 | |
ML20263C347 | 16 June 1973 | Cw Pump Structure Plan Elev 112 Ft & 116 Ft, as-built. (Cw Pump Structure Trash Handling Equipment Hoist - 20H50 - 30H50 Load Path).Sheet 35 | |
ML20263C368 | 12 June 1973 | Cw Screen Structure Weatherproof Building, as-built. (Screen Structure Trash Handling Eqpt Hoist - 2AH45,2BH45, 3AH45 & 3BH45).Sheet 39 | |
ML20263C325 | 6 February 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (5000 Escapement Door Lift Winch - 00H32 Vertical Load Path).Sheet 27 | |
ML20263C328 | 6 February 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (2500 Escapement Door Lift Winch - 0AH33 - 0BH33 Vertical Load Path).Sheet 28 | |
ML20263C331 | 6 February 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (RW Building Demin Hoist - 00H35 Load Path). Sheet 29 | |
ML20263C334 | 6 February 1973 | Equipment Location:Reactor and Radwaste Building Plan at El 135 Ft. (Torus Equipment Removal Hoist 00H37 - Load Path).Sheet 30 | |
ML20263C322 | 23 January 1973 | Equipment Location:Turbine Building Plan at El 135 Ft, as-built.(Condensate Demin Hoist - 20H25 - 30H25 Condensate Demin Aux Hoist - 20H47 - 30H47 Load Path).Sheet 26 | |
ML20263C337 | 16 June 1972 | Off-Gas Filter Building Plans,Elevation,Details, as-built. (Off Gas Filter Trolley - 00H53 Load Path).Sheet 31 |