Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML0832301115 November 2008Monticello Nuclear Generating Plant, License Amendment Request: Extended Power UprateSafe Shutdown
Shutdown Margin
Reactor Vessel Water Level
Safety Limit Minimum Critical Power Ratio
Ultimate heat sink
Anticipated operational occurrence
Probabilistic Risk Assessment
Squib
Local Leak Rate Testing
Scram Discharge Volume
Feedwater Controller Failure
Large early release frequency
Safeguards Contingency Plan
License Renewal
Control of Heavy Loads
Fuel cladding
Environmental Justice
Flow Induced Vibration
Power Uprate
Affidavit
ML08101019431 March 2008Monticello, MNGP Extended Power Uprate Environmental AssessmentLarge early release frequency
License Renewal
Control of Heavy Loads
Fuel cladding
Environmental Justice
Power Uprate
Affidavit
ML13064A43520 March 2008CA-95-075, Main Steam Line High Flow Setpoint, Attachment 4Zebra Mussel
Large early release frequency
License Renewal
Control of Heavy Loads
Fuel cladding
Fire Protection Program
Environmental Justice
Power Uprate
Affidavit
ML06249007831 August 2006NUREG-1437, Supp 26, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 26 Regarding Monticello Nuclear Generating Plant, Final Report.Safe Shutdown
High winds
Offsite Dose Calculation Manual
Internal Flooding
Zebra Mussel
Aging Management
Annual Radiological Environmental Operating Report
Open House
License Renewal
Earthquake
Chernobyl
Biofouling
Environmental Justice
Power Uprate
ML06019007231 January 2006NUREG-1437 S26 Dfc, Generic Environmental Impact Statement for License Renewal of Nuclear Plants, Supplement 26, Regarding Monticello Nuclear Generating Plant, Draft Report for CommentSafe Shutdown
High winds
Offsite Dose Calculation Manual
Internal Flooding
Zebra Mussel
Aging Management
Design basis earthquake
Annual Radiological Environmental Operating Report
Open House
License Renewal
Earthquake
Chernobyl
Biofouling
Environmental Justice
Power Uprate
ML05208037928 July 2005Letter from S. Hoffman (Mndnr) to Y. Abernethy (CNS) Request for Natural Heritage Information for Vicinity of Monticello Nuclear Generating Plant and Transmission Line Corridors
ML05201048528 July 2004Minnesota Department of Natural Resources Letter to Y. Abernethy (CNS) Regarding Request for Natural Heritage Information for the Vicinity of Monticello Nuclear Generating Plant and Transmission Line Corridors
ML20116G89526 July 1996Proposed Tech Specs Increasing Max Power Level by 6.3% to 1,775 from 1,670 Mwt.Summary of Plant Mods for Power Rerate Implementation & Power Rerate Environ Evaluation EnclUltimate heat sink
Hydrostatic
Abnormal operational transient
Scram Discharge Volume
MELLLA
Safeguards Contingency Plan
License Renewal
Control of Heavy Loads
Fuel cladding
Pressure Boundary Leakage
Unidentified leakage