NEXTera

.ENERGY SEA BROOK December 20. 2012 SBK-L-12268 Docket No. 50-443 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk One White Flint North 11555 Rockville Pike Rockville, MD 20852 Seabrook Station 10 CFR 50 Appendix E Evacuation Time Estimate Study Pursuant to Part 50.4 of Title 10 of the Code of Federal Regulations, NextEra Energy Seabrook, LLC (NextEra Energy Seabrook) hereby submits the evacuation time estimate study (ETE) for Seabrook Station. This study is submitted in accordance with the requirements of Appendix E IV 4 to Part 50 of Title 10 of the Code of Federal Regulations.

The regulation requires the licensee to submit an updated study within 365 days of the later of the.date of the availability of the most recent decennial census data from the U.S. Census Bureau or December 23, 2011.

The Seabrook Station ETE was developed in accordance with the federal guidance in NUREG/CR-7002 (SAND2010-0016P), "Criteria for Development of Evacuation Time Estimate Studies," published November 2011. contains a compact disc (CD) of the Seabrook Station ETE study. The CD is formatted in a manner consistent with, ."Guidance for Electronic Submissions to the NRC," Revision 6.1, dated May 27, 2011. (included in the CD) contains the completed NUREG/CR 7002 Appendix B, Table B-I ETE Review Criteria Checklist for the Seabrook Station ETE.

The enclosed ETE study provides the methods used to derive, for planning purposes, the time for public evacuation. The study provides an important part of the bases for development of protective action recommendations in coordination with the applicable offsite state/local emergency response agencies..

NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

This letter contains no new Regulatory Commitments and no revision to existing Regulatory Commitments.

Should you have any questions or if additional information is needed regarding this submittal, please contact me at (603) 773-7745.

Sincerely, NextEra Energy Seabrook, LLC Michael D. O'Ke~e-fo Licensing Manager

Enclosures:

I - 2012 Seabrook Station EPZ ETE Study (CD) 2 - Seabrook Station EPZ ETE, NUREG/CR 7002 Appendix B, Table B-1 ETE Review Criteria Checklist (included in CD) cc: w/o Enclosures W. M. Dean, NRC Region I Administrator J. G. Lamb, NRC Project Manager NRC Resident Inspector Mr. Christopher M. Pope, Director Homeland Security and Emergency Management New Hampshire Department of Safety Division of Homeland Security and Emergency Management Bureau of Emergency Management 33 Hazen Drive Concord, NH 03305 Mr. John Giarrusso, Jr., Nuclear Preparedness Manager The Commonwealth of Massachusetts Emergency Management Agency 400 Worcester Road Framingham, MA 0 1702-5399