-4' NEXTera T

ENERGYL.,

SB0

~.*1.~~

August 20,.2010._

---'Docket No. 5 0-443 SBK-L-10147 United States Nuclear Regulatory Commission Attn.: Document Control Desk Washington, D.C. 20555-0001 Seabrook Station Incorrect Reference in Submittal Letter

Reference:

SBK-L-10027, Inservice Inspection Examination Report, dated February 9, 2010 In the referenced report, ASME Code Case N-532-1 was incorrectly referenced in the submittal cover letter. The correct reference is ASME Code Case N-532-4. The information contained in the enclosure to SBK-L-10027 was not affected by the incorrect reference.

If you have any questions regarding this information, please contact me at (603) 773-7745.

Sincerely, NextEra Energy Seabrook, LLC Michael O'Keefe Licensing Manager NextEra Energy Seabrook, LLC, P.O. Box 300, Lafayette Road, Seabrook, NH 03874

United States Nuclear Regulatory Commission SBK-L-10147/Page 2 cc:

NRC Region I Administrator G. E. Miller, NRC Project Manager, Project Directorate I-2 W. Raymond, NRC Senior Resident Inspector Wayne Brigham, Boiler Inspector New Hampshire Department of Labor Inspection Division PO Box 2076 Concord, NH 03302-2076