SBK-L-05175, July 2005 Monthly Operating Report for Seabrook Station

From kanterella
Jump to navigation Jump to search
July 2005 Monthly Operating Report for Seabrook Station
ML052290277
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 08/09/2005
From: St.Pierre G
Florida Power & Light Energy Seabrook
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
SBK-L-05175
Download: ML052290277 (2)


Text

- - -

FPL Energy Seabrook Station FPL Energy P.O. Box 300 Seabrook, NH 03874 Seabrook Station (603) 773-7000 August 9, 2005 Docket No. 50-443 SBK-L-05175 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001 Seabrook Station July 2005 Monthly Operating Report Enclosed please find Monthly Operating Report 05-07. This report addresses the operating and shutdown experience relating to Seabrook Station Unit I for the month of July, 2005 and is submitted in accordance with the requirements of Seabrook Station Technical Specification 6.8.1.5.

Should you require further information regarding this matter, please contact Mr. Paul V. Gurney, Reactor Engineering Supervisor, at (603) 773-7776.

Very truly yours, FPL Energy Seabrook, LLC

~ene F. St. Pierre Site Vice President cc: S. J. Collins, NRC Region I Administrator V. Nerses, NRC Project Manager, Project Directorate 1-2 G.T. Dentel, NRC Senior Resident Inspector

-0? -

an FPL Group company

OPERATING DATA REPORT DOCKET NO. 50443 UNIT NAME Seabrook I DATE August 03, 205.4a COMPLETED BY Peter Nardone Ij-TELEPHONE (603) 773-7074 REPORTING PERIOD: July 2005

1. Design Electrical Rating 1,220.00
2. Maximum Dependable Capacity (MWe-Net) 1,218.00 This Month Yr-to-Date Cumulative
3. Number of Hours the Reactor was Cri'.ica, 744.00 4,340.88 115,954.68
4. Number of Hours Generator On-line 744.00 4,255.87 112,954.16
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Enermy Generated (Y.WHrs) 906.838.02 4.973,043.78 127,604,340.55 UNIT SHUTDOWNS Type Method of F: Forced Duration Shutting Cause & Corrective Action No. Date Reason 1 Down 2 S: Scheduled (Hours) Dw Comments

SUMMARY

The unit operated at 100% power for the entire month. This yielded an availability factor of 100% and a capacity factor of 100.07% based on the MDC value of 1218.0 Net MWe.

I 2 Reason: Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual TriplScram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Page 1 of 1