April 10, 2025 Enclosure B Page 1 of 2 Enclosure B Dresden Nuclear Power Station, Units 2 and 3, Subsequent License Renewal Application Updates Resulting from RAI responses
==
Introduction:==
This enclosure provides an SLRA update that resulted from the response to RAI 4.3.3-2.
For clarity, entire sentences or paragraphs from the SLRA are provided with the deleted text highlighted by strikethroughs and the inserted text highlighted by bolded italics. In addition, any revisions to the SLRA tables are shown by providing excerpts from the affected tables.
April 10, 2025 Enclosure B Page 2 of 2 As a result of the response to RAI 4.3.3-2 provided in Enclosure A of this letter, Line item 4 of SLRA Table 4.3.1-3, page 4.3-11, is revised as shown below:
Table 4.3.1-3 Dresden Unit 2 and 3 - Limiting Locations and 80-year Projected CUF and CUFen Values No.
Location Description 80-year CUFen (Unit 2 / Unit 3) 80-year CUF (Unit 2 / Unit 3)
Acceptance Criterion 4
Feedwater Nozzle AB Safe End (FW LPB SE) (Note 3) 0.098 / 0.090 (Note 2) 1.0