MONTHYEARRS-06-089, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power2006-08-16016 August 2006 Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power Project stage: Request RS-06-118, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power2006-08-24024 August 2006 Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power Project stage: Request RS-06-126, Additional Information Supporting License Amendment Request Associated with Direct Current Electrical Power2006-09-13013 September 2006 Additional Information Supporting License Amendment Request Associated with Direct Current Electrical Power Project stage: Request RS-06-149, Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power2006-10-12012 October 2006 Additional Information Supporting the License Amendment Request Associated with Direct Current Electrical Power Project stage: Request ML0635600272006-12-19019 December 2006 Technical Specifications, Issuance of Amendments Technical Specification Task Force Standard Technical Specification Change Traveler 360, Revision 1, DC Electric Rewrite Project stage: Approval ML0632002052006-12-19019 December 2006 Issuance of Amendments Technical Specification Task Force Standard Technical Specification Change Traveler 360, Revision 1, DC Eclectic Rewrite (TAC Nos. MD5771 & MD5772) Project stage: Approval ML0716603172007-06-22022 June 2007 Completion of Acceptance Review of Emergency Plan Request to Adopt Nuclear Energy Institute (NEI) 99-01, Revision 4, and Upgrade Emergency Action Levels Project stage: Acceptance Review ML0822003672008-10-0303 October 2008 Evaluation of Proposed Emergency Action Levels Project stage: Other 2006-08-24
[Table View] |
|
---|
Category:Letter type:RS
MONTHYEARRS-23-120, Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information2023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information RS-23-103, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-10-13013 October 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation RS-23-097, Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans2023-10-12012 October 2023 Constellation Energy Generation, LLC, Advisement of Leadership Changes and Submittal of Updated Standard Practice Procedures Plans RS-23-080, Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs2023-08-30030 August 2023 Constellation Energy Generation, LLC, Application to Revise Technical Specifications to Adopt TSTF-264-A, Revision 0, 3.3.9 and 3.3.10 - Delete Flux Monitors Specific Overlap Requirement SRs RS-23-087, Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor2023-08-0404 August 2023 Revision to Approved Alternatives Associated with the Use of the BWRVIP Guidelines in Lieu of Specific ASME Code Requirements on Reactor RS-23-084, Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-07-24024 July 2023 Response to Request for Additional Information Regarding the Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-077, Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations2023-06-16016 June 2023 Response to NRC Regulatory Issue Summary 2023-01, Preparation and Scheduling of Operator Licensing Examinations RS-23-042, Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2023-05-25025 May 2023 Application to Revise Technical Specifications to Adopt TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling RS-23-049, Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-23023 March 2023 Constellation Energy Generation, LLC, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations RS-23-048, Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements2023-03-0707 March 2023 Exigent Amendment Request to Revise Design Basis Related to Seismic Requirements RS-23-045, Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.2032023-02-28028 February 2023 Constellation Energy Generation, LLC Submittal of Fitness for Duty Performance Data Reports for 2022 Per 10 CFR 26.717(c) & 10 CFR 26.203 RS-23-037, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2023-02-22022 February 2023 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-23-003, Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-102023-01-31031 January 2023 Constellation Energy Generation, LLC, Summary of Changes to Quality Assurance Topical Report, NO-AA-10, and Decommissioning Quality Assurance Program, NO-DC-10 RS-22-085, Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis2023-01-12012 January 2023 Application to Revise Design Basis to Allow Use of Plastic Section Properties in Lower Downcomer Braces Analysis RS-23-006, Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report2023-01-10010 January 2023 Supplemental Information Regarding License Amendment Request Relocation of Pressure and Temperature Limit Curves to the Pressure and Temperature Limits Report RS-22-126, Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2022-11-30030 November 2022 Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI RS-22-109, Response to Request for Additional Information License Amendments Related to Fuel Storage2022-10-12012 October 2022 Response to Request for Additional Information License Amendments Related to Fuel Storage RS-22-092, Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration2022-10-0303 October 2022 Nine and Quad Cities - Application to Revise Primary Containment Isolation Instrumentation Technical Specifications in Accordance with TSTF-306, Revision 2, Add Action to LCO 3.3.6.1 to Give Option to Isolate the Penetration RS-22-093, Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans2022-08-18018 August 2022 Advisement of Leadership Changes for Constellation Energy Generation, LLC and Submittal of Updated Standard Practice Procedures Plans RS-22-083, Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical2022-06-17017 June 2022 Response to Request for Additional Information Related to the License Amendment Request to Change New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical RS-22-051, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-04-12012 April 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-049, Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for2022-04-0404 April 2022 Constellation Energy Generation, LLC, Supplemental Information to Correct Typographical Errors in Constellation'S Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for V RS-22-045, Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations2022-03-25025 March 2022 Constellation Energy Generation, LLC, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations RS-22-035, Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0404 March 2022 Supplemental Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-033, Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0303 March 2022 Response to Request for Additional Information Regarding Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-032, Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs2022-03-0202 March 2022 Relief Request I4R-13 Relief from Code Examinations for 1B33-F060A and 1B33-F060B Repairs RS-22-023, Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement2022-02-23023 February 2022 Constellation Energy Generation, LLC, Executed Trust Fund Agreement Amendment and Subordinate Trust Agreement RS-22-027, Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated2022-02-23023 February 2022 Constellation, Response to Request for Additional Information Regarding Application to Revise Technical Specifications to Adopt TSTF-541 Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated P RS-22-018, Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station2022-02-22022 February 2022 Annual 10 CFR 50.46 Report of Emergency Core Cooling System Evaluation Model Changes and Errors for LaSalle County Station RS-22-019, Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists2022-02-16016 February 2022 Constellation Energy Generation, LLC - Update to Correspondence Addressees and Service Lists RS-22-015, Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC2022-02-0101 February 2022 Notification of Completion of License Transfer and Request to Continue Processing Pending NRC Actions Previously Requested by Exelon Generation Company, LLC RS-22-004, Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2022-01-0404 January 2022 Supplement to Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-121, Proposed Changes to Decommissioning Trust Agreements and Master Terms2021-12-15015 December 2021 Proposed Changes to Decommissioning Trust Agreements and Master Terms RS-21-115, Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.52021-11-0404 November 2021 Supplemental Information for License Amendment Request Regarding New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies, with Proposed Changes to Technical Specifications 4.3.1 and 5.6.5 RS-21-109, Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 20212021-10-14014 October 2021 Request to Withhold Meeting Materials for the Non-Public Meeting Held on September 2, 2021 RS-21-091, Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes2021-09-13013 September 2021 Implementation of Insider Threat Program Requirements Associated with the Voluntary Security Clearance Program and Advisement of Leadership Changes RS-21-078, Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel2021-08-19019 August 2021 Response to Request for Additional Information for Application to Revise Technical Specification to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, and TSTF-583-T, TSTF-582 Diesel RS-21-085, Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016)2021-08-17017 August 2021 Response to Request for Additional Information Regarding License Amendment Request to Incorporate Licensing Topical Report NEDE-33885PA, Revision 1, GNF CRDA Application Methodology (EPID-L-2021-LLA-0016) RS-21-063, Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements2021-06-30030 June 2021 Application to Adopt TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements RS-21-064, License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter2021-06-30030 June 2021 License Amendment Request Re New Fuel Storage Vault and Spent Fuel Storage Pool Criticality Methodologies - Cover Letter RS-21-070, Proposed Alternative to Utilize Code Case N-8932021-06-30030 June 2021 Proposed Alternative to Utilize Code Case N-893 RS-21-055, Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended.2021-05-10010 May 2021 Response to Third Round Request for Additional Information (Rals) for LaSalle License Amendment Request to Adopt Risk Informed Completion Times TSTF- 505, Revision 2, Provide Risk-Informed Extended. RS-21-054, Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations2021-04-29029 April 2021 Response to NRC Regulatory Issue Summary 2021-01, Preparation and Scheduling of Operator Licensing Examinations RS-21-050, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-16016 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-045, Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165)2021-04-0707 April 2021 Response to Request for Additional Information (RAI) Regarding Request for License Amendment Regarding Ultimate Heat Sink (EPID-L-2020-LLA-0165) RS-21-040, Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b2021-03-31031 March 2021 Response to Second Round Request for Additional Information (Rais) for License Amendment Request to Adopt Risk Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b RS-21-043, Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Supplemental Information Regarding Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-042, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 22021-03-26026 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs, Revision 2 RS-21-039, Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments2021-03-25025 March 2021 Supplemental Information Regarding Application for Order Approving Transfers and Proposed Conforming License Amendments RS-21-035, Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs2021-03-0909 March 2021 Relief Request I4R-12 Relief from Code Examinations for 2B33-F060A and 2B33-F060B Repairs 2023-08-04
[Table view] |
Text
RS-06-149 10 CFR 50.90 October 12, 2006 U . S. Nuclear Regulatory Commission ATTN : Document Control Desk Washington, D. C. 20555 LaSalle County Station, Units 1 and 2 Facility Operating License Nos. NPF-1 1 and NPF-1 8 NRC Docket Nos . 50-373 and 50-374
Subject:
Additional Information With Supporting the License Amendment Request Associated Direct Current Electrical Power References : 1 . Letter from K. R. Jury (Exelon Generation Company, LLC) to U.S . NRC, "Request for an Amendment to Technical Specifications Associated With Direct Current Electrical Power," dated December 9, 2004 U .S . NRC to C . M . Crane (Exelon Generation Company, LLC), "LaSalle County Power Station, Units 1 and 2 -- Request for Additional Information Related to Request for Amendment to Technical Specifications Associated With Direct Current Electrical Power," dated June 2, 2006
- 3. Letter from D. M. Benyak (Exelon Generation Company, LLC) to U.S . NRC, "Additional Information With Supporting the License Amendment Request Associated Direct Current Electrical Power," dated August 16, 2006
- 4. Letter from D . M. Benyak (Exelon Generation Company, LLC) to U .S . NRC, "Additional Information Supporting the License Amendment Request Associated With Direct Current Electrical Power," dated August 24, 2006
- 5. Summary of July 12, 2006, NRC Public Meeting, "Meeting with the Technical Specifications Task Force (TSTF) to discuss TSTF-360, Revision 1, `DC Electrical Rewrite'," dated August 15, 2006 Letter from D. M . Benyak (Exelon Generation Company, LLC) to U .S . NRC, "Additional Information Supporting the License Amendment Request Associated With Direct Current Electrical Power," dated September 13, 2006
October 1 2, 2006 U . S. Nuclear Regulatory Commission Page 2 In Reference 1, Exelon Generation Company, LLC, (EGC), requested an amendment to Appendix A, Technical Specifications (TS), of Facility Operating License Nos. NPF-1 1 and NPF-18 for LaSalle County Station (LSCS) Units 1 and 2 respectively . Specifically, the proposed changes were to modify TS Sections 3 .8.4, "DC Sources - Operating," 3.8.5, "DC Sources - Shutdown," 3.8.6, "Battery Cell Parameters," and 5 .5, "Programs and Manuals." The proposed changes also requested new actions for an inoperable battery charger and alternate battery charger testing criteria for Limiting Condition for Operation (LCO) 3.8.4 and 3 .8 .5.
The proposed changes also included the relocation of a number of Surveillance Requirements (SRs) in TS Section 3.8.4 that perform preventive maintenance on the safety related batteries to a licensee-controlled program. It was proposed that TS Table 3 .8.6-1, "Battery Cell Parameter Requirements," be relocated to a licensee-controlled program, and specific actions with associated completion times for out-of-limits; conditions for battery cell voltage, electrolyte level, and electrolyte temperature be added to TS Section 3 .8.6. In addition, specific SRs were proposed for verification of these parameters.
A new program was also proposed for the maintenance and monitoring of station batteries based on the recommendations of Institute of Electrical and Electronics Engineers (IEEE)
Standard 450-1995, "IEEE Recommended Practice for Maintenance, Testing, and Replacement of Vented Lead-Acid Batteries for Stationary Applications ." The items relocated would be contained within this new program.
In Reference 2, the NRC requested additional information to complete the review of the license amendment. References 3 and 4 provided the requested information.
In a teleconference on August 24, 2006 additional information was requested by the NRC to complete the review of the proposed license amendment taking into consideration the NRC concerns with TSTF-360 that were discussed at a public meeting on July 12, 2006 (i.e.,
Reference 5). Reference 6 provided this additional information .
Following further discussions with the NRC, additional information was requested to clarify information provided in Reference 6. Attachment 1 provides an additional letter from GNB/NLI, (i .e., the battery manufacturer for the Division 1 250 VDC, Division 1 125 VDC and Division 2 125 VDC) which clarifies assurance of float current voltage. Attachment 2 provides a revision to TS 5 .5.14 that revises TS 5 .5 .14 .c to "verify that the remaining cells are ? 2.07 V when a cell or cells have been found to be < 2.13V."
significant EGC has reviewed the information supporting a finding of no hazards consideration that was previously provided to the NRC in Attachment 1 of Reference 1 . The supplemental information provided in this submittal does not affect the bases for concluding that the proposed license amendment does not involve a significant hazards consideration .
There are no regulatory commitments contained in this letter . Should you have any questions concerning this letter, please contact Ms. Alison Mackellar at (630) 657-2817 .
October 1 2, 2006 U . S. Nuclear Regulatory Commission Page 3 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 12th day of October 2006.
Respectfully, Darin M . Benyak I Manager, Licensing and Regulatory Affairs : Letter from GNB/NLI : Revised Technical Specification Page
ATTACHMENT 1 LaSalle County Station Facility Operating License Nos. NPF-1 1 and NPF-1 8 Letter from GNB/NLI for the Division 1 250 VDC, Division 1 125 VDC and Division 2 125 VDC
NUCLEAR LOGISTICS INC Date : October 11, 2006 To: Mr. Kent Nelson
Subject:
Float Current Mr. Nelson, This letter is to address the question presented by LaSalle Station via e-mail on October 9", 2006.
"The 09/08/2006 letter from GNB to NLI titled "Float Current Monitoring" included the following bullets:
" The concept of utilizing float current levels of a flooded, stationary string battery to determine a state of charge throughout the life of the battery is reasonable .
" The charge current of each battery can be affected by impurity levels, age, operating environment and maintenance history.
The NRC has asked LaSalle to provide clarification regarding these statements . Specifically, the NRC questioned if the statement that "the concept of utilizing float current . . . to determine a state of charge throughout the life of the battery is reasonable," conflicts with the statement that "the charge current of each battery can be affected by . . . age." Stated more succinctly, as a battery ages (no other factors present) will the float current of the battery at full charge change notably (i.e., so as to affect the current level used to determine state of charge)?"
Float current is expected to change over the life of a battery cell and/or string due to plate deterioration, grid corrosion, reduced capacity and contaminates. Neither GNB nor NLI has test data which documents the expected float current increase over the life of a naturally aged battery cell and/or string. However, GNB did document the float current during accelerated age testing performed on NCX battery cells. The cells were aged for an equivalent time period of 15 years at 60°C. Test data showed an increase in float current of =16% over the simulated 15 year period . ..
Based on the Tafel Curve (TC-107887) an NCN-27 (1944 Amp-Hour Rating) cell would have an initial float current of approximately 0.097 amps when on a float charge of 2.20 Volts Per Cell (VPC). An expected 16%
increase (based on accelerated age testing) would result in a float current of approximately 0.113 amps.
Don Davis Nuclear Logistics Inc.
Battery Project Engineer Attachments (3) 1 . E-mail from Kent Nelson, dated October 9a', 2006
- 2. GNB letter labeled "Float Current Monitoring", dated September 8"', 2006 3 . Tafel Lines of Gould Calcium Stationary Cells, Document No. TC-107887 7450 Whitehall Street " Fort Worth, Texas 76118 " 817.284.0077 " Fax 817.590.0484 " 800.448.4124 " generalinfo nuclearlogisdcs .com www.nuclearlogistics.com
Message Page I of 1 Don Davis From : kent.nelson@exeloncorp .com Sent: Monday, October 09, 2006 11 :50 AM To: ddavis@nuclearlogistics .com Cc: abell@nuclearlogistics .com; mark .murskyj@exeloncorp .co m; Alison .MacKellar@exeloncorp .co m Subject : Request for Clarification
- Don, The 09/08/2006 letter from GNB to NU titled "Float Current Monitoring" includes the following bullets :
o The concept of utilizing float current levels of a flooded, stationary string battery to determine a state of charge throughout the life of the battery is reasonable .
o The charge current of each battery can be affected by impurity levels, age, operating environment and maintenance history.
The NRC has asked LaSalle to provide clarification regarding these statements. Specifically, the NRC questioned I We statement that "the concept of utilizing float current . . . to determine a state of charge throughout the life of the battery is reasonable," conflicts with the statement that "the charge current of each battery can be affected by . . . age! Stated more succinctly, as a battery ages (no other factors present) will the float current of the battery at full charge change notably (i.e., so as to affect the current level used to determine state of charge)?
A response to the NRC questions on this issue would be most appreciated .
Sincerely, Kent C. Nelson LaSalle System Engineering "15) 4113879 This e-mail and any of its attachments may contain Exelon Corporation proprietary information, which is privileged, confidential, or subject to copyright belonging to the Exelon Corporation family of Companies .
This e-mail is intended solely for the use of the individual or entity to which it is addressed. If you are not the intended recipient of this e-mail, you are hereby notified that any dissemination, distribution, copying, or action taken in relation to the contents of and attachments to this e-mail is strictly prohibited and may be unlawful . If you have received this e-mail in error, please notify the sender immediately and permanently delete the original and any copy of this e-mail and any printout.
Thank You.
10/11/2006
INDUSTRIAL POWFR A MY of 1WHAII 551W01049"as 8 September 2006 GNB Industrial Power 3950 Sussex Avenue Aurora, IL 60504-7932 Float Current Monitoring USA 630.862 .2200 tel From: Robert J. Schmitt 800.872 .0471 NO tee Staff Engineer 6318622325 fax www.gnb.com GNB Network Power To: Mr. Don Davis owl GNB's position on the use of float current measurements by Exelon's LaSalle Station to determine the state of charge of flooded stationary lead-calcium batteries is as follows :
0 The concept of utilizing float current levels of a flooded, stationary string battery to determine a state of charge throughout the life of the battery is reasonable .
There is a relationship between percentage of ampere-hours returned following a successful discharge capacity test and battery state of charge.
Proper follow-up and verification of satisfactory float charge voltage, current and specific gravities is necessary to deetrerroine whether the battery is operating properly per GNB's Installation and Operating Manual, section 93.10.
The charge current of each battery and can be affected by impurity levels, age, operating environment and maintenance history .
I hope this addresses your concerns on this matter and that you will contact me with any further questions .
Best regards, Rj S
MIL LIAMPERES PER I HOUR CAPACITY c+ 00 0 .
O r
D tV 0
z r
t 0
N D
!O Gm O
'O m
z COULD CALCIUM ry STATIONARY CELLS c GOUL D _INC .
TRENTON, N,J TEST NO. T6717 nr m
TC - 107887
ATTACHMENT 2 LaSalle County Station Facility Operating License Nos. NPF-1 1 and NPF-1 8 Revised Technical Specification Page 5.5-13
Programs and Manuals 5 .5 5 .5 Programs and Manuals 5 .5 .13 Primary Containment Leaka ge_Rate Test ing Program (continued)
NEI 94 1995, Section 9 .2 .3 : The first Unit 2 Type A test performed after December 8, 1993 Type A test shall be performed no later than December 7, 2008 .
The peak calculated primary containment internal pressure for the design basis loss of coolant accident, n, is 39 .9 pSig .
C. The maximum allowable primary containment leakage rate, L, at P, is 0 .635% of primary containment air weight per day .
Leakage rate acceptance criteria are :
1 . Primary containment overall leakage rate acceptance criterion is n 1 .0 Q . During the first unit startup following testing in accordance with this program, the leakage rate acceptance criteria are n 0 .60 Q for the combined Type B and Type C tests, and <_ 0 .75 L, for Type A tests .
- 2. Air lock testing acceptance criteria are :
a Overall air lock leakage rate is i 0 .05 L, when tested at n P, .
b) For each door, the seal leakage rate is n 5 scf per hour when the gap between the door seals is pressurized to ! 10 psig .
- e. The provisions of SR 3 .0 .3 are applicable to the Primary Containment Leakage Rate Testing Program .
5 .5 .14 Battery Monitoring and Maintenance Program This Program provides for restoration and maintenance, which includes the following :
a . Actions to restore battery cells with float voltage < 2 .13 V ;
and Actions to equalize and test battery cells that had been discovered with electrolyte level below the top of the plates ;
and C . Actions to verify that the remaining cells are ~! 2 .07 V when a cell or cells have been found to be < 2 .13 V .
LaSalle 1 and 2 5 .5-13 Amendment No . /