RCF 11-01, Letter from Rensselaer Resignation of Timothy H. Trumbull as RPI Reactor Critical Facility Director

From kanterella
Jump to navigation Jump to search
Letter from Rensselaer Resignation of Timothy H. Trumbull as RPI Reactor Critical Facility Director
ML110190315
Person / Time
Site: Rensselaer Polytechnic Institute
Issue date: 01/10/2011
From: Trumbull T
Rensselaer Polytechnic Institute
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RCF 11-01
Download: ML110190315 (1)


Text

DEPARTMENT OF MECHANICAL, Renselaer AEROSPACE, AND NUCLEAR ENGINEERING RCF 11-01 January 10, 2011 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Re: Resignation of Timothy H. Trumbull as RPI Reactor Critical Facility Director.

Dear Sir:

This letter notifies you that Ihave resigned my position as Director of the RPI Reactor Critical Facility effective January 7, 2011. In accordance with our Technical Specifications, the Dean of Engineering.has appointed Dr. Sastry Sreepada to assume the duties of Director.

I will continue to be associated with the facility as the instructor for the Critical Reactor course and maintain my Senior Reactor Operator license.

Sincerely x,' .

Dr. TimothýH! Trumbull, Difect"r-. ....

L. David Walthousen Laboratory RPI Reactor Critical Facility Cc:

Dr. David V. Rosowsky, Dean of Engineering Dr. Yaron Danon, Chairman Dr. Tim Wei, Chairman RPI NSRB Dept. of Mechanical, Aerospace, and Nuclear Engineering Dr. Peter Caracappa Mr. Jason Thompson, Operations Supervisor RPI Radiation Safety Officer RPI RCF Rensselaer Polytechnic Institute 110 8th Street ITroy, NY 12180-3590 1Jonsson Engineering Center Phone (518) 276-6351 I Fax (518) 276-6025 I www.rpi.edu/dept/meaem Ac~

tu(z4Z~~