MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
Thomas D. Gatlin Vice President,Nuclear Operations 803.345.4342 January 6, 2014 A SCANA COMPANY RC-1 3-0189 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 ATTN: Shawn Williams
Subject:
VIRGIL C. SUMMER NUCLEAR STATION UNIT 1 (VCSNS)
DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REQUEST RELIEF FROM ASME CODE REQUIREMENTS IN VCSNS 4TH TEN YEAR INSERVICE INSPECTION INTERVAL RR-4-04 (P) IST Class 2 and 3 Pump Testing Requirements Using OMN-18
Reference:
Letter from T. D. Gatlin (VCSNS) to Document Control Desk (NRC),
"Request Relief from ASME Code Requirements in VCSNS 4th Ten Year Inservice Inspection Interval," dated May 16, 2013 (RC-13-0069)
[ML13140A008]
Dear Sir or Madam:
Pursuant to 10 CFR 50.55a, "Codes and Standards," paragraphs (a)(3)(i) and (a)(3)(ii),
South Carolina Electric & Gas Company, acting for itself and as an agent for South Carolina Public Service Authority, hereby requests NRC approval of the attached relief request associated with the fourth inservice testing (IST) interval. The fourth interval of the VCSNS, Unit 1, IST Program will comply with the American Society of Mechanical Engineers (ASME) Code for Operation and Maintenance of Nuclear Power Plants (i.e.,
OM Code), 2004 Edition with addenda through 2006, which is the latest edition and addenda of the ASME OM Code incorporated by reference in 10 CFR 50.55a(b)(3).
The bases for the relief request are provided within the Attachment.
VCSNS Unit 1 submitted RR-4-02 (P) as referenced, but neglected to include all applicable pumps. RR-4-02 (P) and RR-4-04 (P) will cover all IST Class 2 and 3 pumps using testing requirements from OMN-18.
Virgil C.Summer Station
- Jenkinsville, SC - 29065 . F (803) 941-9776
Document Control Desk CR- 13-04777 RC-13-0189 Page 2 of 2 No new commitments are being made to the NRC by this letter. If you should have any questions, please contact Mr. Bruce L. Thompson at (803) 931-5042.
Very truly yours, Thomas D. Gatlin WLT/TDG/ts
Attachment:
RR-4-04 (P) IST Class 2 and 3 Pump Testing Requirements Using OMN-18 c: K. B. Marsh S. A. Byrne J. B. Archie N. S. Carns J. H. Hamilton J. W. Williams W. M. Cherry V. M. McCree S. A. Williams NRC Resident Inspector K. M. Sutton NSRC RTS (CR-13-04777)
File (810.19-2)
PRSF (RC-13-0189)
Document Control Desk CR-13-04777 RC-13-0189 Page 1 of 4 SOUTH CAROLINA ELECTRIC & GAS CO. (SCE&G)
VIRGIL C. SUMMER NUCLEAR STATION UNIT I (VCSNS)
RR-4-04 (P) IST Class 2 and 3 Pump Testing Requirements Using OMN-18
- 1. ASME Code Component(s) Affected XPP0048C, HVAC Chilled Water Pump, (Centrifugal / Group A / Class 3).
Previously reviewed under ML13140A008:
XPPO01 3A & B, Boric Acid Transfer Pumps (Centrifugal / Group A / Class 3).
XPP0038A & B, Reactor Building Spray Pumps, (Centrifugal / Group AB / Class 2).
XPP0039A, B & C, Service Water Pumps, (Vertical Line Shaft / Group A / Class 3).
XPP0045A & B, Service Water Booster Pumps, (Centrifugal / Group AB / Class 3).
XPP0048A & B, HVAC Chilled Water Pumps, (Centrifugal / Group A / Class 3).
Component/System Function Provide minimum flow to meet system requirements under accident conditions
- 2. Applicable Code Edition and Addenda ASME OM Code-2004 Edition, with Addenda through OMb-2006.
- 3. Applicable Code Requirement(s)
ISTB-3300 "Reference Values," states, in part, that "Reference values shall be established within +/- 20 percent of pump design flow rate for the comprehensive test," and "Reference values shall be established within +/- 20 percent of pump design flow for the Group A and Group B tests, if practicable."
ISTB-3400 "Frequency of Inservice Tests", states that an inservice test shall be run on each pump as specified in Table ISTB-3400-1.
Table ISTB-3400-1 Requires Group A and Group B tests to be performed quarterly and a comprehensive test to be performed biennially.
Table ISTB-351 0-1 "Required Instrument Accuracy," specifies the instrument accuracies for Group A, Group B, comprehensive, and preservice tests.
Table IST B-51 21- 1 "CentrifugalI Pum p Test Acceptance Criteri a" defines the requ ired acceptance criteria for Group A, Group B, and Comprehensive Tests for centrifugal pumps.
Document Control Desk CR-1 3-04777 RC-1 3-0189 Page 2 of 4 Table ISTB-5221-1 "Vertical Line Shaft Centrifugal Pumps Test Acceptance Criteria" defines the required acceptance criteria for Group A, Group B, and Comprehensive Tests for Vertical Line Shaft centrifugal pumps.
- 4. Reason for Request The ASME Code committees have approved Code Case OMN-18, Alternate Testing Requirements for Pumps Tested Quarterly within +/- 20 percent of Design Flow. This Code Case has not been approved for use in Regulatory Guide 1.192, "Operation and Maintenance Code Case Acceptability, ASME OM Code," June 2003.
This Code Case allows the Owner to not perform the Comprehensive Pump Test (CPT) with the associated acceptance criteria, if the quarterly test is performed at +/- 20 percent of design flow and the instrumentation meets the accuracy requirements of Table ISTB-351 0-1 for the comprehensive and preservice tests. The basis for the testing strategy in this Code Case is that a quarterly Group A pump test, performed at the CPT flow rate with more accurate instrumentation, is more effective in assessing a pump's operational readiness than a standard Group A test in conjunction with a biennial CPT.
Additionally, ISTB allows the Owner to categorize the pumps in their program. As such, an Owner could categorize a pump that otherwise meets the requirements of Group B, as a Group A (or AB) pump, and test according to the provisions of Code Case OMN-18. In doing this, the owner is obtaining additional data (vibration and flow or differential pressure) quarterly, rather than once every two years.
As a result of the increased requirements on the parameters imposed by the proposed alternative during applicable quarterly tests, there is no added value in performing the biennial comprehensive test on the subject pumps.
Document Control Desk CR-1 3-04777 RC-1 3-0189 Page 3 of 4
- 5. Proposed Alternative and Basis for Use VCSNS is proposing to utilize the provisions of Code Case OMN-18 and perform a modified Group A test in lieu of performing the Code-required CPT. The modified Group A test will be run at +/- 20 percent of the pump's design flow rate using
+/- 0.5 percent accurate digital gauges or better to determine the pump differential pressure. Vibration tests will be performed with the same vibration acceptance criteria as the standard Group A pump test. Additionally, VCSNS will utilize an Acceptable Range High limit of 106 percent or lower for quarterly testing, which is also consistent with the planned Code change applicable to CPT.
The use of more accurate pressure gauges and a more limiting Acceptable Range during every modified quarterly Group A test compensates for the elimination of the CPT. The CPT has a more limiting Acceptable Range upper bound for differential pressure of 103 percent. Regular testing with more accurate instrumentation and tighter acceptance criteria will provide for better trending of pump performance. Instead of performing seven tests with pressure instruments with +/- 2 percent accuracy and then performing the eighth test with pressure instruments with a minimum of +/- 0.5 percent accuracy, all eight tests will be performed with the same +/- 0.5 percent accurate digital instruments or better. Due to the improved accuracy, consistent testing methodology, and the addition of quarterly vibration monitoring on Group AB pumps, deviations in actual pump performance indicative of impending degradation are more easily recognized during quarterly performance trending activities.
The provisions of this request as an alternative to the requirements of ISTB-3400 and Tables ISTB-3400-1, ISTB-5121-1, & ISTB-5221-1 provides a reasonable alternative to the Code requirements based on the determination that the proposed alternative will provide adequate indication of pump performance, permit detection of component degradation, and continue to provide an acceptable level of quality and safety.
Therefore, pursuant to 10CFR50.55a(a)(3)(i), VCSNS requests approval of this alternative to the specific ISTB requirements identified in this request.
- 6. Duration of Proposed Alternative The proposed alternative identified will be utilized during the fourth IST interval which is scheduled to begin January 1, 2014 and conclude on December 31, 2023.
- 7. Precedents The following relief requests were approved by the NRC in the recent past:
- 1. Relief Request (PR-01) was approved for the Oyster Creek Nuclear Generating Station as discussed in the U.S. Nuclear Regulatory Commission Safety Evaluation Report dated June 21, 2012 (TAC NO. ME7616).
- 2. Relief Request (PR-9) was approved for the St. Lucie, Units 1 and 2 as discussed in the U.S. Nuclear Regulatory Commission Safety Evaluation Report dated July 1,2011 (TAC NOS. ME5190 and ME5191).
Document Control Desk CR-13-04777 RC-13-0189 Page 4 of 4
- 3. Relief Request (PR-3) was approved for the Perry Nuclear Power Plant, Unit 1, as discussed in the U.S. Nuclear Regulatory Commission Safety Evaluation Report dated October 8, 2009 (TAC NO. ME0820).
- 4. Reference letter from T. D. Gatlin (VCSNS) to Document Control Desk (NRC),
"Request Relief from ASME Code Requirements in VCSNS 4th Ten Year Inservice Inspection Interval," dated May 16, 2013 (RC-13-0069)
[ML13140A008].
- 5. Relief Request RR-4-02 (P) was approved for the Virgil C. Summer Nuclear Station Unit 1, as discussed in the U.S. Nuclear Regulatory Commission Safety Evaluation Report dated November 5, 2013 (TAC NO. MF1901).