RC-13-0073, Updated Final Safety Analysis Report

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report
ML13179A201
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/06/2013
From: Gatlin T
South Carolina Electric & Gas Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML131790236 List:
References
RC-13-0073
Download: ML13179A201 (12)


Text

Attachment 3 (CD-ROM) Contains Sensitive Non-Publicly Available Information, Withhold in Accordance With 10 CFR 2.390 Thomas D. Gatlin Vice President, NuclearOperations 4r 803.345.4342 A SCANA COMPANY June 6, 2013 RC-1 3-0073 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 FINAL SAFETY ANALYSIS REPORT (FSAR) /

FIRE PROTECTION EVALUATION REPORT (FPER)

UPDATED THROUGH MAY 31, 2013 In accordance with 10CFR50.71(e), South Carolina Electric & Gas Company (SCE&G),

acting for itself and as agent for South Carolina Public Service Authority, submits one (1) CD-ROM electronic copy of the Updated Final Safety Analysis Report (UFSAR) and the Updated Fire Protection Evaluation Report (UFPER) for the Virgil C. Summer Nuclear Station (VCSNS) updated through May 31, 2013. The V. C. Summer Updated FSAR CD-ROM is a complete copy in Adobe PDF format generated from the original native master files and scanned hard copy documents.

This FSAR/FPER Update includes:

  • Changes to the FSAR and FPER that were made under the provisions of 10CFR50.59, but not previously submitted to the Commission.

" All affected chapter Table of Contents, List of Tables, List of Figures, and List of Effective Pages updated to reflect the current information contained in the FSAR and/or FPER.

Changes to the FSAR and FPER that were made to correct formatting/transcription errors are annotated via the footnote information. Technical changes are annotated by a vertical revision bar and the Revision Notice number. Unaffected vertical revision bars and the amendment number changes from prior updates remain unchanged.

Attachment 3 (CD-ROM) Contains Sensitive Non-Publicly Available Information, Withhold in Accordance With 10 CFR 2.390 Virgil C.Summer Station. Post Office Box 88. Jenkinsville, SC. 29065. F(803) 345-5209

Document Control Desk LTD 325 RC-13-0073 Page 2 of 2 The CD-ROM contains information that has been deemed sensitive to VCSNS physical protection. Therefore, SCE&G requests that the files on the CD-ROM be withheld from public disclosure in accordance with 10 CFR 2.390.

If there are any questions, please contact Donna Railey at (803) 345-4107.

I declare under penalty of perjury that the foregoing is true and correct.

Executed On Thomas D. Gatlin DWR/TDG/sr Attachments:

1) FSAR/FPER Revision Notices Incorporated Since November 2011 Update
2) Information Removed from the FSAR/FPER Since November 2011 Update
3) VCSNS FSAR/FPER CD-ROM (Sensitive Non-Publicly Available Information, Withhold in Accordance With 10 CFR 2.390) c: (Without CD unless noted below)

K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton J. W. Williams W. M. Cherry V. M. McCree (w/CD, 2.390)

E. A. Brown (w/CD, 2.390)

NRC Resident Inspector K. M. Sutton (w/CD, 2.390)

NSRC RTS (LTD 3:25, RR 6500)

File (813.11ý PRSF (RC-13 -0073 w/CD, 2.390)

Document Control Desk LTD 325 RC-1 3-0073 Page 1 of 12 FSAR/FPER REVISION NOTICES INCORPORATED SINCE NOVEMBER 2011 UPDATE RN No. Approval q Sections Brief Description Date 03-037 2012-06 FSAR Figure 9.5-1, SH 2 ECR-50510C - This change converted the cafeteria on the first floor of the Auxiliary Service Building to a central planning area for outage activities. The ECR added Sprinkler System Strainer Flushing Valve XVG34037-FS to drawing D-302-231, Sheet 2. The sprinkler system was also changed from manual to an automatically operated system upon detection of fire.05-015 2012-07 FPER Section 2.2.2.3 ETBT-70690, ETBT-71259 - Removed the FPER Section 2.2.2.4 words "magnesium oxychloride" from three FPER Section 4.4 sections of the FPER. The plant's original structural steel fire coating Albi Duraspray is no longer manufactured or available.

Replacement products Albi Clad Thin Film and Pyrocrete 241 do not contain magnesium oxychloride.06-008 2012-07 FSAR Figure 10.4-14 ECR-70756 - Revised drawing to clarify piping configuration represented as Detail "A" and Detail "B". A Corrective Action identified that valves contained in Detail "A" of this drawing could be missed when preparing a tagout boundary due to the method chosen to show these valves on the drawing. The same problem existed for valves shown in Detail "B".06-024 2012-12 FSAR Figure 10.4-1 ECR-50065 - ECR changed the design data FSAR Figure 10.4-8 upset pressure for various design flag FSAR Figure 10.4-9 sections of the process piping. Drawings were revised to reflect the boundaries and design conditions.06-043 2012-07 FSAR Figure 10.4-8 ECR-70967 - Add component IDs for 3" condensate pump vent valves to Detail A of Drawing D-302-1 01. This was done to be consistent with the level of details provided in the drawing for other valves associated with the condensate pumps.

Document Control Desk LTD 325 RC-1 3-0073 Page 2 of 9 RN No. Approval Sections Brief Description Date 07-006 2013-02 FSAR Figure 8G-6 ECR-50625 - Rod Control System Blocking FSAR Figure 8G-7 Diode Replacement/Removal.

FSAR Figure 8G-8 Westinghouse identified the Rod Control system blocking diodes as a single failure component. Additionally, Westinghouse identified the blocking diode fuses and all TI-600 trigger indicating fuses as a reliability issue. The blocking diodes were replaced with a jumper wire and the fuses were replaced with more reliable fuses.07-034 2012-08 FSAR Figure 9.3-15, SH 1 ECR-50474 - Added a match mark on drawing 302-361 sheet 1 which shows a continuation on new drawing 302-361 sheet

2. New drawing 302-361 sheet 2 was created to show the lift stations outside the protected area.07-035 2012-08 FPER 5.0.E.2(c) ECR-70830A - Replaced Electric Fire Pump Controller.07-038 2012-07 FSAR Figure 2.4-6 ECR-70883 - Yard drainage system was changed to improve legibility and to make minor editorial changes that did not involve design information.08-013 2013-05 FSAR Figure 9.4-32 ECR-50682, Replacement of Control Rod Drive Mechanism Cooling Tower XCIO004.

The new cooling tower is manufactured by the same original equipment manufacturer as the existing tower. This ECR also addresses minor changes in configuration of the new tower compared to the old tower. Figure 9.4-32 was revised to add valves and another level switch.10-012 2013-05 FSAR Figure 9.2.2, Sht 1 ECR-50695, Emergency Feedwater System FSAR Figure 9.2.2, Sht 3 Flow Control Enhancements.

FSAR Figure 10.4-16 Added three notes to Figure 9.2.2, Sheets 1 and 3 to indicate the installation of Cured-In-Place Piping [B16.5 150# TEE 316 SST to eliminate and resist corrosion and the use of Plastocor to prevent corrosion and microbiologically induced corrosion build up].

Added a note to Figure 10.4-16 to indicate valve inlet nozzle and upstream face of disk is covered with Plastocor.

Document Control Desk LTD 325 RC-1 3-0073 Page 3 of 9 RN No. Approval Sections Brief Description Date 10-021 2012-08 FSAR Figure 9.2-5 ECR-50239 - Editorial Change - Revised drawing 302-612 to change valve "XVT09363B-CC" to "XVT09563B-CC".10-023 2012-07 FSAR Figure 1.2-12 ECR-50764 - Safety Improvements to FPER Section 4.4.22.1 DRIB/324 Hatch and Ladder; Health Risk BS-08-01.

FSAR Figure 1.2-12 notes the hatch as a 2'6" x 3'0" removable opening. This note is being changed to reflect the dimension of the new hatch opening which is 2'6"x 4'6". The new hatch was installed under ECR-50764.10-024 2012-11 FSAR Figure 1.2-3 ECR-50685 - In the Auxiliary Building, FSAR Figure 1.2-4 existing hoist (XCRO01 9) was replaced with a FSAR Figure 1.2-5 new equipment lift (XCR0075).

FSAR FSAR Figure 1.2-6 Figure 1.2-8 As part of the ECR, fire extinguishers were FPER Figure E.2-8 3 added to the FPER drawings. The new lift EPERFigre E-023-005 FPER Figure E023005 was added to the FSAR drawings.

FPER Figure E-023-008 FPER Figure E-023-014 10-028 2013-05 FSAR Figure 9.4-21 ECR-50763, Service Building First and Second Floor HVAC Replacement.

Figure 9.4-21 was updated to reflect the current Service Building second floor layout.

This figure was also updated to reflect changes made to refrigeration components and piping of XRC0003, and the change in control system from pneumatic to digital.10-031 2012-07 FSAR Figure 9.2-8 ECR-50728 - Replaced Clay Feeder Mixing Tank and Associated Equipment.

FSAR Figure 9.2-8 is the piping and instrument diagram for the Water Treatment System. The FSAR Figure was updated to capture permanent plant changes resulting from the implementation of ECR-50728. The changes include the replacement of the clay feeder (XTKO068), mixing tank (XTKO071),

solution pump (XPP0062), and associated equipment, piping, and valves.

Document Control Desk LTD 325 RC-13-0073 Page 4 of 9 RN No. Approval Sections Brief Description Date 11-016 2013-05 FSAR Section 9.4.7.2.3 ECR-50763A, First Floor SB HVAC FSAR Figure 9.4-20 Replacement.

FPER Section 4.11.2.1 FSAR Figure 9.4-20 was updated to reflect FPER Section 4.11.2.3 the current Service Building first floor layout.

FPER Section 5.0 This figure was also updated to reflect changes made to refrigeration components and piping of XRC0002 and the change in controls from pneumatic to digital for the first floor HVAC system per ECR-50763A. FSAR Section 9.4.7.2.3 and FPER Sections 4.11.2.1, 4.11.2.3 and 5.0 were updated to reflect the as-built configuration and use of the former permanent records vault and the HVAC changes made in ECR-50763A. The current permanent records vault is now housed in the Nuclear Operations Building.11-018 2012-07 FSAR Table 1.7-1 ECR-50585A - Safety Related Chiller FSAR Table 3.9-0 Replacement.

ESAR Table 3.10-3 Revised FSAR Chapters 1, 3, and 9 and ESAR Figure 9.2 -2, Sh. 1 FPER Chapter 4 to reflect the new safety ESAR FSAR Figure Section9.3-10 9.4.74 related chiller "A" (XHX0001A), which has recently been replaced with a new, state-of-FSAR Figure 9.4-22 the-art chiller. Design features of the new FPER Section 4.4.20.2 chiller and associated piping, valves and FPER Section 4.4.21.2 electrical circuits have been updated in the FPER Section 4.4.23.1 ESAR and FPER.

FPER Section 4.4.23.4 FPER Section 4.4.23.5 FPER Section 4.5.2.2 FPER Figure E-023-007 11-020 2012-12 FSAR Section 5.7.1.4 Change Management Plan (CMP-10-02766).

ESAR Section 17.2.1.2.4 Revised the FSAR to show change of control ESAR Section 17.2.10.3 for the Inservice Inspection Program from Quality Control to Design Engineering and revised information for the Containment Inservice Inspection Program.11-022 2012-08 FSAR Section 10.4.9.4 CR-1 1-01651 - Revised FSAR to correctly describe how the Service Water-to-Emergency Feedwater pump suction valves are tested.

Document Control Desk LTD 325 RC-13-0073 Page 5 of 9 RN No. Approval Sections Brief Description Date 11-025 2012-07 FSAR Figure 10.4-10 ECR-71598 - Drawing enhancement to aid with work or tagging.11-027 2013-05 FSAR Figure 1.2-1 ECR-50780C - Alternate Seal Injection.

ESAR Figure 1.2-3 ECR-50780C installed an Alternate Seal FSAR Figure 1.2-10 Injection (ASI) system to provide an FSAR FSAR Figure 1.2-27 Figure 1.2-28A alternate means for Reactor Coolant Pump FSAR Table 3.2-1 (RCP) seal injection to reduce the FSAR Table 3.2-1 Notes probability of RCP seal LOCA.

FSAR Figure 3.8-73 The ASI takes suction from the Refueling FSAR Table 3.9-7 Water Storage Tank via the 20 inch FSAR Section 5.5.7 discharge header and discharge to the 2" FSAR Section 9.3.4.1.5 seal injection line upstream of the filters. A FSAR Section 9.3.4.2.1 check valve is provided (under ECR 50780)

FSAR Table 9.3-4 in the seal injection line to prevent back FSAR Table 9.3-5 flow to the charging pump header and FSAR Figure 9.3-16 SH 3 normal injection line through FCV-122.

FSAR Figure 12A.4-4 11-028 2012-07 FSAR Figure 1.2-1 ECR-71558 (CR-10-03242) - Parr Hydro Project Boundary Line (PBL).

The PBL was added to a plant layout drawing.11-030 2012-07 FPER 3.6 ECR-50556 Hour Emergency Battery Light Upgrades.

ECR installed additional emergency lighting units at various locations in the plant to enhance lighting required for the performance of local manual actions needed to accommodate Appendix R safe shutdown.11-034 2012-09 FSAR Table 6.2-53a TS Amendment 191 deleted five High Head Safety Injection Containment Isolation Valves from the Local Leak Rate Test Program.

FSAR Table 6.2-53a was revised to reflect this NRC approved deletion.11-038 2012-11 FPER Figure 023-007 ECR-71012 - Proper location of portable fire FPER Figure 023-008 extinguishers.

FPER Figure 023-010 FPER drawings were revised to show the FPER Figure 023-019 proper locations of portable fire extinguishers.

FPER Figure 023-022

Document Control Desk LTD 325 RC-1 3-0073 Page 6 of 9 RN No. Approval Sections Brief Description Date 11-039 2012-07 FSAR Section CR-1 2-00713 - Wording was be changed to 5.5.7.1.1.3.3.i say, "Normal Charging Isolation Valve 8146 -

If the normally open valve closes spuriously, alternate charging valve 8147, which fails open, can be used." This will eliminate any confusion caused by the current wording of

"...which fails to open..."11-040 2012-05 FSAR Section 3A CR-10-03108 (TS Amendment 188) - License FSAR Section 13.1 Amendment Request for the new Quality FSAR Section 13.4 Assurance Program Description (QAPD) to FSAR Section 13.5 change the program to comply with the FSAR Section 13.6 requirements of ANSI/ASME NQA-1-1994.

ESAR ESAR Section 17.2 Fetigu 17.2-1 Removed the Quality Assurance Program information from Chapter 17, Section 17.2, and identified that the information is found in the QAPD. Revised Regulatory Guide commitments in Chapter 3, Appendix 3A, related to the application of the new QA program. Revised Chapter 13 to reference new requirements in the QAPD.12-004 2012-09 FSAR Table 3.9-8 ECR-50780 - Alternate Seal Injection.

Added active code valve XVC18529-CS to FSAR Table 3.9-8. This change was required due to implementation of the ECR-50780 base package. This change was not included in the previous FSAR RN 11-009 approved November 2011.12-005 2013-05 FSAR Figure 1.2-1 ECR 71498 -Waste Oil Incinerator FSAR Figure 2.4-6 Demolition.

ESAR Index 11 -iii Removed the Incinerator Building from site FSAR Section 11.7 (remAReco 1to drawings removeand the Section 11.7.

incinerator ECR from was written service and any related buildings or materials.12-009 2013-02 FSAR Figure 5.1-1, SH 2 ECR-71669 - Valve Shown in Wrong Position.

Isolation valve XVTOO100-WG was changed from "normally open" to "normally closed" on drawing 302-602. Valve was installed by MRF-21256 as normally closed.

Document Control Desk LTD 325 RC-1 3-0073 Page 7 of 9 RN No. Approval Sections Brief Description Date 12-011 2012-11 FSAR Figure 10.4-14 ECR-71665 (CR-12-00337) - Valves Shown in Wrong Position.

Valves XVD06102B and XVD06103B were changed from "normally closed" to "normally open"on drawing 302-782.12-014 2012-11 FSAR Figure 9.2-1 ECR-71215 - Editorial change.

FSAR Figure 9.2-4 Drawing 302-222 was converted from 1 sheet FSAR Figure 9.3-5 to 4 sheets to make the document easier to FSAR Figure 9.4-22 read and follow. Match Marks on 8 drawings FSAR Figure 9.4-25 were revised to show the new 302-222 sheet FSAR Figure 9.4-25 n m es FSAR Figure 9.5-1, SH 3 FSAR Figure 10.4-16 12-015 2013-05 FSAR Figure 10.4-16 ECR 71718 - Corrected Typographical Error with IFT03561A.

When this figure was enhanced per ECR-50239 (Rev. 43), 1FT3561A was typed as IFT3531A (coordinate B11). The instrument in the plant is not affected and remains as IFT3561A.12-018 2013-05 FSAR Section 9.3.1.2 ECR-50577 - Diesel Air Compressor Auto-FSAR Section 9.3.1.5 Start Addition.

FSAR Table 9.3-1 This ECR eliminated an Operator Recovery FSAR Figure 9.3-2 Action by providing the diesel driven air compressor, XAC0014, with an Auto-Start signal. Figure 9.3-2 was updated to reflect the electronic signal from IPS08395 to XAC0014. Section 9.3.1 was revised to include discussion of the diesel air compressor.12-019 2012-07 FSAR Section 2.4.12.2 CR-12-02022 - Correct numerical errors on page 2.4-26.

Updated Section 2.4.12.2, pg 2.4-26, to provide correct information concerning spatially-averaged Cs-137 peak concentration across the effective width of the contaminated local aquifer (3.7 x 10-35). The discharge from the uncontaminated portion of the local ground water system was changed to 0.52 cfs.

Document Control Desk LTD 325 RC-1 3-0073 Page 8 of 9 RN No. Approval Sections Brief Description Date 12-021 2013-04 FSAR Figure 9.1-3 Six different changes were made to Drawing FSAR Figure 9.5-1, SH 3 302-231, Sheet 3, covering Revisions 5 FSAR Figure 9.5-1, SH 5 through 10 - ECR-50205 (Kaowool) and ECR-50692 (B5b).12-022 2012-06 FPER Figure 3.2-1 CR-12-02035 - Reassigned the operator actions for emergency feedwater during control room evacuation from the Shift Technical Advisor (STA) to the Fire Emergency Procedure (FEP) Operator.12-027 2012-12 FSAR Section 4.3.4 CR-10-03107, Technical Specification FSAR Section 7.7.7 Amendment 190, BEACON.

FSAR Section 15.3.8 TS Amendment 190 adopted the revised BEACON power distribution methodology that incorporated the use of the three-dimensional advance nodal code neutronic model into SPNOVA/BEACON. This revision notice updated references to the WCAP-12472-P-A Addendum 1-A.12-033 2013-01 FSAR Section 12 CR-12-02080 - FSAR Table 12.3-3, "Portable FSAR Table 12.3-3 Health Physics Instruments", was revised to change Location Column for all portable survey instruments from "412' Control Building" to "Refer to Section 12.3.2.1.2".

Also changed location for air samplers to "various".12-042 2013-05 FSAR Section 4.2.2.2.2 ECR-50846, Relief Request RR-11I-09, FSAR Section 5.4.2 Reactor Vessel Head.

The FSAR was updated to reflect the Reactor Vessel Head weld repairs and installation of Flow Restrictor on Upper Internals.13-001 2013-05 FSAR Figure 5.1-1, Sh 3A ECR-50683 - RCP/RB Fan Vibration System FSAR Figure 5.1-1, Sh 3B Replacement.

FSAR Figure 5. 1-1, Sh 3C The existing Reactor Coolant Pump (RCP)

FSAR Section 5.5.1.2 Vibration System, a Bentley Nevada (BN) 7000 Series Vibration Monitoring System, (XCP6090) and existing Reactor Building (RB) Fan Vibration System (IYM9295) were removed and replaced with a BN 3500 Series Machinery Protection System.

Document Control Desk LTD 325 RC-13-0073 Page 9 of 9 RN No. Approval Sections Brief Description Date 13-002 2013-04 FSAR Figure 8.2-3 ECR-50851 - Determinated Circuit ESM361X and Recalibrated Overcurrent Relay of XSW1B-12.13-005 2013-04 FSAR Section 12.3.1.1.1 CR-12-02077 and CR-1 2-02078 - FSAR FSAR Section 12.3.1.1.2 Section 12 was revised due to organizational changes identified during a QA Audit - Station Radiation Control Audit.13-009 2013-05 FSAR 7.7.3.1 CR-1 2-03645 - Safety Parameter Display System (SPDS).

Added language to the SPDS description to illustrate that SPDS provides a continuous indication of plant parameters except in the case that a seismic event results in the loss of IPCS.13-010 2013-05 FSAR 6.2.3.2.1 ECR-71830 (MRF-20168; CR-12-05293) -

NaOH Tank Recirculation Loop from MRF-20168.

Updated Section 6.2.3.2.1 to add description of NaOH tank recirculation loop installed under MRF-20168.

Document Control Desk LTD 325 RC-13-0073 Page 1 of 1 INFORMATION REMOVED FROM THE FSAR/FPER SINCE THE NOVEMBER 2011 UPDATE RN No. Approval Sections Brief Description Date 11-040 2012-05 FSAR Section 3A CR-10-03108 (TS Amendment 188) - License FSAR Section 13.1 Amendment Request for the new QAPD to FSAR Section 13.4 change the program to comply with the FSAR Section 13.5 requirements of ANSI/ASME NQA-1-1994.

ESAR Section 13.6 Removed the Quality Assurance Program FSAR Section 17.2 information from Chapter 17, Section 17.2, Figure 17.2-1 and identified that the information is found in the Quality Assurance Program Description (QAPD). Revised Regulatory Guide commitments in Chapter 3, Appendix 3A, related to the application of the new QA program. Revised Chapter 13 to reference new requirements in the QAPD.12-005 2013-05 FSAR Figure 1.2-1 ECR 71498 -Waste Oil Incinerator FSAR Figure 2.4-6 Demolition.

ESAR Index 11 -iii Removed the Incinerator Building from site FSAR Section 11.7 drawings and Section 11.7. ECR was written (remAReco 1to remove the incinerator from service and any related buildings or materials.