(VCSNS) Unit 1, Request for Weld Recategorization for VCSNS Steam Generator Nozzle to Safe End Welds (Preliminary Submittal - RR-III-08)
ML12177A381
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 06/21/2012
From: Gatlin T
South Carolina Electric & Gas Co, SCANA Corp
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
RC-12-0097, RR-111-08
Download: ML12177A381 (183)


Text

Thomas D. Gatlin Vice President,Nuclear Operations 803.345.4342 A SCANA COMPANY June 21, 2012 RC-12-0097 Document Control Desk U. S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir / Madam:

Subject:

VIRGIL C. SUMMER NUCLEAR STATION (VCSNS) UNIT 1 DOCKET NO. 50-395 OPERATING LICENSE NO. NPF-12 REQUEST FOR WELD RECATEGORIZATION FOR VCSNS STEAM GENERATOR NOZZLE TO SAFE END WELDS

[PRELIMINARY SUBMITTAL - RR-111-08]

Pursuant to 10CFR50.55a(g)(6)(ii)(F)(2), South Carolina Electric & Gas Company (SCE&G), acting for itself and as an agent for South Carolina Public Service Authority (Santee Cooper), hereby submits the attached requests for recategorization for the Steam Generator Nozzle Dissimilar Metal Welds.

Due to the June 21, 2011 rulemaking change to 10CFR50.55a [FR36232 Volume 76, Number 119], the primary steam generator (SG) nozzle to safe end welds are required to have a baseline inspection performed in the first outage following January 20, 2012.

For VCSNS the next outage is RF-20 scheduled for Fall 2012. The rulemaking requires the use of ASME Boiler & Pressure Vessel Code (BPVC) Code Case N-770-1 with conditions specified in 10CFR50.55a(g)(6)(ii)(F). VCSNS is requesting for alternative categorization to inspection Item G of Code Case N-770-1 and an alternative to the implementation date requirements contained in 10CFR50.55a(g)(6)(ii)(F)(3) to be provided at a later date. Enclosure 1 provides the basis for the proposed weld recategorization and addresses the concerns provided within NRC document "Summary of Public Meeting Between the Nuclear Regulatory Commission Staff and Industry Representatives on Implementation of ASME Code Case N-770-1," [ML112240818]

dated August 12, 2011.

Per teleconference between the NRC and VCSNS, the station is providing this preliminary supporting information for recategorization of the steam generator nozzle safe end welds. VCSNS will provide the remainder of the bases for recategorization and will request approval of an alternative inspection date, in accordance with paragraphs 10CFR50.55a(a)(3)(ii), in a later submittal. It is anticipated that the remainder of the information required for the recategorization and the relief request will be submitted in the third week of July 2012.

VU41 Virgil C.Summer Station - Post Office Box 88. len kinsville, SC.- 29065.- F(803) 345-5209

Document Control Desk CR-12-00556 RC-12-0097 Page 2 of 2 SCE&G will be requesting NRC approval of the proposed alternatives by October 12, 2012 to support refueling milestones and compliance with 10CFR50.55a(g)(6)(ii)(F)(3).

This letter contains no commitments. Should you have any questions, please call Bruce L. Thompson at 803-931-5042.

Very truly yours, Thomas D. Gatlin JG/TDG/gr : Request For Weld Recategorization Attachmernt 1: Replacement Steam Generator Primary Inlet/Outlet Nozzle to Safe End Weld Design Attachmernt 2: Final NDE Inspection Reports Attachmernt 3: First Inservice Inspection for Steam Generator "A" c: Without Attachments 2 and 3 unless noted with an

  • K. B. Marsh S. A. Byrne J. B. Archie N. S. Cams J. H. Hamilton R. J. White W. M. Cherry V. M. McCree*

R. E. Martin*

NRC Resident Inspector K. M. Sutton NSRC RTS (CR-12-00556)

File (810.19-2)

PRSF (RC-12-0097)

Document Control Desk CR-12-00556 RC-12-0097 Page 1 of 11 South Carolina Electric & Gas Co. (SCE&G)

Virgil C. Summer Nuclear Station Unit I (VCSNS)

Request For Weld Recategorization

1. ASME Code Component(s) Affected The affected components are the VCSNS, Steam Generator Nozzle (Hot and Cold Leg) to Safe End Welds which are Alloy 82 with an Alloy 152 inlay that was originally installed during fabrication. The VCSNS third 10-year inservice inspection (ISI) interval ends December 31, 2013.

Table 1 Examination Inspection Category Item Description N-770-1 A-2 Weld CGE-1-4100A-31DM, Steam Generator "A" Hot Leg Nozzle N-770-1 B Weld CGE-1-4100A-32DM, Steam Generator "A" Cold Leg Nozzle N-770-1 A-2 Weld CGE-1-4200A-28DM, Steam Generator "B" Hot Leg Nozzle N-770-1 B Weld CGE-1-4200A-29DM, Steam Generator "B"Cold Leg Nozzle N-770-1 A-2 Weld CGE-1-4300A-29DM, Steam Generator "C" Hot Leg Nozzle N-770-1 B Weld CGE-1-4300A-30DM, Steam Generator "C" Cold Leg Nozzle

2. Applicable Code Edition and Addenda

ASME Code Section Xl, "Rules for Inservice Inspection of Nuclear Power Plant Components," 1998 Edition through 2000 Addenda.

3. Applicable Code Requirement

Code Case N-770-1, "Alternative Examination Requirements and Acceptance Standards for Class 1 PWR Piping and Vessel Nozzle Butt Welds Fabricated with UNS N06082 or UNS W86182 Weld Filler Material With or Without Application of Listed Mitigation Activities Section Xl, Division 1."

ASME Code Section Xl, Division 1, "Rules for Inspection and Testing of Components of Light Water Cooled Plants."

Article IWB-2500, "Examination and Pressure Test Requirements" Table IWB-2500-1, "Examination Categories"

Document Control Desk CR-12-00556 RC-12-0097 Page 2 of 11

4. Reason for Request

Recategorization is being requested due to the imposed rulemaking change to 10CFR50.55a [FR36232 Volume 76, Number 119], issued June 21, 2011. The rulemaking change requires the use of ASME Boiler & Pressure Vessel Code (BPVC)

Code Case N-770-1 with conditions specified in 10CFR50.55a(g)(6)(ii)(F) specifically for Class 1 Piping and Nozzle Dissimilar-Metal Butt Welds. As stated within 10CFR50.55a(g)(6)(ii)(F)(2):

"...all other butt welds that rely on Alloy 82/182 for structural integrity shall be categorized as Inspection Items A-1, A-2 or B until the NRC staff has reviewed the mitigation and authorized an alternative code case Inspection Item for the mitigated weld..."

VCSNS is requesting an alternative categorization to inspection items specific to the six replacement Steam Generator Nozzle (Hot and Cold Leg) to Safe End Welds which are Alloy 82 with an Alloy 152 inlay that was originally applied during fabrication. Based on the manufacturing process of the replacement steam generators (RSG) and guidance from Code Case N-770-1, the VCSNS Steam Generator Nozzles' (Hot and Cold Leg)

Safe End Welds should be categorized as Inspection Item G, "Uncracked Butt Weld Mitigated With An Inlay."

5. Proposed Alternative and Basis for Use VCSNS is requesting an alternative categorization for replacement Steam Generator Nozzles (Hot and Cold Leg) Safe End Welds. Due to the imposed rulemaking change to 10CFR50.55a, VCSNS Steam Generator Nozzles (Hot and Cold Leg) to Safe End Welds are categorized as Code Case N-770-1 Inspection Items A-2 and B. Based on the manufacturing process of the replacement steam generators and guidance from Code Case N-770-1, VCSNS Steam Generator Nozzle (Hot and Cold Leg) Safe End Welds should be categorized as Inspection Item G, "Uncracked Butt Weld Mitigated With An Inlay."

VCSNS has three Delta-75 steam generators that were installed as replacements in fall 1994 (RF8). The replacement steam generators (RSG) were placed in service in December 1994 and have been in service for 17 calendar years. The steam generators are vertical shell and U-tube evaporators with integral moisture separating equipment.

The units are primarily carbon steel and the interior surfaces of the reactor coolant channel head and nozzles are clad with austentic stainless steel. The Steam Generator Nozzles (Hot and Cold Leg) and Safe Ends are joined by Alloy 82 with an Alloy 152 inlay that was originally applied during fabrication. The design basis for the Hot Leg Operating Temperature at full power is 621.9 degrees Fahrenheit and at the Cold Leg 552 degrees Fahrenheit.

The VCSNS steam generators were fabricated with factory welded forged stainless steel safe ends, attached to the primary inlet/outlet nozzles with Alloy 82 welds. The

Document Control Desk CR-12-00556 RC-12-0097 Page 3 of 11 Alloy 82 weld material is sealed with Alloy 152 cladding on the channel head integral nozzle inside diameter (including the Alloy 82 weld deposited buttering) and with inlays of Alloy 152 on the inside surface of the dissimilar metal (DM) nozzle to safe end welds, so as to avoid primary water contact with the Primary Water Stress Corrosion Cracking (PWSCC) susceptible Alloy 82 weld material. This configuration is shown on of this enclosure. According to the requirements of the now mandatory Code Case N-770-1, these DM weld regions must be inspected at a higher frequency (5 years and 7 years for replacement steam generators (RSG) primary inlet and outlet nozzle DM welds respectively) than the 10 year frequency normally required by ASME Section XI.

Since the DM welds of these nozzles do not have susceptible material exposed to the primary water environment because of the Alloy 152 cladding and weld inlay on the inside wetted surfaces, it would be beneficial to categorize them as Inspection Item G "Un-cracked butt weld mitigated with an inlay" according to the Code Case, but the DM welds for these nozzles are currently being categorized as Inspection Items A-2 and B "unmitigated butt welds".

South Carolina Electric & Gas Company (SCE&G) is providing the following information that was discussed within Question 29 from "Summary Of Public Meeting Between The Nuclear Regulatory Commission Staff And Industry Representatives On Implementation Of ASME Code Case N-770-1," [ML112240818] dated August 12, 2011.

Document Control Desk CR-12-00556 RC-12-0097 Page 4 of 11 Item Description 1 pre-inlay/onlayexaminations performed including eddy current examination and acceptance criteria followed,

[VCSNS Response]

Channel head nozzle base metal surface - Magnetic particle test (MT) prior to weld buttering per NB-5130 requirements with the additional restriction of 0.06" maximum length for NB-5130(b) laminar type imperfections.

Channel head nozzle with weld buttering machined bore surface - Penetrant test (PT) prior to weld overlay per NB-5000 requirements with the additional restriction of 0.25" maximum length for the NB-5130(b) laminar type imperfections.

Channel head nozzle as overlayed/clad bore surface - Ultrasonic test (UT) for lack of bond and for defects per Section V, Article 5, paragraph T-543, techniques 1 & 2.

Channel head nozzle with machined safe end prep - PT the ID, OD and end prep per NB-5000 requirements with the additional restriction of 0.25" maximum length for the NB-5130(b) laminar type imperfections.

Nozzle to safe end weld prior to final machining - UT per IWB-2500 requirements and PT per NB-5000 requirements with the additional restriction of 0.25" maximum length for the NB-5130(b) laminar type imperfections. Radiographic test (RT) examine the entire nozzle end weld buttering and the ID tie-in, the safe end weld and 0.50" minimum to each side per NB-5000 requirements.

Final machined surfaces (the primary nozzle safe end forging, the safe end weld, the nozzle buttering, the nozzle ID overlay/cladding and nozzle OD forging) - PT per NB-5000 requirements. Indications with major dimensions greater than 0.03" shall be reported to engineering for information.

Reference Attachment 2, for the Final NDE Inspection Reports.

Document Control Desk CR-12-00556 RC-12-0097 Page 5 of 11 2 repairs performed and any fillers materials used

[VCSNS Response]

Weld repairs were performed on the nozzle to safe end DM welds for all three Steam Generators.

For the shop order 12148 RSG, the Outlet Nozzle (W-Z) had a linear indication in the weld inlay and several rounded indications in the buttered nozzle overlay of the nozzle to safe end welds.

All indications were removed by grinding, re-inspected to confirm removal, and the areas were welded with Alloy 52. The inlet nozzle (W-X) had no indications.

For the shop order 12149 RSG, the Inlet Nozzle (W-X) had three linear indications in the buttered nozzle overlay. All indications were removed by grinding the inside diameter (ID) and the areas were welded with Alloy 52. Also for the shop order 12149 RSG, Outlet Nozzle (W-Z) had two areas on the outside diameter (OD) with lack of fusion and one area on the ID with defects within the nozzle to safe end groove weld. All areas were machined to remove the areas of lack of fusion and defects then the OD and ID grooves were welded with Alloy 82 followed by the final 0.27 inch inlay on the ID being welded with Alloy 152.

For the shop order 12150 RSG, the Inlet Nozzle (W-X) had 5 locations with defects in nozzle buttering found while welding the OD of nozzle to safe end weld. All defects were removed by grinding the OD and the areas were welded with Alloy 82. Also, for the shop order 12150 RSG, the Outlet Nozzle (W-Z) had one area of lack of fusion located 1.75 inches deep from the ID surface. The area was removed by grinding and welded with Alloy 152. The Outlet Nozzle (W-Z) also had two other areas with linear indications and lack of fusion that were located at 1.3 inches to 1.65 inches from the ID surface. These areas were removed by grinding then the ID grooves were completely welded with Alloys 52 and 152.

In each case, the thickness of the inlay after the repair was not affected, as the inlay was reworked to design requirements.

Document Control Desk CR-1 2-00556 RC-1 2-0097 Page 6 of 11 inlaylonlay materialsused, including chromium content and the method used to determine the as-depositedweld bead chromium content

[VCSNS Response]

A summary of the weld metal with Chromium content is provided in Table 2.

Table 2 Steam Generator A B C Shop Order Number SG3L-12148 SG3L-12150 SG3L-12149 Channel Head 3591J 3590J 3589J Assembly SIN Channel Head 0.15% Cr 0.18% Cr 0.16% Cr Safe Ends 16.70% Cr 16.75% Cr 16.75% Cr Nozzle Alloy 82 19.38% Cr 20.25% Cr 20.58% Cr Buttering Nozzle/Buttering Bore 28.78% Cr 28.78% Cr 28.78% Cr Alloy 152 Cladding Nozzle to Safe End 19.38% Cr 20.34% Cr 19.38% Cr Groove Alloy 82 Weld Nozzle to Safe End 29.02% Cr 28.84% Cr 28.78% Cr Alloy 152 Weld Inlay methods used to identify the dissimilarmetal weld fusion zones and the accuracy of the methods used,

[VCSNS Response]

There is no issue regarding identification of the edges of the dissimilar metal welds, to ensure the coverage is complete, for the replacement steam generators. As shown in Attachment 1, the inlay merges with the stainless cladding at a location over the carbon steel nozzles, so even if there was incomplete coverage, the susceptible materials would not be exposed. At the upper end of the configuration, the Alloy 52/152 extends to the edge of the weld preparation groove, thus ensuring that the coverage will be complete. Further verification that the coverage is complete comes from the NDE performed on the weld region before the replacement steam generators left the shop.

Document Control Desk CR-1 2-00556 RC-12-0097 Page 7 of 11 5 qualifications of the weld procedure specifications,welders and welding operators

[VCSNS Response] To be provided upon completion of flaw evaluation.

pp-flweand post-weld heat treatment or temper bead welding requirements

[VCSNS Response]

The channel head nozzles were post-weld heat treated after the nozzle ends were buttered with Alloy 82 and the nozzle inside diameter was clad with Alloy 152, at 1125 +/- 25 degrees Fahrenheit for 1.75 to 2.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br />. The inlay requires a minimum of 30 minutes at the same temperature range, so it was done coincident with the longer heat treatment.

7 1 design and analysis requirements used, in detail,

[VCSNS Response]

The design and analytical requirements for these replacement Steam Generators were taken directly from Section III of the ASME Code. The stress and fatigue evaluation requirements are contained in NB-3000 of the Code, and the stress report confirms that all applicable limits were met by the design. There were no additional requirements imposed, as Code Case N-770 did not exist at the time.

Document Control Desk CR-12-00556 RC-12-0097 Page 8 of 11 8 preservice and inservice inspections performed since installationof the 8 inlays/onlays

[VCSNS Response]

The Section XI pre-service inspections were performed by Wesdyne International on all three generators in July of 1994. Both UT and liquid penetrant exams were performed, and no recordable indications were detected in any of the three steam generators.

As required by Section XI, an in-service examination was performed in October of 1997 on one steam generator. Again, both UT and liquid particle exams were performed that time by Raytheon. As before, there were no reportable indications.

SCE&G submitted and received NRC approval under Relief Request RR-II-07 that approved Risk-Informed Inservice Inspections as an alternative to ASME Section XI inspection requirements. VCSNS Risk-Informed Inservice Inspection Program was developed in accordance with NRC approved EPRI Technical Report (TR)-1 12657 [ML993190474]. Under this program VCSNS determined the Steam Generator Nozzles (Hot and Cold Leg) Safe End Welds as Low Risk as defined within ASME Code Case N-578 guidance. As Low Risk welds, volumetric exams were not required but pressure/leak testing was still maintained. The NRC review of the quality and safety of the program was approved on May 12, 2003 [ML031320443]

then reaffirmed on September 6, 2005 [ML052300616].

Reference Attachment 3, for the First Inservice Inspection for Steam Generator "A".

ASME Code Editions and Addenda associatedwith requirements used, where applicable,and figures, as applicable,to assistin describingthe information submitted in conjunction with the request for alternative categorization

[VCSNS Response]

The replacement Steam Generators were fabricated to the 1971 edition of Section III, with addenda up to and including Summer 1971. The material properties used for the replacement generators were taken from the 1986 edition of the ASME code, for materials not available in the 1971 Code. The Alloy 690 and 52/152 properties were taken from Code Cases N-20 and N-474, and from the 1992 edition of the ASME Code,Section III. The specification for Alloy 690 and Alloy 52/152 was not contained in the earlier editions.

The plant is now using the 1998 edition of Section XI, with the 2000 Addenda.

Document Control Desk CR-12-00556 RC-12-0097 Page 9 of 11 10 1 thickness of inlaylonlay

[VCSNS Response]

As shown in Attachment 1 of this enclosure, the nominal thickness for the Alloy 152 applied over the buttering was 0.25 inches, while the nominal thickness of the Alloy 152 applied over the dissimilar metal weld was 0.13 inches.

The fabrication sequence as documented in the manufacturing records is summarized as follows:

  • The carbon steel channel head integral nozzle end is buttered with weld-deposited Alloy 82 and preliminarily machined per drawing.

" The channel head nozzle inside diameter is clad with weld deposited stainless steel to within approximately 2 inches of the top of the buttered nozzle end per drawing. The first layer of cladding is 309L stainless steel followed by 308L stainless steel for the remaining layers.

  • The nozzle inner diameter region from the stainless steel cladding to the end of the Alloy 82 buttered nozzle end is clad with weld-deposited Alloy 152.
  • The nozzle end is machined with the safe end weld prep.
  • Post-weld heat treat the channel head nozzle end for 1.75 to 2.25 hours2.893519e-4 days <br />0.00694 hours <br />4.133598e-5 weeks <br />9.5125e-6 months <br /> at 1125 +/- 25 degrees Fahrenheit is performed.

" The safe end forging is welded to the channel head nozzle with a double V-groove Alloy 82 weld.

" The final 0.27 inch of the nozzle inside diameter V-groove Alloy 152 weld (or inlay) is completed.

" The OD and the ID of the nozzle with safe end are final machined.

  • A shop hydrotest is performed and shipping covers are welded to the end of the nozzle safe end.
  • The safe end is machined at site with the piping side weld prep.

flaw evaluation to show adequate thickness againststress corrosion cracking.

11

[VCSNS Response] To be provided upon completion of flaw evaluation.

for primary water stress corrosioncrack growth rates for Alloy 52/152 weld materials,at this time, NRC recommends using the Alloy 182 crack growth rate curve provided in MRP-115, with an improvement factor (IF) of 100 for 12 Alloy 52 welds and an IF of 10 for Alloy 152 welds.

[VCSNS Response] To be provided upon completion of flaw evaluation.

Document Control Desk CR-12-00556 RC-12-0097 Page 10 of 11

6. Duration of Proposed Alternative:

This request for an alternative categorization for Steam Generator Nozzles (Hot and Cold Leg) to Safe End Welds will be a permanent change to the program for the duration of the operating license and license renewal. The Facility Operating License (NPF-12) was issued August 6, 1982 and was superseded by Renewed Facility Operating License issued on April 23, 2004. VCSNS is in the last period of its third 10 year inservice inspection (ISI) interval that will end December 31, 2013.

Per 10CFR50.55a(g)(6)(ii)(F)(3) the baseline examination shall be completed by the end of the next refueling outage after January 20, 2012. VCSNS will also be requesting relief under a later submittal to this letter to delay the baseline examination to 2014 (RF21).

7. Precedents:

None.

8.

References:

Proprietary documents may be viewed at the Westinghouse Rockville, MD. office.

1. 10CFR50-55a, Codes and Standards
2. FR36232 Volume 76, Number 119, issued June 21, rulemaking change to 10CFR50.55a
3. Public Meeting Summary ASME N-770-1 [ML112240818]
4. Virgil C. Summer Nuclear Station - Relief Request (RR-II-07) Associated with the Risk-Informed Inservice Inspection (RI-ISI) Program (TAC NO. MB6523)

[ML031320443]

5. ASME CODE CASE N-770-1
6. ASME Boiler and Pressure Vessel Code, Section Xl, 1998 Edition through 2000 Addenda, American Society of Mechanical Engineers, New York.
7. EPRI 1010087 MRP-139
8. VCSNS Drawings [PROPRIETARY]
a. 1MS-07-400-0001, Machining and Assembly - Channel Head Welding (6145E22)
b. 1MS-07-400-0003, Primary Nozzle - Channel Head Welding (6145E22)

Document Control Desk CR-12-00556 RC-12-0097 Page 11 of 11

c. 1MS-07-400-0004, Nozzle Safe End Weld - Channel Head Welding (6145E22)
d. 1MS-07-400-0005, Safe End Final Machining - Channel Head Welding (6145E22)
e. 1MS-07-400-0007, General Notes - Channel Head Welding (6145E22)
f. CGE-1-4100A-31DM, Weld Profile, Steam Generator "A" Hot Leg Nozzle
g. CGE-1-4100A-32DM, Weld Profile, Steam Generator "A" Cold Leg Nozzle
h. CGE-1-4200A-28DM, Weld Profile, Steam Generator "B" Hot Leg Nozzle
i. CGE-1-4200A-29DM, Weld Profile, Steam Generator "B" Cold Leg Nozzle
j. CGE-1-4300A-29DM, Weld Profile, Steam Generator "C" Hot Leg Nozzle
k. CGE-1-4300A-30DM, Weld Profile, Steam Generator "C" Cold Leg Nozzle
9. Westinghouse LTR-SGDA-12-27 [PROPRIETARY], V. C. Summer Unit 1 Replacement Steam Generators - Manufacturing Records for Channel Head Primary Inlet/Outlet Nozzle to Safe End Welds, Dated June 18, 2012.

Document Control Desk CR-12-00556 RC-12-0097 Page 1 of 1 South Carolina Electric & Gas Co. (SCE&G)

Virgil C. Summer Nuclear Station Unit I (VCSNS)

Attachment 1 Safe End - Stainless Steel Base Metal Weld Inlay - /

,Alloy 152 Filler Metal 0.13" Thick (Nominal)

Safe End to Nozzle Weld Alloy 82 Filler Metal Nozzle Buttering -

Alloy 82 Filler Metal Nozzle (Channel Head Weld Cladding - Forging) - Carbon Steel Base Alloy 152 Filler Metal Metal Channel Head Cladc 0.25" Thick (Nominal)

Stainless Steel Filler Metal Figure 1 V. C. Summer Unit 1 Replacement Steam Generator PrimaryInlet/Outlet Nozzle to Safe End Weld Design Note: Westinghouse design drawing 6144E65 identifies the channel head forging material as SA-508 Class 3a per Westinghouse specification A508C22.

Document Control Desk CR-12-00556 RC-12-0097 164 pages South Carolina Electric & Gas Co. (SCE&G)

Virgil C. Summer Nuclear Station Unit I (VCSNS)

Attachment 2 Final NDE Inspection Reports Steam Generator A C B Shop Order Number SG3L-12148 SG3L-12149 J SG3L-12150 Lower Assembly SIN 2984J 2985J 2986J Channel Head Assembly 3591J 3589J 3590J S/N Channel Head Forging RW27 RV85 RW21 Heat Safe End Forging Heats RY17 RY18 RY13 RY16 RY14 RY15

SCE&G - SG3L12148..

LOWER ASSEMBLY COMPLETE - SN 2984J FINAL N.DEINSPECTION REPORTS RgUoNG DESCRBIPTION PAGE 6145E22 T01 CHANNEL HEAD NOZZLE & MANWAY BUTTERING 539 6145E22 T02 CHANNEL HEAD BORE CLADDING 548 6145E22 T03 CHANNEL HEAD BOWL CLAD 553 6145E22 G01 CHANNEL HEAD 563 6145E39 G02 PLUG ASSEMBLY (2); 4077J & 4078J 608 6145E71 GOI AVB ASSEMBLY 611 6145E85 GOI LOWER ASSEMBLY COMPLETE *= 84p-9741 D82 GO1 AVB END CAP ASSEMBLY 880 0 9742D06 HO1 SAFE END MACHINING (2) 893 0

SCE&G - V.C SUMMER SGR PROd; RO: Q594~687 PAGE_____________

I SCE&G - SG3L12148 LOWER ASSEMBLY COMPLETE - SN 2984J 6145E22,T01 SN 3591J QmN NAIDE 020 MT PRIMARY NOZZLE BUILD UP AREAS 540 045 VT W-X PRIMARY NOZZLE BUILD UP AREA 541 225 VT W-Z PRIMARY NOZZLE BUILD UP AREA 542 410 VT Y-Z PRIMARY MANWAY BUILD UP AREA 543 455 VT Y-X PRIMARY MANWAY BUILD UP AREA 544 630 PT PRIMARY NOZZLE MACHINING AND BUILD UPS (ID & OD) 545 640 RT PRIMARY NOZZLE BUILD UPS 546 0

SCE-&G - V.C. SUMME SGR PROJ; P.O.: 0594587 PAGE J'-J 2

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 SfO No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12150 6145E22 T01 01 1 135915 1020 1 Ad No.fInsp. No. Rej. MDR No. Ref. MDR No. [x] Yoke '[x Dry Io_ IX] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHI'T&IW BU - ,71V , _______

INSPECTOR DATE LEVEL II STAMP R W COOKE 04/16/93

( )Weld ( )Weld Prep 5X)Base metal C )Root Pass

( )Backgouge ( )Other:-- _ _ _ _

MANUFACTURER:

MT UNIT: (]PARKER (IOTHER: 24 WPP I.D. NUMBER:/j-2T--7' _

TEST WEIGHT I.D. NUPMER: /7-34L*

POWDER: M MAGNAFLUX E ] OTHER:__ _

COLOR:- RED [ 1rRAY [ BLACK I YELLOW [ I OTHER:

W HEAT CODE NUMBER: /7 O SKETCH OR DESCRIPTION OF INDICATION(S):

'/

I APPROVED: U DATE: 5/ /-77 F8820 - 00 SCE&G - V.0. SUMMER SGR PROJ; P-0_: Q5S4657 PAGE. .

Westinghouse Pensacola Plant VISUAL, EXAMINATION RECORDING FORM QIP 8608 REV:03 S/O No Drawinglitem Sub DR ISN/Lot Opn.No- W--T Code/Ident.

6,/ 5" niz.--- q.j*/,

Number Inspected 1 Number Rejected MDR No. Ref. MDR No.

ROUTING DE/CRIPTION J JOINT/SEAM IDENTIFICATION 9-4*-9'7 3 jLEVEL IZ INSPECTOR INSPECTION DATE STAMP

( )Weld ( )Weld Prep jJSase Metal ( )Root Pass

( )Backgouge ( )Other:

VISUAL AIDS USED: f4 NONE ( ] BORESCOPE ( I CAMERA

[ MIRROR [ TELESCOPE [ ] FIBER OPTICS

[ MAGNIFYING LENS Power LIGHTING: NATURAL r FLASH LIGHT [ ] DROP LIGHT ISKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:

F8608 - 01 SCE&G - V0 MV ISRPROJ; P.)-.: 05946387 PG

Westinghouse Pensacola Plant VI SUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/o No Drawing Irtem I Sub DR IS*/*ot Opn.No. W--T Code/Ident-I ,i Number Inspected INumber Rejected MDR No. Ref-. MDR No.

0/ I I/.

ROUTING DESCRIPTION i JOINT/SEAN IDENTIFICATION 6? liI* S J4Le I 5'PIe A 2

A*S I 5 STAMP INS ECTOR DATESV'--I LEVEL II

)Wl 4l Prep *ýase Mietal C)Root PasslI

)Backgouge )Other: . /A I_!

VISUAL AIDS USED: k'<NONE [ I BORESCOPE [ ] CAKERA i ] MIRROR [ ] TELESCOPE [ I FIBER OPTICS, S]~MAGNIFYING LENS Power 1 LIGHTING: I NATUIRAL ><F'LASH LIGHT [ ] DROP LIGHT ISKETCH OR DESCRIPTION OF INDICATION(S): IV APPROVED: / '

A V/D DATE: Sg/ J  ?)

J F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O. 0594687 PAGE_______"__

RAW-0 Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12150 6145E22 T01 03 N/A 3591J 630 N/A No.Insp. No. Rej. MDR NO. Ref. MDR No. [x] Solvent-Removable 01 1 00 N/A N/A [xj Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CH N&MW BU NOZZLES W-x & W-Z , (ID & OD MACHINE & BUILD-UPS INSPECTOR DATE LEVEL II STAMP

J E AINSLEY 07/29/93 (x)Weld ( )Weld Prep (X)Base Metal ( )Root Pass

)Backgouge ( )Other:___

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S RS12 0 PRE-CLEANER MAGNAFLUX SKC-S RT49 REMOVER MAGNAFLUX SKC-S .RT49

ý.

DEVELOPER SKD-S/SKD-S2

,AGNAFLUX RT51 NOTE: REF MDR 354443 WRITTEN ON FALSE CUTS ON W-X NOZZLE, (PT'd CLEAR) /14 SKETCH OR DESCRIPTION OF INDICATION(S):

8APPROVED: 3.3 0

QDATE:

F810S - 02 SCE&G - V.C. SUMMER SGR PROJ; PR0: 0594687 PAGE______-_____

f/ll't' e)NCD PENSACOLA 12150 RADIOGRAPBIC INSPECTION REPORT I ..

LEAD SCEE~NS FRtONT!(1.005- cx.oia I oMFlR HAhC~it1 C20C" [13.010 JI OT14ER .040 10 EL ONE ii's I".NCD-3162213, Rev. 3

f-,1H.

12150 VNCD PENSACOLA 1 1 RADIOGRAPHIC INSPECTION REPORT P'age__ of.--

Shop Order No, CHECH ONE, SUPPLIER I3CASTINS It E'ELMENT L ITE" 15QI3N.2 8332 REV,.0 0 THICICNESSý 5/8" MAllE1 FEj3/N /X ASSEM8LY NO. HJic IORNTIFICERS DRAWING NO- ITEM B COmp. DESCRIPTION OPIER WELD NO. IqT ASME 3591J N/A 6145EZ2 Tol 04 CH N&MW BU 640 OZL Bu TypE I OZZLE ,,, S#5 iSCITOPES CURIES SF0 SITE IPSsw F$5 Fee FFO FS0 M9V $HI~~MSZ 6MT N

,,,.,DUM IOSALY 20 1/4"1 .100 ,x16 KY ML.A NIA N/A ,iZE EIIPOSURI TIME O*N RAO* AlI', LEAD SCREENS WELD PROC.#

SECTION III ,INS (I ND N13 pl*o*i-r, n .oo. tX.oio rSETIN il FRON.OS 93.03".010 IONRWPS.-4532 2S TERTO BACKI 1105 .0i~t" 040

- US% WHEN TECHNIQUt FILfb

& VARIAlION4S REQUIRE TYP ...

__________________Size 72JX.17 IIINARKINO.OF FILMS - CASST..1 1

  • RT'd AF TER CLADDING TTpeOrExpESOSURE: C3

.. _ INPROCESS BUTTERING -, PANORAMIC IIOTHER 041 I Igo- SHOT 1-2--------------------------------- NO. OF 1EXPOSLIREISI 0 SET-UP PERSONNEL & LEVEL

- - - - - - - .. * "3"- RAINSLEY & G.ANTONE 11's 3-4 V, _T. RADIOGRAPHY SET.UP CHECK ONE, 5-6 ,._ __ IX' I I C,

6-7 " v if:

ii *1 9-0 A-, __ _-

0 Ii

~

ci))

CI)

  • X I OIlIER. (SKEICI-I)

RgI)NCDW Level I R Date MRN/MRR No. R.I.R. Nunber Is The:

ar 0r () Finail X-Ray "Oair SEE QIP FOR kef. INt MRR No. In-Process NCD X-Ray 62838 AOITtONAL NS Ey X-Ray Log No.

SETAUF DATA.

  • -..-.--------.'-.--.--.-.----------------- -, ______________________________C - J r-N~ffl-3162211, Rev. 3 0

SCE&G - SG3L12148 LOWER ASSEMBLY COMPLETE - SN 2984J 06 1-45E22 T02 5$N_3591J DM NDE DE*fI.tIA PAGE 030 VT W-X PRIMARY NOZZLE BORE 549 103 VT W-Z PRIMARY NOZZLE BORE 550 I90 VT Y-Z PRIMARY MANWAY BORE 551 280 VT X-Y PRIMARY MANWAY BORE 552 0

ScE&G - V.C. SUMMER SGR PROJ: P.OR 094S7 PAGE l-'

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:11 S/O No Drawing Item Sub DR SN/Lot Opn.No. W--HT Code/Ident.

12150 6145E22 T02 02 1 /J/1f 13591J 030 4 -- -

Number Inspected Number Rejected MDR No. Ref. MDR No.

0/ 1 o 1I 1 A1b ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CH BORE CL W_ >'< AVe/-*/,e d -4. &,9-. ,

INSPECTOR DATE LEVEL II STAMP K J EDMONDS 08/10/93

( )Weld ( )Weld Prep P<fBase Metal ( )Root Pass

( )Backgouge ( )Other: t/A-VISUAL AIDS USED: <4'NONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS r ]MAGNIFYING LENS Power LIGHTING: I ] NATURAL FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S)W: i APPROVED: DATE~: z-to F8629 - 00 SCE&G - V.C. SUMMER SGR PROJ; PO.:"0594W87 PAGE-f -

i Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:ll S/O No Drawing Item Sub DR SN/Lot Opn.No.JW.-HT Code/Ident.

12150 6145E22 II T02 I

02 -

I

//4I 3591J 103 R4No.

Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CH BORE CL ,.'C L ,.

INSPECTOR DATE LEVEL It STh.

J H SHERWOOD 07/31/93

( )Weld ( )Weld Prep (A,4ase Metal ( )Root Pass

( )Backgouge ( )Other:

VISUAL AIDS USED: [ ] NONE C I BORESCOPE C ]CAMERA I MMIRROR [ I TELESCOPE [ ] FIBER OPTICS 0 [ MAGNIFYING 14;11 7e7*

LENS Power LIGHTING: ( I NATURAL FLASH LIGHT [ I DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: \DATE: ZT F8629 - 00 rJRO')

SOE&G -V.0. SUMMEIAiSOPPROJ; P.O.:Q594687 PAQE 5:-

SCE&G - SG3L12148 LOWER ASSEMBLY COMPLETE - SN 2984J 6145E22 T03 SN 3591J oPN NDE DESPRIPRA 080 VT CHANNEL HEAD BOWL 554 200 VT W-X PRIMARY NOZZLE TIE IN AREA 555 240 VT W-Z PRIMARY NOZZLE TIE IN AREA 556 260 VT Y-Z PRIMARY MANWAY TIE IN AREA 557 300 VT X-Y PRIMARY MANWAY TIE IN AREA 558 340 VT Y-Z PRIMARY MANWAY TIE IN AREA (1ST LAYER) 559 350 VT X-Y PRIMARY MANWAY TIE IN AREA (1ST LAYER) 560 365 VT W-X PRIMARY NOZZLE TIE IN AREA (I ST LAYER) 561 O 380 VT W-Z PRIMARY NOZZLE TIE IN AREA (1ST LAYER) 562 SCE&G - V.C. SUMMER SGR PROJ; P.O,: Q594687 PAGE cf-"&3

Wm- Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:l1 S/0 No Drawing lItem Sub DR SN/LotJOpr.No. IW-HT Code/Ident..

Number Inspected Number Rejected MDRNo. Ref.R go.-

6)o ROUTING DESCRIPTION I JOINT/SEAM IDENTIFICATION iLEVEL 1I INSPECTOR INSPECTION DATE STAMP

()weld ( )Wdid Prep 00-Tase Metal ()Root Pass II

( )Backgouge ( )Other:

VISUAL AIDS USED= kNONE [ J HOILESCOPE ( ] CAMERA MIRROR [ ] TELESCOPE [ ] FIBER OPTICS IMAGNIFYING LENS Power LIGHTING: J-rNATURAL [ FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

I 1 ' ,,

F8629 - l 01 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594887 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:11 Sf0 NO Drawing item 1Sub DR SN/LotI Opn.No. -2T Code/ident.

121501 6145E2-2 I T03 101 N/A 13591J3 200 1 NIA Number Inspected INumber Rejectedl MDR No. Ref. MDR Na.

01 00 I N/A N/A ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CH *OWL CL CLFANLINESS OF W-X NOZZLE TIE IN AREA ONLY INSPECTOR DATE LEVEL II STAMP J.E. AINSLEY 03/30/93

( )Weld ( )Weld Prep (X)Base Metal ( )Root Pass

( )Backgouge ( )Other:

VISUAL AIDS USED: [ XJ NONE ( I BORESCOPE [ CAMERA

[ MIRROR ] TELESCOPE T [ ] FIBER OPTICS I ]MAGNIFYING LENS Power LIGHTING: ] NATURAL N [ ] FLASH LIGHT [X] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S): N/A

,P-IZCD . DATE:

F8629 - OD' SCE&G-V.0. SUMMER SGR PROJ: P.O.: 0594687 PAGE J-ýZ -

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:11 SCE&G - V.C. SUMMER SGR PAOJ; P.O.: 05946ST PAGE______

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORK QIP 8629 REV: 1i S/O No Drawing Item Sub DR SN/Lot Opx.No.IW--HT Code/Ident.

.. . .  :: 4; ýr- . . . 1 -, r x//-,51, _ - . - i -

Number Inspected Number Rejeced MDR No. Ref. NDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENT ICArION C/-/. /-'" s,, - ,, _ !_.- _" _

!LEVEL II INIPE9OR INSPECTION DATE STAMP (O-KWeld ( )Weld Prep ()Base Metal ( )Root Pass C )Backgouge ( )Other: .

VISUAL AIDS USED: I>' NONE [ ] BORESCOPE [ 3 CAMERA

[ MIRROR E ] TELESCOPE [ FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [p<] NATURAL [ I FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

0 APPROVED: DATE: ..

F8629 - O0%

SCE&G - V.C. SUMMER SGR PROJ; PO..1 0594687 PAGE .. 3* f

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:ii S/O No Drawing Item Sub DR SN/Lot 0pn.No. W-HT Code/Ident.

/10.* 6/ 4-. 7-0J *f /Sz) .r, 2 Number Inspected Number Rejected MDR NO. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION INSPECTOR DATE LEVEL IX STAMP 04/06/93 (g)Weld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other:._ __ ___,

VISUAL AIDS USED: [K] NONE MIRROR

[ BORESCOPE

[ I TELESCOPE I[ ] CAMERA FIBER OPTICS

[ I MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [X21 FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

6APPROVED: DATE P8629 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594*87 PAGE k

J SCE&G - SG3L1 2148 LOWER ASSEMBLY COMPLETE - SN 2984J.

6145E22 G0.,,,SN 3591J OPN NDE DESCRIPT7O PA!E 289 UT CHANNEL HEAD BOWL, NOZZLE AND MANWAY CLADDING 564 295 PT CHANNEL HEAD BOWL. NOZZLE AND MANWAY CLADDING 569 317 PT CHANNEL HEAD NOZZLE WELD PREPS AND MANWAY 571 FACE CLAD 325 MT GROUND AREAS 574 AFTER POST WELD HEAT TREAT 390 MT THERMOCOUPLE REMOVAL AREAS 575 395 PT CLAD THERMOCOUPLE REMOVAL AREAS 576 400 PT ALL CLADDING AND SAFE END WELD PREPS 577 520 PT PARTITION PLATE WELD PREP 580 540 VT SAFE END TO W-X NOZZLE TACK WELDS 582 O 610 VT SAFE END TO W-Z NOZZLE TACK WELDS 583 665 RT SAFE END TO W-Z NOZZLE WELD 584 670 RT SAFE END TO W-Z NOZZLE WELD 586 704 VT CLOSURE RING WELDS 587 705 PT CLOSURE RING WELDS 588 725 VT PARTITION PLATE TO CHANNEL HEAD TACK WELDS 589 837 VT PARTITION PLATE TO CHANNEL HEAD WELD 591 840 PT PARTITION PLATE TO CHANNEL HEAD WELD 594 842 UT CLADDING UNDER PARTITION PLATE 597 855 VT SAFE END TO W-X NOZZLE WELD 598 856 PT SAFE END TOF W-X NOZZLE WELD 599 873 VT SAFE END TO W-Z NOZZLE WELD 600 875 PT SAFE END TOF W-Z NOZZLE WELD 601 879 UT MANWAY GASKET SEATS 602 885 VT MANWAY GASKET SEATS 603 887 PT MANWAY GASKET SEATS 604 890 MT CHANNEL HEAD WELD PREP 606 899 MT PADS AND ALL GROUND AREAS 607 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

'r6 3

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:02 S/0 Nol Drawing Item Sub DR SN/Lot Opn.No. W[-HT Code/Ident.

12150 6145E22 GO1 04 3591J 289 Number Inspected Number Rejected NDR No. Ref. NDR No.

0/690 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD ~ 4

/,V ________

INSPECTOR DATEr 0 LEVEL 11 STAMP B R WISCO-BE IN-PROCESS I REPAIR I ] FINA.L[,4' REPORTABLE INDICATIONS 0 RECORDABLE INDICATIONS* e3 AREA SCANNED .- /c*..- , *Complete Sketch!

FLAW DETECTOR: *ifl4 L) S/N p-.-- CALIBRATION DATE/--

0 LONGITUDINAL 45 60 SENSITIVITY _ _

SWEEP DELAY _ .___.__

SWEEP RANGE5 PULSE POSITION ______ _ _____

REP RATE A, .

SEARCH UNIT:

M/rSERIL NO. ,/--,,'3*

SIZE ,__ __ __. _, _

FREQUENCY 5.O .- # _ _ ___,,

SINGLE/DUAL BATCH NO...

COUPLANT: 6 T- 3Ye*- 6,A -256 HEAT CODE: , o z, ?

CALIBRATION: DATE TIME INITIALS INITIAL

  • CAL. BLOCK Z /1

/

. 0/

L

!i-z

/9*S.4

.*iREF.

REFLECTOR -

SCANNING SENSITIVITY:

"F I-END /4-ý -7 1 -'.-!/," t COMMENTS:

A .$i"X5 u/T,/ .i/'J "9 1APPROVED: DATE P8565 - 00 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE

S Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV= 02 S/O No Drawing Item Sub DR SN/Lot Opn-No. W-HT Code/Ident.

12150 6145E22 G01 04 ,// 359J1 289 ,,/4j Number Inspected Number Rejected NDR No. Ref. MDNo.

ROUTING DESCRIPTION JOINT/SEA. IDENTIFrCATION INSPECTOR DATE LEVEL 1 STAMP' B R WISCOMBE 10/07/93 IN-PROCESS ] REPAIR [ ] FINAL [I4 REPORTABLE INDICATIONS 0.

RECORDABLE INDICATIONS*  ;:

ARE Complete Sketch!

  • CN FLAW DETECTOR: 51o S/N4 .SIN CALIBRATION DATE_,?oy3 0 LONGITUDINAL 45 60 SENSITIVITY /;z SWEEP DELAY ~ 9 SWEEP RANGE ,__"_.._

REP RATE .

SEARCH UNIT:

KFR/F SERIAL NO. A/. ov -0:z SIZE _ _ "" _,

FREQUENCY " ,,9-_

S INGLE/D UAL i

BATCH T.* NO-/

NO -

COUPEANT: /Z-.tl a, . -2Z5 HEAT CODE 0 ,1?0 CALIBRATION: DATE TIME INITIALS INITIAL CAL.BLOCK /-30-1/5 SCANNING SENSITIVITY:

.zz -'zi* I______

I.COMMENS:

1 APPROVED: DATE: ~'~

F8565 - 00 /

PAGE _ ___5_

SCE&G - V.C. SUMMER SGR PRO J; P.O.: Q594687

0 Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLA DING RECORDING FORK QIP 8565 REV:02 S/0 No Drawing 12150 6145E22 Item GOI104 Sub IDR* SN/Lot Opn.No.jW-HT Cod /Ident.

3591J 289 17, Number Inspected Number Rejected MDR No. Ref. NDR o

<91-,

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL ED INSPECTOR DATE LEVEL TI STAMP B R WISCONBE 10/07/93 IN-PROCESS

.REPORTABLE INDICATIONS REPAIR IM £ l FINAL [)

RECORDABLE INDICATIONS*

AREA SCANNED _-.,eZ <ý _) (F--/7/ /2 " - *Complete Sketch!i FLAW DETECTOR: -.-q?,gD S/N -2Z-X/ CALIBRATION DATE /0--<_S 0 LONGITUDINAL 45 60 SENSITIVITY ./D-/4-'/- __

SWEEP DELAY 4 SWEEP RANGE q______

PULSE POSITION  ? 25 I i REP RATE /

MFR/F SERIAL NO SIZE _ _ _ _ __"__

FREQUENCY.*. ,,I- t SINGLE/DUAL 47 L___

BATCH NO./

COUPLANT: 2. -4732~~H[EAT CODE a9cý22t7 CALIBRATION: DATE TI14E INITIALS INITIAL A.______4_____ CAL. BLOCK L-&ý,ý -1,V z

a, -Z22 REF..REFLECTOR 116' Ft34

_ SCANNING SENSITIVITY:

END ZZI COMMENTS: 9 &- ~/~

A P,,'-"*, ,**OVED:---E APPROVED :

  • F DATE : 3D F8565 - 00 SCE&G - V.C. SUMMER SGR PROJ; PFO.: 0594687 PAGE

mwnlý Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565' REV:02 S/O NO Drawing 12150 6145SE22 Item G01 04 Sub 14 DR. SN/Lot Opn.No.

13591J 289 ./1 W--HT Cade/Ident.

Number Inspected Number Rejected MDR No. Ref. MDR No.

£91 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD 7 INSPECTOR DATE LEVEL I1 STAMP B R WISCOMBE 10/11/93 IN-PROCESS 3 REPAIR [ ] FINAL [k)

REPORTABLE INDICATIONS p RECORDABLE INDICATIONS*

AREA SCANNED ' zk- - *. *Complete Sketch!

FLAW DETECTOR: SVg07) S/N i-29-zf CALIBRATION DATE Fo-q'-*

0 LONGITUDINAL 45 60 S SENSITIVITY SWEEP DELAY d~-i4 -4 C.- q4 SWEEP RANGE -5.

PULSE POSITION 5. z ~

REP RATE At SEARCH UNIT:

MFR/F SERIAL NO. A/Y4~A.d SIZE FREQUENCY ~ ~

SINGLE/DUAL BATCH NO./

COUPLANT: ale r~xzN3TIvoS HEAT CODE 096,.e'7 CALIBRATION: DATE TIME INITIAL .-

2L/a; r.

INTALS CAL. BLOCK - -

4L,2 f 01i, k REF.REFLECTOR Yj, FgFf SCANNING SENSITIVITY:

END COMMENTS:

0 APPROVED:

f DATE:

( I F8565 - 00 SCE&O - V.c SUMMER SGSR PROJ; P.O.: 0594687 PAGE 5--7

I Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM CIP 8563 REV:01 S/O No Drawing Item Sub IDR SN/Lot Opn.No. W--T Cod/Ident.

12150 6145E22 G01 04 3591J 289 Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD 71 ________________

INSPECTOR DATE LEVEL II STAMP B R WISCOMBE 10/11/93 1 IN-PROCESS [ ] REPAIR [FINAL [I REPORTABLE INDICATIONS RECORDABLE INDICATIONS

  • AREA SCANNED / " /R0-" ,v *Complete Sketch!

FLAW DETECTOR:. b S/N Z- -- CALIBRATION DATE/--

0 LONGITUDINAL 45 60 " " "

0 SENSITIVITY SWEEP DELAY h*

  • f J SWEEP RANGE PULSE POSITION REP RATE SEARCH UNIT:

MFR/F SERIAL NO.

SIZE FREQUENCY 4s, COD02 SINGLE/DUAL COUPLANT: BEATC NO.

CALIBRATION- DATE TIME INITIALS INITIAL CAL.BLOCK 4-3(9-7

&_'/ H REF. REFLECTOR in,4,

-z 71 SCANNING SENSITIVITY-.

END COMMENTS: ,/

, /45Z -,?',,,,. - ý*f,,, 73 APPROVED:

Apaý, DATE: 5/,/O/f a F8563 00 I

I / /

SCE&G - V.0. SUMMER SGR PROJ; P.O.: Q594687 PAGE_______

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing 1215 16145E22 Item jGo1 104Sub IDR SN/Lot Opn.NO.

3591J 295 IW-HT Code/Ident.

No.Insp. No. Rej. MDR No. Ref. ,DR o. [x] Solvent-Removable ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD el 'zc A /14d'kbvs f,4 INSPECTOR DATE LEVEL II STAMP J K ABERNATHY 10/12/93 _

1A.Weld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other:

MATERIAL MANUFACTURERJ DESIGNATION W HEAT CODE PENETRANT MAGRAFLUX jS EL-HF/S PRE-CLEANER! MAGNAFLUX ISKC-S REMOVER MAGNAFLUX JSKC-S DEVELOPER MAGNAE'LUX 1SKD-S/SKD-S2 Q'T?/

SKETCH OR DESCRIPTION OF INDICATION(S):

JAPPROVED: DATE:

0 F8105 - 02 SCE&G- V.C. SURMMER SGR PROJ: P.O.: C594687 PAGE______

0 Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORK QIP 8105 REV:06 S/O No Drawing Item Sub DR SN/LotjOpn.No. W--T Code/Ident.

12150 6145E22 G01 04 Al 3591J 295 C/I t No..Insp. INo. Rej. MDR No. Ref. MDR No. I[x Solvent-Removable

/ V~4 [x] visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL ED INSPECTOR DATE LEVEL II STAMP J R MCCREA 10/27/93

(>QWeld C )Weld Prep ( )Base Metal ( )Roat Pass

)Backgouge )Other-___

MATERIAL MANUFACTURERI DESIGNATION W HEAT CODE PENETRANT -AGNAFLUX SKL-FF/S ZS/*

0 PRE-CLEANER M'AGNAFLIJX 1SKC-S REMOVER DEVELOPER MAGNAFLUX SEC-S I __ y_______________

1AGNAFLUX SKD-S/S*KD-S2 /E"f"-

SKETCH OR DESCRIPTION OF INDICATION(S):

0 IAPPROVED: -- DATE: / 9.

F8105 - 02 SCE&G -V.C. SUMMER SGR PROJ; P.O.: 0F59468 PAGE 5-76

westingho-use Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORMI QIT 8105 qvREv:06 S;1 NoiDrawing Iltem. i Sub JDR 1SNq/Lot Opn-No~ -HTcpeIe 12150 16145E22 IG01 10 1 14-3591J 1317 1 No.Insp. No- Rej. ZIDR4o- 1Ref-. R No[I [x] Solvent-Removable I '\/fV!t I J(xvisible ROUTING DESCRIPTION I JO"NT/S"EA1 IDENTIFICATION ICHANNEL H~D -7 I -

R YANCY 10/30/93

(--f'el

( wel Prp (J'.se etzal ()Root Passj 0 IPRE-CLEANERII SII MAGNAFLUXI K-

_ 'jEOVER AGNAFLUX SKC-S IDEVELOPER IIMAGNAFLUX I SKD-S/S!KD-S2 ~ Y SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED:, DATE:

F8105 - 02 SCE&G - V.G. SUMMER SGR PROJ: P.O.: 0594687 PAGE S--7(

0 Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORKT QIP 8105 REV:06 S/O NojDrawing item I Sub DR iSN/LotIOpn.No.lW-HT Cade/Ident.

I ' AJI'A LEM 1,9/ J iAj A No .Insp.INo. Rej. NIDR No.- Ref. MR No.1 (x] Solvent-Removable 00I A (x] visible ROUTING DESCRIPTION I JOINT/SEAM IDENTIFICATION ew#AAfw,51_ W~rLS- /AA7Z 66?1/2SZ-U X~ j A- A)(IS INSPECTOR DATE LEVEL II STAMP 10/29/93

()Weld >K Weld Prep KX~ase Mletal (M)oot Passi t

( )Backgouge ( )Other:__

MI&TERIAL 11 ANUFACTURERI DESIGNATION W HEAT CODE PENETRANT i _PAGNAFLUX ISKL-HF/S PRE-CLEANERI MAGNAFLUX SKC-S Ysi REMOVER NIAGNAFLUX SKC-S DEVELOPER KAGNAFLUX SKD-S/SKD-S2 .

SKETCH OR DESCRIPTION OF INDICATION(S): "IA

ýAPPROVED: ~rDATE:(t~c2 S F8105 - 02 0

SCE_&( - V.C. SLIMMER1 SGR PfIOJ-. P.O.: 405SM67 PAGE .- 7

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAM1INATION RECORDING FORM QIP 8820 _REv:03 IS/O NolDrawing Itemm Sub IDR ISN/Lot]Opfl.K0- 1 W-T CadeC ent-ýj No.Insp. I1 No. Rej- I MDR No- fRef1d7; ¶R I No-1 (m) Yoke tx] Dry

.l .I !_"_.

+/-,-_ _._,_,

JOINTI/SW IDENTIFICATION ROUTING DESCRIPTION

.INSPECTOR. J DATE LEVEL II STAMP I10/30/93

~()Weld,*'( )Weld Prep ý)C)Base ýIetal )Root Pass!

J( )Backgouge )Other:_.,,__t___

)

MANUFACTURER:

MfT UNIT: [/] PARKER r I OTHER:_________

I WPP 1-D- NUMBPER: ~- 3,7 -5r/

TEST wEIGHT X.D- NMWfBER, /17-7f-2 POWDER: AGNAFLUX F I OTHER: _ _______

COLOR: RED [ I GRAY f ] BLACK XELLOW OTHER:4 W HEAT CODE *NUER: i','

SKETCH OR DESCRIPTION OF IIfDTCATION((3)t

.- --.- i ,,),

IAPPROVED: . DATE: ///"b-F8820 - 00 - (JRO-SCE&G - V.C. SUMMER SGR F'ROJ: P.O.: 0594687 PAGE ý -/

I

O Westinghouse Pensacola Plant MAGNETIC PARTICLE EXZAINATION RECORDING FORMf QIP 88Z0 REV:03 S/a X011Erawing Iltemf Sub IDR ISN/LotIOpn-No-jW-HT Code/Ident.

12150 1614SE22 IG91 C14 1 44 13591J 1390 1 ~Z NoInsp. No. Rej.f INER No. IRef*. DR No. [x] Yoke Ex] Dry 0 '4 Ix] visible ROUTING DESCRIPTION I JOINT/SEAM IDENTIFICATION CHANNEL HD 1--d 4 Aý (4 ot INSPECTCR DATE i LEVEL II STAMP IJ R MCCUFA I 1/5/93I

( )Weld ( )Weld Prep (X)Base .Metal ( )Root Pass

( )Backcouge ( )Other:__

IMANUFACTURER:

I_

I T UNIT: [ PARKER ] OTHER:

0 WPP I-D. NUMBER:

TEST WEIGHT T-D- .UKBER: -

PCWDER: [ IIAGNAFLUX M] I ] OTHER:

[ I YELLOW [ OTHER:

W HE*AT CODE NUMBER:_--_ ______

PSKETCH CR DESCRIPTION OF INDICATION(T):

II JAPPROVEE: DATE: 1l~

E'8820 - 00 SCE&G - V.C. SUMMER SGR PRCJ; P.O.: 0594687 PAGE. 15-'"J5

0 Westinghouse Pensacola Plant LIQUID PENETRANT EXZAMINATION RECORDING FORN QIP 8105 REV:07 SfI No r raving II te Sub D, //t3IN./.ot1pn..No. IW-r Code/Ident.

121.50 1E14SE22 IG01 104 / , 13 5911 139 No..Insp.Ima. Rej.j MDR No. I Re f, FIDR N7o jj so' I~~)r /4 SlentReiva

//L ( x] Visible IjOINT/SEAfl-IROUTING ICHANNEL HD DESCRIPTION 1P70 fn IDENTIFICATION 47'ý' lliermaeb Le IINSPECTCR DATE LEVEL 11 STAM~P 1W R PHILLIPS 11.105/93

~()weld )Weld Prep (I~ !et-ýýl ()Root Passi l( Backcouge ()Other:____________

IX&TERIAL IHANUFACTURERI DESIGNATION~ w HEAT CODE

---If IPRENCETANRIJ IIAGNAFLUX I

I

- I 7-5 IPREDIOV.ER~ M-AGNAFLtJX SrNC-S /i~

JDEVELOPER U !AGNAFLUX S-71D-S z3KD-5 z____________

SKETCH CR DESCRIPTION OF I!.TDICATION(S):

F8105 - 0 S&- V.C. SUMMER SGR PROJ; P.O.: 0594S87 PAGE-ý17

westinahouse Pensacola Plant LIQUID PENETEANT EXAMINATION RECORDING FORMl QIF 8105 REV:07 S/0 Noiurawing [itema I S-ub DR ISN/Lot10pn..No..W-HT Code/Ident-No. Insp.

12150 16145E22 JGoI 1No- Rej 1- 14 rIDR 1o4. 1 Ref 13591J 1400 1DR No0. (xj Solent-Removable I/ I(] visible ROUTING DESCRIPTION JO*iNT/SEA IDENTIFICATION, CIHANNEL ESD '5.F 4u/e.e/ eA.A-w"1*c'i INSPECTOR DATE LEVEL II STAIMP D E ARRINGTON 1 11/05/93 I I <Weld V7Weld Prep ( )Base ?1eta1 ( )Root Pass1

( )Backqouge ( )Other:__

rIATERIfAL jjrMANUFACTURER1 DESIGNATION w HEAT CODE IPENETRANT MAGNAFLUX SKL-RP,'S 0 iýPRE-CLEIANERiJii IAGNAFLUX ISKC-S IDEVELOPFR RANALU SKD-S/SKD-S2 ____________

SKETCH OR DESCRIPTION OF !NVICATIOY($):

0 APPROVEE:

P8105 - 02 DATE:

SCE&G - V.C. SUMMER SOR PROJ: P.O.: 0594687 PAGE 5-7 -7

0 Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07

,I'ol49 SbV; NoDa3n 6~ Item GcI~~ jSub DRý SN/Lo] p.o 17 4 W-HT Code/Ident.

No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable 011I )/A I [x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION

[lf4kI) ALL. _____AL_

INSPECTOR DATE ] LEVEL II STAMP

-ttit' -cD 0 11/11/93

( )Weld ( )Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge (?qOther: C_/ ___vv____

MATERIAL MANUFACTURERI DESIGNATION W HEAT CODE SKL-HF/S 0 PENETRANT MAGNAFLUX PRE-CLEANER MAGNAFLUX sKC-S Y REMOVER MAGNAFLUX ISKC-S 2j5 DEVELOPER IIMAGNAFLUX _SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

0 1APPROVED: A DATE:

F8105 - 02 SCE&G - V.C- SUMMER~ SGR PROJ; P.O.: 0594587 PAGE 7J'

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 HEV:07 S/o No Drawing 6145E22 Item.

Go0 04Sub DR / , SNLot 14000pf.NoJW-HT I -HT Co /

Co4*/Ident.

1215 No.Isp. No. ERej-I NDR Np. IRef. N NO.1 [x] Solvent-Removable I, N I A-I fx] Visible ROUTING DESCRIPTION JOINT/SHAM IDENTIFICATIO CH1ANNEL aD ~ '7 INSPECTOR DATE LEVEL 11 sTAM J R MCCREA 11/10/93 00Weld ( )Weld Prep ( )Base Metal [ )Root Pass;

)Backgouge ( )Other:

MATERIAL MANUFACTuRER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-.HF/S *S,.

FRE-CLEANERJ MAGNAFLUX__jSEC-S '~"

REMOVER MAGNAFLt3X SKC-S o 5y DEVELOPER MAGNAFLUX J SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

[APPROVED: DATE:////ý/-ý-

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ: P.0- Q594W87 PAGE J_7

S Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 SbN Daing jtm SbID SNLt Opn.0o. W-HT Cade/Ideat-SIO~L No Draw- I em__Sub__I__DR__/__3__L Number Inspected Number Rejected MDR N. Ref. MDR No.

0 , 1 ,t1,C/ ,, ,..

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION INSPECTOR , DATE LEVEL II STAMP i-19'-9 11 -3 1 -  :

( )Weld ( )Weld Prep (B\Hase Metal ( )Root Pass

( )Backgouge ( )Other:

VISUAL AIDS USED: NONE [ ] BORESCOPE [ ] CAMERA

( 'MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ MAGNIFYING LENS Power 0

LIGHTING: [ ] NATURAL [ FLASH LIGHT

  • DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

.AP-ROVED:- DATE:

V F8608 - 00 SCF&G - V.C. SUMMER SGR PROJ: P.O.: Q594687 PAGE ' -

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/0 No Drawing Item Sub DR SN/Lot Opn.No. W-RT Code/Ident.

1,2IV) 1/17/ ~iM - I elefl 1/- / /,2- 9 o ,/

Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION 61.,11 I- i W4 2 .-- &z/,;

INSP*  %, 4 DATE LEVEL II STAMP

_____________/,X- 10 -?13

( )Weld ( )Weld Prep (&Base Metal ( )Root Pass

( )Backgouge ( )Other:_ __ _

VISUAL AIDS USED: f .NONE [ 3 BORESCOPE [ I CAMERA MIRROR [ ] TELESCOPE [ ] FIBER OPTICS 0 [ ] MAGNIFYING LENS Power LIGHTING: NATURAL [ 3 FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

AP??ýOVED: DATE: 2 ' ?*

F8608 - 00 SCE&G- V.C. SLUMMER SGR PROJ; P.O.: ,594687 PAGE -*" -*

@NCD PENSACOLA Sho order No. jj, I- RADIOGRAPHIC INSPECTION RE PORT CH ONENk SUPUE PND, FV, NHGESS- AEhLL~'

t I CASTIN 0 I)P&CLOMENT I I DTRItK  ?.1 ' RLcITP ASEMBNLY NO. @H/C IDEN4TIFEno DRAWINQ NO. ITEM tie COMP. DESECRIPTION OPEN. WEL NO QI 5'%ý e -' y- 1j, -/ TYPE ISOTOPFSS *cUniED Sp0 SIZE EFS91 X-RAY ý ~- Yý2s 192' 60 -21 XLT 16 I 1RIDEUM SVMALT / ~ .'CJX EVM

__M eZ'~

HI E1=1?4 EE(POSU~r TIME OR KRAUS JACC,4gIANCIE LEAD SCREENS ]WELO PROC.11

_ETIONIII 1ENG t MD 14 4 pFRONT'I D.05 I)I THER Ilk, -I'flUECTION OTODHERI*

VillBC:tI1:o- SACX 0-H 4R-4 p USE "WElH TECHNIIQ.UE ,hL TYPE 1AFG. 2 1zRATOENEUN w 0.

~TYPE OF EXPOSLJIEE

--- --- -- -- -- --- -- -- rADANORAMIC CI)OTHER

- - EEC. SH-OT NO. OF EXPOELIRE091

,.-,~-.SET-UP PERS0NNFL & LE VEL 3>-v fAlAOIORA/HV ~SET-UP 0r CHECK ONE-t/ -_,<- ,,e X7 °,,

7-

  • I/ " Ii I I _ - . - - -, _ _ _ _-- A 2-i LU,0 01 FI (SA I14 0 __.. _ _ _ _ _ _

@NCD Level If Date MRNIZR No. Q '*.JinL[ X-Ray R.I.R. Number Is The:

R:Tgt r ate er~

NOTE* BEE QDP FOR Ref. M R No. ( ) In-Process NCD X-Ray AODITIONAL 7 X-Ray Los* No. /Z" /x t SET-UP DATA.

Log No I

-- I-~---.---~-- -~-------. -,

4I~(11-11162213. Rev. 3

SCE&G - V.C. SUMMER SGR PROJ; P.O" Q594687 PAGE

(ýNCD PENSACOLA RADIO CRAPHIC INSPEcriON REPORT LEAD RCRRMNS FRONTTI 1 .00Cr -f 10, (1OTHER BACK: C,.0001' K...>I r4IrTHERL

(.

0 cc 0

737 599 RADXOORAMEC ZUSPEC'2IOw fhCOMb -

DESCRIPTION OF ARFk OR 11WSWDA=T1 SK-TCH APPROED BY AE 7 V. C. SU~MMER PROJECT SAFE: END WELD F"J BACKING 0 LOCAONON LOCA11ON FITGS 4;E NOZLOCKDUP SOWING28 QUADRANT FOG. 4.LAYFF END WEL!O SAM SCE&G - V.0. SUMMER SGR PROJ P.O.: Q594687 PAGE 5_-__ _ _7

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDENG FORN QIP 8608 REV:03 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-ET Code/Ident.

12150 6145E2 G01 04 3591J 704 i Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION CHAHNEL RD, I F.

JOINT/SEAM IDENTIFICATION

, 1). hL!J 6 ./-

LEVEL II INSPECTOR INSPECTION DATE STAMP J K ABERNATHY

(,4Weld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other:

VISUAL AIDS USED: L>< NONE [ ] BORESCOPE t ] CAMERA f MIRROR [ I TELESCOPE [ ] FIBER OPTICS

]AGNIFYING M LENS Power LIGHTING: [ ] NATURAL 1>< FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

P8608 - 01 SOýE&G - V.C.SUMvMSR PR~OJ.P,.0:Q 09488 PAGE- -r

0 Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:08 S/0 No Drawing Item Sub DR, SN/Lot Opn.No. W--T Code/Ident.

12150 6145E22 G01 04 1 2A 3591J 705 A/i/f-No.Insp. No. Rej. MDR NO. Ref. MDR No. [xJ Solvent-Removable 7 1 1 1 [x/]I Visible ROUTING DESCRIPTION CHANNEL ED TIT2 JOINT/SEAM

.~L IDENTIFICATION

?D ~) ~ ~ ~ /~

LEVEL II INSPECTOR I INSPECTION DATE I STAMP cUP"eld ( )Weld Prep ( )Base Metal ( )Root Pass

)B'ackgouge ( )other:-

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE 0 PENETRANT PRE-CLEANER MAGNAFLUX MAGNAFLUX SKL-HF/S, SKL-SP SKC-S REMOVER NAGNAFLUX SKC-S DEVELOPER rAGNAFLUX SKD-S/SKD-S2 _ _ _-_

ISKETCH OR DESCRIPTION OF INDICATION(S):

-7 IAPPROVED: °*1< i",'-tDATE:

0 F8105- 04

-V A

SCZE&G - V.c- SUMMER SGR PROJ: P,0.: Q5W487 PAGE f I.

0 Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 RKV:03 IS/0 No Drawing I1tem Sub DR SN/Lot Opn.No. W-HT Cod VIet 12150 6145E22 GO1 04 3591J 837 d

'Number inspectediI ~~

Number 'I Rejectedi MiDRi No~ Ref. M 0.o-ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD I, TCI LEVEL II INSPECTOR INSPECTION DAVE STAMP K E GIBBS (L419rd JWeld Prep ( )Base Metal

) Root Passi

( )Backgouge )Other: ea Il VISUAL AIDS USED: tfNONE 1 1 BORESCOPE [ ] CAMERA 0 MIRROR-. [ ] TELESCOPE MAGNIFYING LENS I ] FIBER OPTICS Power LIGHTING: [ I NATURAL [(<FLASH LIGHT ( I DROP LIGHT

./

SKETCH OR DESCRIPTION OF INDICATION(S):.,/7 S APPROVED, DATE:

F8608 - 01 SCE&G - V.C. SUMMEF SGR PROJ*, P.O.: 0594687 PAGE _-_-/

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:03 IS/O No Drawing 12150 Item I

G01 Sub DR 1 04 1 ISN/Lot Opn.No..W-HT A [3591J 837 Code/Ident.

umber Inspected Number Rejected MDR No. Ref. MDR No.

IROUTING DESCRIPTION J01T/E IDNIF JCHANNEL RD LEVEL II INSPECTOR INSPECTION DATE l STAMP J K ABERNATHY E;6__________

(Weld ( )Weld Prep(

)Backgouge )

)Other:

)Base Metal ( )Root Pass I

[VISUAL AIDS USED: &LkNONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR t ] TELESCOPE E FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: NATURAL U.1<FLASH LIGHT [ ] DROP LIGHT II ISKETCH OR DESCRIPTION OF INDICATION(S):

I I

F80 -0 t

L AIPPROVED: DATE:

SCE&G - V.C. SUMMER SGR PROJ; PD.:o054697 PAGE

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:08 s/o No Drawing lItem Sub IRIA SN/LotjOpn.No. W-HT Code/Ident.

12150 6145E22 IG01 04 Ve/*_ 3591J 140 No. Insp. No. Rej.I MD Ref. . [x] Solvent-Removable 7 , x[x] Visible ROUTING DESCRIPTION JOINT/SEAK IDENTI ICATION CHANNEL RD f V=

LEVEL II INSPECTOR INSPECTION DATE STAMP iK E GIBBS

('*eld ( )Weld Prep

____ ____I

( )Base Metal ( )Root Passj 1~)

C )Backgouge ]Other:__

)

MATE.IA MANUFACTURERI DESIGNATION _WHEAT CODE 0 PENETRANT PRE-CLEANER, KAGNAFLUX P[AGNAFLUX SKL.-HF/S, SKL-SP SKC-S I _ _ _/

i J____________

REMOVER XAGNAFrJUX SKC-.S -

ýDEVELOPER IIMAGNAFLUX 1SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

LAPPROVED: -

0

  • DATE:

4-/

F810S - 04 SCE&G - V.0. SUMMER SGR PROJ. P.O.: Q594687 PAGE 6-2 Y,

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:08 12150 S/O.No 614SE22 Drawing G01.

Item 14 rSub DRý SN/Lot 840 3591J A,0 Opn.No. W-HT Code/Ident-No. Insp. iNo.Rej.M DR No. IRef. MDR No. [x) Solvent-Removable I 0/1 1e9 -~~ I[xl Visible

[ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION ICHANNEL HD j~Ae Ar~V- ~

LEVEL II INSPECTOR INSPECTION DATE 'iTAMP

[J K A13tERNATHYJ____________

(ýýWeld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other:___ _ _

MATERIAL I MANUFACTURERi DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL,-HF/S, SKL-SIP PRE-CLEANER MAGNAFLUX I SKC-S 1571 o

REMOVER MAGNAFLUX SKC.-S DEVELOPER MAGNAFLUX SKD-S/SXD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

'A DT 0

APPROVD: DAT :

F8105 - 04 SCE&G --V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE_ _ _ _

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:03 S/O No Drawing ITem Sub 12150 6145E22 G01_ 04 Number Inspected INumber ROUTING DESCRIPTION JOINT/SEAM ID TIFICION CHANNEL HD LEVEL 11 INSPECTOR INSPECTl DA STAMP K E GIBBSI 6-.-3--9a (ZW*ld ( )Weld Prep (ts-ae Metal ( )Root Passi

)Backgouge ( )Other:_

VISUAL AIDS USEDM: ['-<-ONE I I BORESCOPE [ CAMERA I I MIRROR [ ] TELESCOPE [ ] FIBER OPTICS 0 MAGNIFYING LENS Power LIGHTING: [ NATURAL [EI1LASH LIGHT I I DROP LIGHT

/ 1/4 SKETCH OR DESCRIPTION OF INDICATION(S):

-1 APPROVED: DATE:

F8608 - 01 SCE&Gv.C SO& CSummEýR sGR pROJ; P.O.: 0594687 PAGE

0 Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:08 S/O No Daig 2106145E22 No.Insp.

IG0l No. Rej.

ýr Itema I

MDR N sub 04 Re.

DR SN/Lot Opn.No.

35911 No.

856 N-HT Ode/Ident.

[x] Solvent-Removable ROUTING DESCRIPTION JOINT/SEAM IDENkIFICATZON CELANNEL HD PeL LEVEL I1 INSPECTOR INSP CTION DATE STAMP IKE GIBBS Z--4I (UYeld ( )Weld Prep (A-1-ase Metal C )Root Pass[

( )Backgouge ( )Other:

MATERIAL MANUFACTURER DESIGNATION W HFEAT CODE PENETRAN T 1AGNAFLUX SKL-HF/S,SKL-SP -.

PRE-CLEAKER* MAGNAFLUX SKC-S ._5/  !

REMOVER KAGNAFLUX *1-91 DEVELOPER DIAGNAFLUX SKC-S Kb'5 I SKETCH OR DESCRIPTION OF INDICATION(S):

A11 3 -

APPROVED: DATE:

P8105 - 04. F Sor-&G -V.0. SUMMER SGR PROJ; P.O.: Q59 4W7 PAGE

Westinghouse Pensacola Plant VISUAL EXANINATION RECORDING FORK QIP 8608 REV:02 I

S/O No Drawing Item Sub IDR ISN/Lot Opn..NoJ W-HT Code/Ident.

12150 614SE22 G01 04 1,1 3591J 1873 1 vA Number Inspected JNumber Rejected MDR No. Ref. MDR No.

Q/ /0 1IAI AJ(/ 4 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD PJ- Z- A ve p INSPECTOR DATE LEVEL II STAMP K J EDMONDS 03/14/94 A

C>JWeld ( )Weld Prep ý/Base Metal ( )Root Pass

( )Backgouge ( )Other: H/,,+

VISUAL AIDS USED: 14NONE [ ] BORESCOPE [ ] CAMERA

[IMIRROa [ ] TELESCOPE ( I FIBER OPTICS LIGHTING:

]AGNIFYING M

[ I NATURAL 1>4 LENS FLASH LIGHT Power

[ I DROP LIGHT

  • 1 Ii SKETCH OR DESCRIPTION OF INDICATION(S): -4

~1

.4

.1 41

.44 I

APPROVED: . kDATE: 3 ~54 F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE

westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORK QIP 8105 REV:07 S/0 No IDrawing Item Sub IDR SN/Lot Opn.NNo.W-HT Code/Ident.

12150 6145E22 G01 04 /, 3591J 875 No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable

,0/ AJ [xl Visible ROUTING DESCRIPTION JOINT/SEAN IDENTIFICATION CHANNEL HD W 0 go - A S-CE c-W,6 X b. IJ INSPECTOR DATE LEVEL II STAMP K J EDMONDS 03/14/94 MWeld ( )Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge ( )Other: F/A

-/A MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETR*NT MAGNAFLUX SKL-HF/S -f PRE-CLEANER MAGNAFLUX SKC-S REMOVER iMAGNAFLUXf SKC-S DEVELOPER

.AGNAFLUx _S-S/SKD-S2 #?S6/

SKETCH OR DESCRIPTION OF INDICATION(S):

0am

ý0 )',72O' ~~~~~<

APPROVED: Z \k~zDATE:?.2y F8105 - 02 scEaG- V.c. SUMMER SGR PROJ: P.O.: Q594687 PAGE ,,

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORK QIP 8820 REV:03 S/O No Drawing Item Sub DR SM/Lot Opn.No. W-HT Code/Ident.

12150 6145E22 G01 04 /61 3591J 890 No.Insp. No. Rej. MDR No.. Ref.. MDR No. [xI Yoke Ix] Dry W[xJ Visible ROUTING DESCRIPTION JOINT/SEAM TD7 ICATION CHLANNEL ED 41 I INSPECTOR DATE .LVLII STAMP R GUSS 02/21/94

( )Weld ">Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge ( )Other:

MANUFACTURER:

MT UNIT: 1 PARKER I ] OTHER:

WPP I.D. NUMBER:____________

'TEST WEXGHT X.D - NUMBER:____________

POWDER: NAGN&FLUX [ I OTHER:

COLOR: 1 RED [ I GRAX [ 3BLACK

[ YELLOW I OT*ER:__

I W HEAT CODE NUMBER:_______________

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: \_ZATE: Z_

  • F8820 - 00 SGE&G - V.0. SUMM~ER SGR PROJ;, P.O.: 0594687 PAGE 6~0 ý

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:04 12150 6145E22 S/O No Drawing G0l1 Item 04 Sub 1D* '/I3591J 1899 I ,v/

jSN/Tot Opn.Na. W-HT6de/Ident-

/

No.Insp. No. / c? MDR Rej. No, Ref. MR No. txj visible

[xj Yoke [xl Dry ROUTING DESCRIPTION JOINT/SEAM IDENUIFICATION CHANNEL HD I-IM-) _______

LEVEL II INSPECTOR INSPECTION DATE STAMP J H SHERWOOD ,

( )Weld ( )Weld Prep ( )Base Metal )Root Pass M

( )Backgouge ( aOther:

MANUFACTURER:

MT UNIT: V] PARKER F I OTHER:

WPP I.D. NUMBER: P-?Z-z-TEST WEIGHT I.D. NUMBER: A'-3-.

POWDER: ]AGNAFLUX* , I OTHER:

COLOR: V11 RED ] GRAY [ ] BLACK E I YELLOW LIOTHER:

W HEAT CODE NUMBER: kOZ7 SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: \4DATE: ~pc4 F8820 - 01 SCE&G - V.C. SUMMER SGF PROJ; P.0- 0594687 PAGE ( 0 "7

SCE&G - SG3L1 2148 LOWER ASSEMBLY COMPLETE - SN 2984J 9742D06 H01 (RY17. RY18)

Q0P0 NDP DEMCRIED E AF 030 PT MACHINED SURFACES 884 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE _ _" _73

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 SO No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/ident.

12150 9742D06 H01 102 00001 j030 No.Insp. No. RejI MDR No. Ref. MDR No. [xi Solvent-Removable

/ : 0 1 A I

  • I [x] Visible ROUTING DESCRIPTION JOINT/SEAM JDENTIFICATION SAFE END M e-INSPECTOR DATE LEVEL II STAMP F G CTURRAN 10/11/93 /

)Weld ( )Weld Prep )Base Metal ()Root Pass

)Backgouge (A)Other: , I*4' MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S 27 J /*

PRE-CLEANER MAGNAFLUX SKC-S -

REMOVER I MAGNAFLUX SKC-S SDEVELOPER MAGNAFLUX SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

JAPPROVED: ,_,,. DATE:/,

F810S - 02 SCE&G - V.C. SUMMER SGR PROJ. P.O.' 0594687 PAGE_

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM¶ QIP 8105 REV:07 S/0 No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12150 9742Do6 Hol 02 00002 030 No. Insp. No. Rej. No. Ref.-lDR No. (xI Solvent-Removable

/ .)

I A a-[x] visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION SAFE END M INSPECTOR DATE LEVEL II STAMP W R PHILLIPS 12/03/93 !_ 7

( )Weld ( )Weld Prep (>QBase .Metal f )Root Pass)

( )Backgouge ( )Other:__ __

MAEIL MANUFACTURER DESIGNATIOIU W HEAT CODE PENETRANT MAGNAFLUX SKL-HF,'S PRE-CLEANERI MAGNAFLUX SKC-SI 1/5 REOVER MAGNAFLUX SKC-S DEVELOPER 11IMAGNAFLUX ISKD-S,/SKD-7S 2 T i SKETCH OR DESCRIPTION OF INDICATOIN(5. :

APPROVED

- ~

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

SCE&G - SG3L 12149 LOWER ASSEMBLY COMPLETE - SN 2985J FINAL NDE/INSPECTION REPORTS HOU77NG DESCRIEH PAiE 6145EZZ TO1 CHANNEL HEAD NOZZLE & MANWAY BUTTERING 642 6145E22 T02 CHANNEL HEAD BORE CLADDING 649 6145E22 T03 CHANNEL HEAD BOWL CLAD 654 6145E22 G01 CHANNEL HEAD 664 6145E39 G02 PLUG ASSEMBLY (2) 712 6145E71 G01 AVB ASSEMBLY 715 6145E85 G01 LOWER ASSEMBLY COMPLETE 803 9741 D82 G01 AVB END CAP ASSEMBLY 834 9742D06 H01 SAFE END MACHINING (2) 837 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE i */

SCE&G - SG3L 12149 LOWER ASSEMBLY COMPLETE - SN 2985J 6-145E22 T01....SN 3589

-QP ME DESRIPPAG 020 MT PRIMARY NOZZLE BUILD UP AREAS 643 045 VT W-X PRIMARY NOZZLE BUILD UP AREA 644 225 VT W-Z PRIMARY NOZZLE BUILD UP AREA 645 410 VT Y-Z PRIMARY MANWAY BUILD UP AREA 646 455 VT Y-X PRIMARY MANWAY BUILD UP AREA 647 630 PT PRIMARY NOZZLE MACHINING AND BUILD UPS (ID & OD) 648 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594W87 PAGE / 0"

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 I IT01 01 /A

,I/I 3589J 020 No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Yoke [xI Dry 1 1 I/ WAo I I/A ([x Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CH N&MW BU *16--Z(.. r- C__-

INSPECTOR DATE LEVEL II STAMP W-L ANDREWS 02/02/93 J_ 3

(.)Weld ( )Weld Prep ()Base Metal ( )Root Pass

(.)Backgouge ( )Other:

MANUFACTURER:

MT UNIT: [)(j PARKER [ ] OTHER:

WPP I.D. NUMBER: R~3-3 TEST WEIGHT I.D. NUMBER: R_ _ _ _

POWDER: Q4 MAGNAFLUX [ ] OTHER:

COLOR: [A RED [ ] GRAY [ ] BLACK H YELLOW [_] OTHER:

W HEAT CODE NUMBER: -0 SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: - DATE:

F8820 - 00 SCE&G - V.C. SUMMER SGR PROJ. P0O. 0594687 PAGE-

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REvir0 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Cod /Ident.

Number Inspected Number Rejected MDR No. Ref. MPR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFTCATION

,V/.N'#',,J Sc) a) X*,'/4jo.NLz* Z*LhL.. C/" ,A,1 LE

  • II INSPE)TOR INSPECTION DATE STAMP

( )Wed ( )Weld Prep (ý<Base Metal ( )Root Pass

( )Backgouge ( )Other:

VISUAL AIDS USED:

  • NONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: [ 3 NATURAL [ ] FLASH LIGHT [X< DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

DATE:' -

SCE&G - V.C. SUMMER SGR PROJ; P0O.: Q594687 PAGE 44

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM 9-QIP 8608 REV-.j(O iS/Oi SO No *~ z Item No Drawing Dr/i Ite Sub DR 3SN/Lot1

  • z Y? Opn.No. A44 W-HT Code/Ident.

Number Inspected Number Rejected MDR No. Ref. MDR No.

0/ 1 0WA 1 W4 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION 614IV#FA/,fY 9t) 7&-~&Alf4k V OZ/62UrZ9d/1.0 p e LEVELý INSPECTOR INSPECTION DATE STA1W

( weld ( -d'P e (4ase Metal ()Root Ps

( Backgoug ( )O er:Pas 12cg ,

VISUAL AIDS USED: [ ] NONE [ ] BORESCOPE [ ] CAMERA

] MIRROR M [ ] TELESCOPE [ ] FIBER OPTICS

] MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [-<'/FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: ~DATE:

I I F8608 - 01 SCEG- v.C. SUMMERSG PROo;,P.o.: o59468 PAG (L -

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 T01 01 ,Af 3589J 410 1*7

  • Number Inpected Number Rejected MDR No. Ref. MDR No.

07/ 1 0 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CH N&MW BU II 2'~A.~/

INSPECTOR DATE LEVEL II STAMP R G CURRAN 02/07/93

( )Weld ( )Weld Prep K(Base Metal ( )Root Pass

( )Backgouge ( )Other:

VISUAL AIDS USED: NONE [ ] BORESCOPE [ ] CAMERA MIRROR [ ] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: NATURAL [V/FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:2 F8608 - 00

- V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE

Westinghouse Pensacola'Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S5/ No Drawing Item Sub DR SN/Lot Opn.No. W-HT Core/Ident.

12148 6145E22 I T01 101 J 3589J 1 455 1 A Number Inspected Number Rejected MDR No. Ref. MDRNO.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION 0 k1 INSPECTOR DATE LEVEL II STAMP R YANCY 02/04/93 T

( )Weld )Weld Prep (-lbase Metal ( )Root Pass

( )Backgouge ( )Other: __ _ -9_

VISUAL AIDS USED: [ NONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ ] NATURAL *FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:

F8608 - 000 II

ý,,"Eu SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE t/"1 1

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM' QIP 8105 REV:'06 S/O No Drawing Item Sub DR SN/Lot Opn.No. IW-HT Code/Ident.

J119.14 I 5E I I 1 01 Ii)*

j-")I I<Base Metal ( )Root Pass

)Backgouge ( )Other: Al//

VISUAL AIDS USED:. NONE [ ] BORESCOPE [ ] CAMERA

[ MIRROR E ] TELESCOPE [ ] FIBER OPTICS

[ MAGNIFYING LENS Power LIGHTING: [ ] NATURAL V FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

/J/?,

DATE:

SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE .

SCE&G - SG3L 12149 LOWER ASSEMBLY COMPLETE - SN 2985J 6145E22 T03 SN 3589J OPN NDE DESCREP PAGE 080 VT CHANNEL HEAD BOWL 655 200 VT W-X PRIMARY NOZZLE TIE IN AREA 656 240 VT W-Z PRIMARY NOZZLE TIE IN AREA 657 260 VT Y-Z PRIMARY MANWAY TIE IN AREA 658 300 VT X-Y PRIMARY MANWAY TIE IN AREA 659 340 VT Y-Z PRIMARY MANWAY TIE IN AREA (1ST LAYER) 660 350 VT X-Y PRIMARY MANWAY TIE IN AREA (1ST LAYER) 661 365 VT W-X PRIMARY NOZZLE TIE IN AREA (1ST LAYER) 662 380 VT W-Z PRIMARY NOZZLE TIE IN AREA (1ST LAYER) 663

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV.X,9 .

S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

/1P'/  % ol I/5Z A14 ~359q 67 Number Inspected Number Rejected MDR No. Ref. MDR No.

/ 644 1,W#

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION e1a ;0301AVj. 61 e..65,N4AIL/,WS 61 //A'4/ hOAR

//2 *.

LEVEL PETOR INSPECTION DATE STAMP Weld ( )Weld Prep 'Base Metal ( )Root Pass

)Backgouge ( )Otherl' VISUAL AIDS USED: [ NONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: [ ] NATURAL FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE: o//

F8629 - 01 /

SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE _ _ 5_

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 RtV-1cd'q S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

645ýre z1$v

/1/f4/, I / A1.4 I3hC ZWO M1A Number Inspected Number Rejectedl MDR No. Ref. MDR No.

1 0 W,,A,',f ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION INSPECTOR INSPECTION DATE STAMP LL I _

(-/Weld

)Backgou el( )O er:((-ase p Metal ( ")Root Pass O

1 VISUAL AIDS USED: [ I]NONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [.] FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: ~DATE:~

F8629 - 01 I O SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE _ __ __

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:09 I/ No Drawing Item Sub DR SN/Lot Opn.-No. W-HT Code/Ident.

I-aliM ~1(gEsa"- I TvoN 1~61 1 PA kss89ý "140i 4/

Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION

/SPE tIDATE LEVEL II STAMP

( e)Weld

___________________01/22/93

)Backgouge

( )Weld Prep (

(y)Other:

)Base Metal I7T

( )Root Pass

  • I VISUAL AIDS USED: [M NONE [ J BORESCOPE t ] CAMERA MIRROR [ ] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ ] NATURAL ] FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED:

  • DATE:

F8629 - 00 V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE -

SCE&G -

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM N QIP 8629 REV: '01 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

Number Inspected Number Rejected MDR No. Ref. MDR No.

/ .6 diiv' ROUTING DESCRIPTION JOINT/SEAM IDENTIYICATION 60~ Z;t'WAX 6 L F~AMPAq<£zz XU.-)( _____7_9___4,e6 EVEL IIINSPECTOR INSPECTION DATE STAMP

(>qWeld ( )Weld Prep C~fBase Metal ( )Root Pass

( )Backgouge ( )Other:_ _ _ _ _a__, _ _ 7/___

VISUAL AIDS USED: [I-]NONE [ ] BORESCOPE [ ) CAMERA

( ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: J NATURAL [ ] FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: ... ~ ~ ~DATE: /"6j F8629 - 01 /

SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE & &_

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:09 S/O NO Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12/14'/V.2-22 7-_3I ,-,/ I A//A *5Sl'9JT 0 1 A/A Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION s/i 4 I~v INSPECTR:;X DATE LEVEL II STAMP

_ _ _ __* 01/24/93

( )Weld ( )Weld Prep ( )Base Metal O'lRoot Pass p- 9

( )Backgouge ( )Other:

VISUAL AIDS USED: t4 NONE [ BORESCOPE ( ] CAMERA MIRROR [ ] TELESCOPE [] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [ ] FLASH LIGHT t>4 DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: tý - DATE: /- 9 F8629 -00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

SCE&G - SG3L 12149 LOWER ASSEMBLY COMPLETE - SN 2985J 6145E22 G01 SN 3589J QPN NDE DESCRIPTION PA 289 UT CHANNEL HEAD BOWL, NOZZLE AND MANWAY CLADDING 665 295 PT CHANNEL HEAD BOWL, NOZZLE AND MANWAY CLADDING 673 317 PT CHANNEL HEAD NOZZLE WELD PREPS AND MANWAY 676 FACE CLAD 325 MT GROUND AREAS 677 AFTER POST WELD HEAT TREAT 390 MT THERMOCOUPLE REMOVAL AREAS 678 395 PT CLAD THERMOCOUPLE REMOVAL AREAS 679 400 PT ALL CLADDING AND SAFE END WELD PREPS 680 520 PT PARTITION PLATE WELD PREP 685 540 VT SAFE END TO W-X NOZZLE TACK WELDS 686 610 VT SAFE END TO W-Z NOZZLE TACK WELDS 687 665 RT SAFE END TO W-X NOZZLE WELD 688 670 RT SAFE END TO W-Z NOZZLE WELD 689 704 VT CLOSURE RING WELDS 692 705 PT CLOSURE RING WELDS 693 725 VT PARTITION PLATE TO CHANNEL HEAD TACK WELDS 694 837 VT PARTITION PLATE TO CHANNEL HEAD WELD 696 840 PT PARTITION PLATE TO CHANNEL HEAD WELD 698 842 UT CLADDING UNDER PARTITION PLATE 702 855 VT SAFE END TO W-X NOZZLE WELD 703 856 PT SAFE END TOF W-X NOZZLE WELD 704 873 VT SAFE END TO W-Z NOZZLE WELD 705 875 PT SAFE END TOF W-Z NOZZLE WELD 706 879 UT MANWAY GASKET SEATS 707 885 VT MANWAY GASKET SEATS 708 887 PT MANWAY GASKET SEATS 709 890 MT CHANNEL HEAD WELD PREP 710 899 MT PADS AND ALL GROUND AREAS 711

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:01 S/O No Drawing Item Sub DR SN/Lot Opn.No. IW-HT Code/Ident.

12148 6145E22 G01 102 1 ,3589J 289 /

Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD 1ýF 4 L ________

INSPECTOR DATE LEVEL II STAMP B R WISCOMBE 07/16/93

[IN-PROCESS [ ] REPAIR [ J FINAL REPORTABLE INDICATIONS RECORDABLE INDICATIONS*

AREA SCANNED 2'"'- / *Complete Sketch!

FLAW DETECTOR: 45TOZ) SIN Z29z-3 CALIBRATION DATE7-; 0 LONGITUDINAL 45 60 SENSITIVITY Ar -5*1 SWEEP DELAY ,o/

  • I SWEEP RANGE ,_ __,

PULSE POSITION _ _,___

REP RATE __

SEARCH UNIT:

MFR/F SERIAL NO. __7__ Fr& "

SIZE y" .

FREQUENCY .56.0 __ ___ _

SINGLE/DUAL JLAAL , BATCH COUPLANT: J::c Lo ~ ' HEAT CODE rpq2ýo CALIBRATION: DATE TIME INITIAL S INITIAL 7/114A, CAL.BLO CKCK

-:o-/*

REF. RELECTOR. / f03 SCANNING SENSITIVITY:

ENDTS:

COMMENTS:

APPROVED: DATE:

F8565 - 00 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE 0 5

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:01 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 614sE22 G01 02 Al/l 3589J 289 A/A Number Inspected Number Rejected NDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICTION CHANNEL HD J.6/

INSPECTOR DATE LEVEL II STAMP R GUSS J07/17/93 T_ 1 IN-PROCESS [ 3 REPAIR j ] FINAL EJ.

REPORTABLE INDICATIONS I RECORDABLE INDICATIONS* Aud AREA SCANNED 5,, *Complete Sketch!

FLAW DETECTOR: "SW'V27 S/N 4 -2*g CALIBRATION DATE 7-3 0 LONGITUDINAL 45 60 SENSITIVITY SWEEP DELAY SWEEP RANGE PULSE POSITION REP RATE SEARCH UNIT: .

/ __ __

MFR/F SERIAL NO.

SIZE FREQUENCY SINGLE/DUAL BATCH NO./

COUPLANT: HEAT CODE .022 1/7 CALIBRATION: DATE TIME INITULL.

INITIAL -Z -2 IV.,Q A. CAL-.BLOCK Z.-,SQ -13 REF. REFLECTOR -1yj SCANNING SENSITIVITY:

END Is:ý COMMENTS:

APPROVED: -DATE:

F8565 - 00 "HFON SCE&G - V.C. SUMMER SGR PRO J; P.O.: 0594687 PAGE &GV

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:01 S/O NoiDrawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 02 / 3589J 289 A//A Number Inspected Number Rejectedl MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD C/ _

INSPECTOR _ DATE LEVEL II STAMP R GUSS . 07/17/937 IN-PROCESS [ ] REPAIR [ ] FINAL REPORTABLE INDICATIONS iY34 RECORDABLE INDICATIONS*

AREA SCANNED //9 6 *Complete Sketch!

FLAW DETECTOR: ý- S/N 2, - 2 - CALIBRATION DATE 7- 9-0 LONGITUDINAL 45 60 SENSITIVITY 20-2f___-

SWEEP DELAY SWEEP RANGE PULSE POSITION REP RATE

- ,AL'L !4+/-"

SEARCH UNIT:

MFR/F SERIAL NO.

SIZE .L-2?

FREQUENCY ISINGLE/DUAL BATCH NO./

COUPLANT: HEAT CODE 0 92P d 7 CALIBRATION: DATE TIME INITIALS INITIAL CAL.BLOCK *-J5 -/13 7LL9JL3 0L&- REF. REFLECTOR.-y j SCANNING SENSITIVITY:

END #

COMMENTS:

DATE:-71 F8565 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:01 1

S/O No Drawing Item Sub 12148 6145E22 G01 02 Number Inspected Number Rejected I1 Or I 0 ROUTING DESCRIPTION CHANNEL HD INSPECTOR B R WISCOMBE IN-PROCESS [ I REPAIR REPORTABLE INDICATIONSTI N RECORDABLE INDICATIONS*

AREA SCANNED 1.i *Complete Sketch!

FLAW DETECTOR: vz** S/N .2 8- - . C PALIBRATION DATE 7___ 3!

0 LONGITUDINAL 45 60 SENSITIVITY SWEEP DELAY *./* l SWEEP RANGE PULSE POSITION _ _ _

REP RATE _ A_

SEARCH UNIT:

MFR/F SERIAL NO. <170. 4- -3/

SIZE FREQUENCY SINGLE/DUAL BATCH NO./

COUPLANT: P~~~~6~ i~~

'~ EAT CO0D E ;9'

>?/

CALIBRATION: DAT7 TIME INITIALS INITIAL ~~ /ZIzf  !; , CAL.BLOCK Z-So-/3 REF.REFLECTOR !/x nI4 3 ~ e A SCANNING SENSITIVITY:

END j4!Fý COMMENTS:

APPROVED: "ATE: _ DATE-F8565 - 00 fJROY lltý_

SCE&G - VC. SUMMER SGR PROJ; P.O.: 0594687 PAGE

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:01 I

S/O No Drawing Item Sub 12148 6145E22 G01 02 I I Number Inspected Number Rejectei 0/ 1 O ROUTING DESCRIPTION JOI*/SEAM IDENTIFICATION CHANNEL HD 7A~n

-,/15-5 "'

INSPECTOR DATE L IV/ STAMP B R WISCOMBE 07/18/93 IN-PROCESS [ ] REPAIR [ ] FINAL /

REPORTABLE INDICATIONS RECORDABLE INDICATIPNS* _ 2 AREA SCANNED /F2/;S- s-i Y,/D *Complete Sketchl FLAW DETECTOR: SIT)

S/N CALIBRATION DAT E 0 LONGITUDINAL 45 60 SENSITIVITY _20 - 5 SWEEP DELAY A.O, SWEEP RANGE .

PULSE POSITION ,_,____, ___

REP RATE 19 SEARCH UNIT:

MFR/F SERIAL NO.

SIZE _"______

FREQUENCY *g-_ .___ _. __-___

SINGLE/DUAL BT NO.,

BATCH NO./

COUPLANT: Ed.o 6i CL ,,4D-,.sHEAT CODE 0720/7 CALIBRATION: D3NT TIME INITIALS INITIAL if :OOA1,% CAL-.BLOCK -3*'/&

_ /!.ne

  • REF .RE FLECTOR_
  • SCANNING SENSITIVITY:

END COMMENTS:

APOVED: DATE:7$/Z F8565 - 00 SCE&G - V.C_ SUMMER SGR PROJ; P.O.: 0594687 PAGE G6_  ?

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:01 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 Gol1 02 3589J 289 1 Number Inspected jNumber Rejectedi MDR No. Ref. MDý.No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD ,..ccw#tL j/.4

  • Ab INSPECTOR B R WISCOMBE DATE I LEVEL II 1 STAMP I07/19/931 IN-PROCESS [ ] REPAIR [ ] FINAL REPORTABLE INDICATIONS I RECORDABLE INDICATIONS*

AREA SCANNED -7.). e0&,LEýS *Complete Sketch!

FLAW DETECTOR: 6mWO 0 S/N -.2 - 3 CALIBRATION DATE_____

0 LONGITUDINAL 45 60 SENSITIVITY -

SWEEP DELAY__ _____

SWEEP RANGE 5 PULSE POSITION "?2 REP RATE ________,______

MFR/F SERIAL NO. -/2 "f6 3 SIZE FREQUENCY SINGLE/DUAL COUPLANT: Cý Q& L ooo iroct - HEAT CODE n9i*# 7 CALIBRATION: DATE ,.J TIME INITIALS INITIAL CAL.BLOCK -go-KQ/

C" REF. REFLECTOR Yg 7-Zd/3 700Ae Z,, - SCANNING SENSITIVITY:

END 7219- Ja&: ?OA COMMENTS:

DATE: z Z1 F8565 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE 60 7 /

Westinghouse Pensacola Plant CLADDING THICKNESS MEASUREMENT RECORDING FORM QIP 8563 REV:02 S/O No Drawing Item Sub DR SN/LotIOpn.No.IW-HT Code/Ident.

Number Inspected Number RejWctedj MDR No. Ref. MDR No.

I NI ROUTING DESCRIPTION I MEASUREMENT LOCATION rCViA#JAJL 14CAO C.A-IiA^JAiZ- 14EA 0 C.LAO rHICKI(JSS LEVEL II INSPECTOR INSPECTION DATE STA"P FLAW DETECTOR: TRANSDUCER:

MODEL 5/49 0 MFR'R. AUTvomTTOAJ 8'-O.ST**-.-.

SER. NO. J 4 SIZE/FREQ. Au*" 4 at, A H CALIBRATION  ?-o@-q; COUPLANT MANUFACTURER EC-140o CEL 30 o0 DRAWING NO. 4Il#SE2...

COUPLANT BATCH NO. " *,oi'1 ITEM NO. I CALIBRATION BLOCK ID 310-O-'7 SKETCH: (Include reference points, axes to allow repeatibility of measurements.Only if. cladding does not meet min. reqmnts)

Av A APPROVED: jQDATE: ~7 ~1.

F3158 - 03 0594687 PAGE _ __ __ __

SCE&G - V.C. SUMMER SGR PROJ; P.O.:

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 12148 I 1/0 No Drawing 6145E22 Item G01 02Sub DR N/A SN/Lot Opn.No.

r3589J W-HT Code/Ident-295 N/A No.Insp. No. Rej. MDR No. Ref. MDR No. (x] Solvent-Removable 01 00 N/A N/A (x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD *BOTH NOZZLES AND BOTH MANWAYS ONLY.

INSPECTOR DATE LEVEL II STAMP J E AINSLEY 07/19/93 (x)Weld ( )Weld Prep (X)Base metal ( )Root Pass

)Backgouge ( )Other:

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S RS12 PRE-CLEANER MAGNAFLUX SKC-S RT49 REMOVER MAGNAFLUX SKC-S RT49 DEVELOPER MAGNAFLUX SKD-S/SKD-S2 RT51

  • NOTE: OP# 295 LEFT INPROCESS WITH A SHORT STAMP NOTE ADDED.

SKETCH OR DESCRIPTION OF INDICATION(S):

DATE:

SCE&G - V.C. SUMMER SGR PROJ; P.O." 0594687 PAGE

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No., W-HT Co e/Ident.

12148 16145E22 G01l 02 ,V/fl. 359J29 No.Insp. No. Rej. MDR No. Ref. MDR No.1 (x] Solvent-Removable Al [x] Visible ROUTING DESCRIPTION JOINT/SEAM IDE TIFICATION CHANNEL HD 6t .D. _/SD OA.'l, ISETRDATE -7 F LEVEL II STAMP

  • ILL 07/2 0 0/933

)B*,acgouge

(ý)Weld ()Weld )other:'3*L*)/OWw.,!*,

Prep 4ia~se metal )Root PassI MATERIAL MANUFACTURER I DESIGNATION W HEAT CODE PRE-CLEANER MAGNAFLUX SKC-S REMOVER MAGNAFLUX {_SKC-S

.DEVELOPER ] MAGNAFLUX j SKD-S/SKD-S2 Il/. I ISKETCH OR DESCRIPTION OF INDICATION(S): /'/t

//

F8105 - 02 SCE&G- V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE C 7L

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Co e/Ident.

12148 6145E22 G01 102 3589J 295 M No.Insp. No. Rej. MDR No. Ref. MDR No. (x] Solvent-Removable

/ I ,I / A7 1 I [x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD ./- &, L (:/,Cdl, 4 1 <

INSPECTOR DATE LEVEL II STAMP W R PHILLIPS 07/21/93 (VSWeld ()Weld Prep ()Base Metal ( Roqt Pass

)Backgouge ()Other- c/Azadd MATERIAL MANUFACTURER DESIGNATION IW HEAT CODE PENETRANT KAGNAFLtJX SKL-HF/SWHETCD PRE-CLEANER MAGNAFLUX ISKC-S9 REMOVER MAGNAFLUX SKC-SI_____________

!DEVELOPER M AGNAFLUX ISKD-S/SKD--S2I SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: 4(--,DATE: -zz-cOt F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE (e 75

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM.

QIP 8105 REV:06 5/0 No Drawing Item Sub DR SN/Lot Opn.No.IW-HT Code/Ident.

12148 16145E 1 G01l 02 I A 13589J 317 10 No.Insp. No. Rej. rMDR No. Ref . MDR No. [x] Solvent-Removable

., I LA , 16 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD ~ E~O ~&CLA f INSPECTOR DATE LEVEL II STAMP W L ANDREWS 07/26/93 1 ý11.

( )Weld (X)Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge (N*Other: QAJUýFC MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S RT-so PRE-CLEANER j AGNAFLUX SKC-S RTL49 REMOVER MAGNAFLUX SKC-S RT49 DEVELOPER MAGNAFLUX JSKD-S/SKD-S2_ _ _ _ _ _

SKETCH OR DESCRIPTION OF INDICATION(S):

  • 3seq99q rnDZw zT& 'P tJ Mef 14Jb IcAri0J S d tJ

-- -. 6 MJO ZZ.L. AF7W~

LP-X~ ~ ~ -fo ~ ~~ -E ~ ~

O( 0~ 2EAIL F:.

PC7~T 9""'

,;2 T,4C~CS A1 4//~ 11V,69-li/dICA IUc, .700 o- re At jfs F k yy k / :5

  • i s,'

L4A J fZ /AIV 4~ zý77? Ai 1 4, -3 f ( !H E4 L/ -

JAPPROVED: DATE:  :

F8105 - 02

ý0 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE O 7G'

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 GO1 03 N/A. 31589J 325 No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Yoke [x] Dry

[x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL RD 6200o-~ o0 .I or- CI4~~j1A INSPECTOR DATE LEVEL II STAMP J R MCCREA 08/04/93

( )Weld ( )Weld Prep (JQBase Metal ( )Root Pass

( )Backgouge ( )Other:

MANUFACTURER:

MT UNIT: [CI PARKER [ ] OTHER:

WPP I.D. NUMBER:__ _ __ _ __ _ _

TEST WEIGHT I.D. NUMBERY z-POWDER: [$1 MAGNAFLUX f ] OTHER:

COLOR: IX] RED [ ] GRAY [ ] BLACK

[ ] YELLOW [ J OTHER:

W HEAT CODE NUMBER:_ _ _ _ _ _

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:

F8820 - 00 [R SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594M87 PAGE 7

.1 .

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 03 1 /A' 3589J 390 A/*

NO.Insp. No. Rej. MDR No. Ref. MDR No. [x] Yoke [xI Dry

/ [xl Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD ~ i// ~ _______

INSPECTOR DATE LEVEL II STAMP R E ANTONE 08/24/93

( )Weld ( )Weld Prep (UciBase Metal ( )Root Pass

)Backgouge ( )Other: 77C.

2 /

MANUFACTURER:

MT UNIT: [, PARKER [ I OTHER: /v4 WPP I.D. NUMBER: 34--3 TEST WEIGHT I.D. NUMBER:/

POWDER: [> MAGNAFLUX [ I OTHER:___

COLOR: [2 RED [ ] GRAY [ ] BLACK

[ YELLOW [ ] OTHER: ,4 W HEAT CODE NUMBER: _ _ _ _ _ _

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:

F8820 - 00 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE ' .

- I Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QiP 8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 104 N/A 3589J 395 N/A No.Insp. No. Rej. NDR No. Ref. MDR No. [x] Solvent-Removable 01 00 N/A N/A Ix] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD TC REMOVAL AREAS ON I.D. CLADDING INSPECTOR DATE LEVEL II STAMP J E AINSLEY 09/02/93

(:hWeld ()Weld Prep ()Base Metal ( )Root Pass

)Backgouge ( )Other:

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S RT50 PRE-CLEANER MAGNAFLUX SKC-S RY46 REMOVER MAGNAFLUX SKC-S G DRY46 IDEVELOPER MAGNAFLUX SKD-S/SKD-S2 I RT51 SKETCH OR DESCRIPTION OF INDICATION(S): N/A DATE: f;5 L SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE _ _7___ _

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 04 " 3589J 400 No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable

-. AM [x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD -SAFE a"1 W-'JLJ PROJPS_ ______

INSPECTOR DATE LEVEL II STAMP R BOLLING 08/30/93

( )Weld (rWeld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other: j%'*

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S ýT PRE-CLEANER MAGNAFLUX SKC-S R-1 REMOVER MAGNAFLUX SKC-S k DEVELOPER MAGNAFLUX SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

"00i C,

~4~L DATE:

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE ------- -P

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 12148 6145E22 G01 04 3589J 400 S/O No Drawing Item Sub DR SN/Lot jOpn.No. W-HT Code/Ident.

No.insp. No. R MDR No Ref. MDR N [x] Solvent-Removable I I[x] Visible FROUTING CHANNEL DESCRIPTION HD 1. JOINT/SEAM IDENTIFICATION INSPECTOR DATE LEVEL II STAMP K E GIBBS 08/31/93

( )Weld ( )Weld Prep (L-Y<ase Metal ( )Root Pass

( )Backgouge ( )Other:-

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S RTTSI PRE-CLEANER ,MAGNAFLUX SKC-S REMOVER JIMAGNAFLUX SKC-S X Y DEVELOPER IjMAGNAFLUX SKD-S/SKD--S2_ X~T5/

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED- DATE /

F8105 - 02 P.O.: Q594687 PAGE SCE&G - V.C. SUMMER SGR PROJ:

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 04 , 3589J 400 / 4/#

No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable

0. [xJ visible ROUTING DESCRIPTION JOIN ISEAM IDENTIFICATION I-)X( U* I CHANNEL HD. J'/o .q i. d/ i,/' , /

INSPECTOR DATE LEVEL II STAMP W R PHILLIPS 09/01/93 -

(VfWeld ( )Weld Prep (ViBase Me)ýal ( )Root Pass

)Backgouge ( )Other:*/kiAJ oe/A//

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S PRE-CLEANER jMAGNAFLUX SKC-S REMOVER MAGNAFLUX SKC-S a DEVELOPER 14AGNAFLUX SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:

F8105 - 02 a ýK SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE-

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/0 No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 04 1 3589J 1540 Number Inspected Number Rejected MDR No. Ref. NDR No.

S( 1 A)A/V ROUTING DESCRIPTION JOINT/SEAM IDENTIFICAT ON CHANNEL HD E;g 9__________

INSPECTOR DATE LEVEL II STAMP G A RALLFORD 09/09/93

(,-J'eld ( )Weld Prep (s46 ase Metal ( )Root Pass

)Backgouge ( )Other:

VISUAL AIDS USED: L ] NONE [( BORESCOPE [ ] CAMERA

[j1.<-iIRROR [ I TELESCOPE [ I FIBER OPTICS

[ MAGNIFYING LENS Power LIGHTING: ( ] NATURAL ý*FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: _-DATE: O-c-3 F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 5/0 No Drawing Item Sub DR 12148 16145E22 GO1 04 Number Inspected iNumber

,qj ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD INSPECTOR . DATE LEVEL II STAMP 8 R WISCOMBE 10/22/93

'Weld ( )Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge ( Other: TA 1(4 VISUAL AIDS USED: [ NONE [ ] BORESCOPE [ J CAMERA I ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

]AGNIFYING M LENS Power LIGHTING: [ J NATURAL [ ] FLASH LIGHT DROP LIGHT SKET CH OR DESCRIPTION OF INDICATION(S):

APPROVED: DAE F8608 - 00 0 SCE&G - V.C. SUMMER SGR PRO J; P.O.: 0594687 PAGE 6- 7

WNCD PENSACOLA Shop Order No. /.2/4/ RADIOGRAPHIC INSPECTION REPORT ~F) PageX ~ 1

.L CHECK ONE: SUPPLIER QIP NEV. THICKN . MATERIAL 7-.' *FLE tI CASTING VWELOMENT I I OTHER I C-3 (

CJ Tc.'. ,

ASSEMBLY NO. DETDRAWING N*. ITEM SUB COMP. DESCRIPTION . 0 WELD NO. ,

35~7V 3*2 3S 7-r \& 16 &eI'Lr~l- ý / I I

./ qN ~' 167 eNM e

e.i~-jTYPEW.

SIZE ISOTOPES CURIES SF0 SIZE IFSS1 X-RAY F FF0 MAT`L_-:_

M_____ __ 7SIN .. SIZE &MAIL 31RIDIUM :ZMALT , ,V __ MA , .. j EXPOSURE TIME OR KRADS ACCEPTANCE LEAD SCREENS WELD PROC.#

STANDARDS:

-A4-OTECeTION III (.ING. E ND ItC SCION Vill FRONT: "1 M . n'_ I I OTHER 4- O~~THER HACK: C I .00.-C I .OI0->R.OTHER, iY ________

I 4 S e

  • USE WHEN TECHNIQUE

/

SI FILM:

I0 F VARIATIONS REQUIRE F*

I aU TYPE _f4 MFG.-

iI

< Id w

/ SI 11 I i -j

-C WE REMARKS SIZE -7k_/

NO. OF FILMS - CASST. -L 0~

/

gS 0

5IS Z TYPE OF EXPOSURE:

/7pflANORAMIC f I OTHER u, In kj4.. 1+ 1 __ NO. OF SET-UP I 90' SHOT EXPOSURE(SI PERSONNEL & LEVEL C3 jL4J;- T_ __ _

I RADIOGRA/y4Y SET-UP CHECK ONE:

I I A ----- L9 0~

__ / _ .

,aS w

II C-)

0 U)

NC Lvelllf -

__ _ _ 1-*.

OTHER. (SKETCH)

R.I.R. Number Is The:

RT 1nterpreterl..;.. P~ate IMRN/MR7 No. in al X-Ray NOTE: SEE OIP FOR Q2~a-( Ncp.1I62211. Rev. I L

7 0 0/

R~ef.MRN/MRR No. ( ) In-Process X-Ray I.

NCD X-Ray 12g1!0-"

" :&; ADDITIONAL SET-UP DATA.

I RADIOGRAPHIC INhSPECTION RECOR COMP'ONENT SHOP ORDER 821= NUMBER D ESCRIPTION 'OF AREA OR NWI DRAWINGS $09 ITEM WP EXPOSURE NUMCBER WELDING,, ROCESS QIP NUMBER WEWD SEAN IDENTITY C2 ýý74 4'- ~

SKETCH APPROVED BY '6' DATE V. C. SUMMER PROJEcrT SAFE END WELD FIG. 4: NOZZLE MOCK<UP SHOWING QUADRANT FlG. 4: SAFE END WELD CROSS (I) IF REQUIRED SECTION NOTES SEE PROCEDURE QIP-3288 GUIDELINES FOR LAYOFF OF WELD SEAMS.

SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE 6 Is-17

&NCD PENSACOLA SRt* OI"Eý 1No. ,/g RADIOGRAPHIC INSPECTION REPORT Page /o f_..-

CHECK ONE: SUPPLIER QPO , RVTHICKNESS: .. MATEIA Rloý EICASTING )AWELOMENT [IOTHER  ! TYE X ASSEMBLY NO, HC IoINTIFIE S DRAWING N.. ITEM SUB COMP DESCRIPTION OPER. WELD NO.

/2/i-N A Vd TYPE ISOOPES

, ,SHM

~'*? 3*~X/3 CURIES 24 SFD I

SIZE (FilS)

~ 5I~MEV

/

X-RAY D

MA V!S FFD P

. MIL

-S E &B~

E NIOIIUM 740ALT _______

EIXPOSURE TIME OR KAAOS ACCEPTANCE STANDARDS: ,.=,

VISECTION ,,III ,.,,

IAK o .* LEAD SCREENS OT,,. . ,oo., TE WELD PROC.N (I ND I aE I SECTION VII.I RONT,.. 0 0B O1 I ITHEN 6I OTHER BACK: I-. OO5" H, I.00 '

THEN OVC w *USE WHEN TECHNIQ-UE IM

  • VAR ATI REQUIRE TYPE.E E w 0

vi " ! I *i f - v "" 11 " t!' ,  ! ;. = 11REMARKS NO. OFFILM.S "Z'CSST.--.

" : :' i - "" I t *TYPE OF EXPOSURE:

"---ANORAMIC I I OTHER

, Io90 SHOT No. OF EXPOSUREISI / 0 3-SET-Up

- -- Csad-L PERSONNEL &

2 LEVEL RADIOGRAPHV.SET-UP a-k_1 CHECK ONE:

U) w C,

F - - - - - - - - - - -

0 I I OTHER. (SKIETCHI E

tNCD Level l/ Date MRN/MRR No. R.I.R. Number Is The:

RT Interpreteýý~ Yf-'Final X-Ray NOTE: SEE GIP FOR Ref. MRN/MRR No. In-Process NCD X-Ray ADDITIONAL SET-UP DATA.

X-Ray Log No. -' z.

S('I)-31162211, Rev. 3 1 - ,

I

RADIOGTJIC*Z XNSPM=TZON RCR 00MONENT SHOP ORDER SER.IAL Nb'=QR DESCRIPTIO OF AREA OR E DRA mO

  • iPP EXPOSURE NUMý"R WEWING OS$ QIP NTMBER W LD SEAUM ID ITY 1333?efj sKE--C APPRovED BY _______ _ r/

DATE V. C. SUMMER PROJECT SAFE END WELD FIG. 4: NOZZLE V)CKUP SHOWING QUADRANT fIG. 4: SAFE END WELD CROSS (i) 1F'REQUIRED SECTION NOTES SEE PROCEDURE QIP-3288 GUIDELINES FOR LAYOFF OF WELD SEAMS.

0 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 059487 PAGE_________

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:03 S/O NodDrawing Item Go0 i 04Sub DR

,,V9 ISN/Lot

,358J Opn.No.IW-HT 704 Ivi, Code/Ident-12148 16145E22 I Number Inspected Number Rejected MDR No. Ref. MDR No.

I CROUTING HDESCRIPTION JOINT/SEAM IDENTIFICATION ICHANNEL HDI-LE 4 0-,5,e- ,, . .

LEVEL II IJ E AINSLEY INSPECTOR I INSPECTION DA' 7

[ STAMP

0. o q$

(fWeld )Weld Prep (.ase Metal ( )Root Pass

)Backgouge ( )Other:__

IVISUAL AIDS USED: [4 NONE [ ] BORESCOPE [ ] CAMERA

[ MIRROR [ ] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [ ] FLASH LIGHT [(] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S): AV/*

APPROVED:

k=.DATE: ý-a -ý I-F8608 - 01'@

SCE&G - V.C. SUMMER SGR PROJ; P.O.' 0594687 PAGE

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:08 S/O NoiDrawing Item I Sub DR ISN/LotIOpn.No.IW-HT Code/Ident 12148 16145E22 IV IG01 04 ,13589J 13 89 7O5 170 1 S III I No.Insp. INo. Rej.1 MDR No. lRef. MDR No.] [x[J Solvent-Removable 01 I,~,v/v I[xJVisible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD 0/ a I/

LEVEL II INSPECTOR INSPECTION DATe STAMP J E AINSLEY 0

()(<Weld ( )Weld Prep ()kttase Metal ( )Root Passi

)Backgouge ( )Other: _

MATERIAL IIMANUFACTURER1 DESIGNATION 1W HEAT CODE PENETRANT MAGNAFLUX I SKL-HF/S,SKL-SP S-O 8-PRE-CLEANER FI rNAGNAFLUJX 1-SI(C-SI 1 REMOVER 11 MAGNAFLUX I SKC-S I DEVELOPER AGNAFLUX ISKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):/&//9 APPROVED: ýýDATE:

F8105 - 04 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE _ _ _

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:08 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 04 1//li 3589J 705 1 e/4 No.Insp. No. Rej. MDR o. Ref. M9R No. [x] Solvent-Removable 00 1#',1 1 2/ [x] Visible 1)_

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD - - '

LEVEL IX INSPECTOR INSPECTION DATE STAMP J E AINSLEY____- _ _-_

(Q}Weld ( )Weld Prep ()<Base Metal ( )Root Pass 9

( )Backgouge ( )Other:

MATERIAL MANUFACTURER DESIGNATION fW HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S,SKL-SP Rs PRE-CLEANER MAGNAFLUX SKC-S j REMOVER MAGNAFLUX SKC-S I I?28*

DEVELOPER MAGNAFLUX SKD-S/SKD-S2 I e SKETCH OR DESCRIPTION OF INDICATION(S):/Z///4' APPROVED: DATE:

F8105 - 04 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORK QIP 8608 REV:02 S/O No Drawing Item Sub 1214E8 6145E22 IG01l 04

,A J I Number Inspected Number Rejected 0 / Do ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD N-XAIQZ *?

INSPECTOR B R WISCOMBE 1 DATE 01/29/94 LEVEL 11 STAMIP

, Weld )Weld Prep kBase metal ( )Root ra*ss

)Backgouge ( )Other:

VISUAL AIDS USED: NONE [ ] BORESCOPF ] CAMERA 3I-IRROR [ ] TELESCOPE I I FIBER OPTICS I ZIAGNIFYING LENS - -Power LIGHTING: [ NATURAL 3 FLASH LIG [ DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: *.ATE: -

F8608 - 00 (JCR O SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 S/b 1214 No Drawing 6145E22 item GO0 ISub 04 DR j N/Lo t Opnt-No. W-FT Code/ident.

3589J 856 No.Insp. No- Rej- MDR o Ref. M¶DR No. (xl Solvent-Removable

'141xI visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION £I9-FI* i/Ah*

CHANNEL HID 4?t),62L ,&)2 INSPECTOR DATE LEVEL [ I STAMP B R WISCOMBE 01/29/94 j I

( )Weld ( )Weld Prep ( )Base Metal ( )Root Fossi

( )Backgouge ( )Other:__

MATERIAL I ANUFACTURER T

DESIGNATION 1 w HEAT CODE PENETRANT I MAGNAFLUX I SKL-HF/S

{.

PRE-CLEANER MAGNAFLUX I SKC-S .

REMOVR I ..r;-NAFLUX SKC-S z DEVELOPER H!IA.GNAFLUX tSKD-ýC/=SD-S22I SKETCH OR DESCRIPTION OF TNDICATION(S):

APPROVED:

F8105 - 02 PAGE 70-7 SCE&G - V.C. SUMMER SGR PROJ: P.O.: Q594687 a

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 SIO No Drawing litem Sub

. DR SN/Lot Opn-Ho. W-HTCoqe/Ident.

12148 6145E22 Go01 04 - 13589J 1873 1 A--

Number inspected. Number Rejected MDR,/o. Ref- MDR/No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD A/ ) */ j/i INSPECTOR DATE LEVEL CT STAMP B R WISCOMBE 01/29/94 (Weld ( )Weld( Prep dase Metal )Root Pss kBackgouge ()Other: '~ae.a 10P1~

VISUAL AIDS USED: NONE

" ] BORESCOPE I CAMERA

[>?IIRROR [ ] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ NATURAL N [ ] FLASH LIf;IIT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED:

F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ: P.O.: Q594687 PAGE "_ _ _

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 S/0 No Drawing Item Sub DR 7 SN/Lot Opn.NNo. W-HT Code/Ident.

12148 6145E22 G01 04 1,l._ 35893 1875 I1t No.-Insp. No. Rej. MDR No. IRef. MDR No. [x] Solvent-Removable ixi visible ROUTING DESCRIPTION CHANNEL HD j JOINT/SEAM IDENTIFICATION

,t;Z #v/

WI//-t _5-f 0

INSPECTOR DATE LEVEL IT STAMP B R WISCOMBE 01/31/94 I-Weld ( )Weld Prep (*Base Metal ( )Root Pass 4)10

()wBackgouge ( )Other:

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S PRE-CLEANER REMOVER REMOER M-AGNAFLUX AGNAFLUX I SKC-S SKC-S SKETCH OR DESCRIPTION OF !NDICATION(S):

r,4 KAPPROVED: P\CATE: - c F8105 - 02 0 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O No Drawing Item Sub DR ISN/LotjOpn.No. W-HT Code/Ident.

12148 6145E22 Gol 04 1/* 1 3589J 1890 /

I I No. Insp. No. Rej. MDR No. Ref. MDR No.1 [x] Yoke [xI Dry a i < I [x, Visible ROUTING DESCRIPTION JOINT/SEAM ID NTIFICATION CHANNEL HD Z _________

INSPECTOR DATE LEVEL II STAMP F G CURRAN 01/26/94

( )Weld (V5Weld Prep ( )Base Ketal ( )Root Pass

( )Backgouge ( )Other:

MANUFACTURER:

MT UNIT: [V<"PARKER [ ] OTHER:

WPP I.D. NUMBER:____ ______

TEST WEIGHT I.D. NUMBER: j-3 POWDER: [ ] MAGNAFLUX C I OTHER:

COLOR: [k-4 RED [ ] GRAY [ ] BLACK I I YELLOW [ ] OTHER:

W HEAT CODE NUMBER: __ _ _

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: 0 *DATE: -

F8820 - 00 1647r SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE 7/0

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12148 6145E22 G01 04 A 3589J 899 1A NO.Insp. No. Rej. NDR No. Ref. MDR No. [x] Yoke [x] Dry O0 [ xl] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD. PAA U All !aaA0)e9 INSPECTOR DATE LEVEL II STAMP J A COLLEY 02/07/94

( )Weld ( )Weld Prep ()OBase Metal ( )Root Pass

( )Backgouge ( )Other:

MANUFACTURER:

NT UNIT: [X] PARKER [ ] OTHER:

WPP I.D. NUMBER: ,.

TEST WEIGHT I.D. NUMBER:/* *,3 ,

POWDER: 0)] MAGNAFLUX [ ] OTHER:

COLOR: V9j RED [ " GRAY [ ] BLACK I YELLOW [ ] OTHER:

W HEAT CODE NUMBER: -  %

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: *DATE: _

F8820 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE 7 /f

SCE&G - SG3L 12149 LOWER ASSEMBLY COMPLETE - SN 2985J 9742D06 H01 (RY13. RY16)

MP NMDE DESCRIPTION PAG 030 PT MACHINED SURFACES 838

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No. W--HT Code/Ident.

12149 9742D06 H01 02 1 &100002 030 / e//

No.Insp. -No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable 1,-m I VA/q/i- IfI1 4 (x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION SAFE END M INSPECTOR DATE LEVEL II STAMP F L DAY 08/28/93

)Weld ( eld Prep ase Metal ( )Root Pass

)Backgouge ( )Other:___

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S PRE-CLEANER MAGNAFLUX SKC-S 7 9 REMOVER ?IAGNAFLUX SKC-S R 4 DEVELOPER I4AGNAFLUX SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:

P8105 - 02 C3C.

SCE&G - \/.C. SUMMER SGR PROJ: P.O.: Q594687 PAi

SCE&G - SG3L12150 LOWER ASSEMBLY COMPLETE - SN 2986J FINAL NDE/INSPECTION REPORTS ROUTING Q-EWRCIP TLQ PAGE 6145E22 T01 CHANNEL HEAD NOZZLE & MANWAY BUTTERING 589 6145E22 T02 CHANNEL HEAD BORE CLADDING 598 6145E22 T03 CHANNEL HEAD BOWL CLAD 603 6145E22 G01 CHANNEL HEAD 613 6145E39 G02 PLUG ASSEMBLY (2) 663 6145E71 G01 AVB ASSEMBLY 666 6145E85 G01 LOWER ASSEMBLY COMPLETE 898 9741 D82 G01 AVB END CAP ASSEMBLY 920 9742D06 H01 SAFE END MACHINING (2) 933 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE ' (;*'

SCE&G - SG3L1 2150 LOWER ASSEMBLY COMPLETE - SN 2986J 6145E22 T01 SN 3590J 9PN NDE DESRI&IQ PACE 020 MT PRIMARY NOZZLE BUILD UP AREAS 590 045 VT W-X PRIMARY NOZZLE BUILD UP AREA 591 225 VT W-Z PRIMARY NOZZLE BUILD UP AREA 592 410 VT Y-Z PRIMARY MANWAY BUILD UP AREA 593 455 VT Y-X PRIMARY MANWAY BUILD UP AREA 594 630 PT PRIMARY NOZZLE MACHINING AND BUILD UPS (ID & OD) 595 640 RT PRIMARY NOZZLE BUILD UPS 596 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE 372

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S, NolDrawing jItem 12149 1614SE22 T01 Sub 01 IDR 1 /

ISN/LotOpn.No.1W-HT Code/Ident.

° 1°2° I No.Insp. No. Rej.I MDR No. Ref. MDR No.1 [x] Yoke [x] Dry

/ ___IVA [xi Visible ROUTING- DESCRIPTION JOINT/SEAM IDENTIFICATION CH N&MW BU N .9 1~

INSPECTOR DATE LEVEL II I STAMP R E ANTONE 03/18/93

(.)Weld ( )Weld Prep (OiBaseMetal ( )Root Pass

)Backgouge ( )Other: ,*4 MANUFACTURER:

M7 UNIT: [k PARKER [ ] OTHER:

WPP I.D. NUMBER: A-J2-3 TEST WEIGHT I.D. NUMBER: ,7-3?-J EOWDER: [A MAGNAFLUX [ ] OTHER:_ ___ ___

COLOR: [X] RED I ] GRAY [ ] BLACK

[ YELLOW [ ] OTHER: /V4 W HEAT CODE NUMBER: a/fd SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE: 1 ,I, F8820 - 00 6-~

SCE&G - V.C. SUMMER SGR PROJ: P.O.: Q594687 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/O No Drawing Item Sub DR -SN/Lot Opn.No. W-HT Code/Ident.

!Zzq

  • i  !/il/To * ,, O "/! *.59I 5--o! ///

.i5-Number Inspected Number Rejected MDR No. Ref. MDR No.

,-21 .. 0 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION INSPECTOR/,, DATE LEVEL II ST

)Weld )Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge (KOther: g/qbV!i/c VISUAL AIDS USED: NONE BORESCOPE [ ] CAMERA MIRROR TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: 1 NATURAL FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

F86Q8 - .].,

SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE _ __ __

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:03 5/0 No Drawing IItem Sub DR ISN/Lot Opn.No. W-HT Code/Ident.

/l /--- J 2, " /

Number Inspected iNumber Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION I JOINT/SEAM IDENTIFICATION LEVEL II INSPECTOR I IN(PECTION DATE STAMP

( )Weld ( Prep Base Metal ( )Root Pass

( )Backgouge C )Other:

VISUAL AIDS USED: <NONE [ BORESCOPE [ ] CAMERA

[ ] MIRROR [ TELESCOPE [ ] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: -] NATURAL [ J FLASH LIGHT [,-trDROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

JAPPROVED: DATE: /

F8608 - 01 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE -_ _ _

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/0 No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code Ident.

Number Inspected Number Rejectedl MDR/ o. Ref. MD" No.

ROUTING DESCRIPTION JOINT/SEAM ID NTIFICATION INSPDATE AE LEVEL II STAMP

( )Weld ( )Weld Prep ( 4Base Metal ( )Root Pass

)Backgouge ( )Other:

VISUAL AIDS USED: NONE ] BORESCOPE [ ] CAMERA

[IMIRROR [ ] TELESCOPE [] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ I NATURAL [ 3 FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE : <7?

F8608 - 00 rJRO SCE&G - V.C. SUMMER SGR PROJ: P.O.: Q594687 PAGE

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/0 No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 T 01 3590J 630 No.Insp. No. Rej. MDR No. Ref. MDR No. Ix] Solvent-Removable f ( 00 1 -n r Ix. Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CH N&MW BUI INSPECTOR DATE LEVE II STAMP D E WARD 04/20/93

(ý)Weld ( )Weld Prep ( )Base Metal ( )Root Pass I)Backgouge ( )Other:__ _ _

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S , .

PRE-CLEANER MAGNAFLUX SKC-S REMOVER MAGNAFLUX SKC-S DEVELOPER MAGNAFLUX SKD-S/SKD-S2 trl SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: ) DATE: ;2 5--3 F8105- 01

  • Cz&G- V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE______
  • NCD PENSACOLA 12149 RADIOGRAPHIC INSPECTION REPORT 1 1 Shop Order No.

CH4ECK ONE:SPLE QIP-NO IREV. THICKNESS: AEI CASTING A YnWELOMENT I OTHER 3 5 1/8': TYPE: Cs/INC ASSE HIC IDENTIFIERS DRAWING NO. ITEM SUB COMP. DESCRIPTION OPER. WELD NO I:W-Zf TYPE ASME N/A 6145E22 T01 01 CH N&MW BU 640 WZZLE TYE #50's ISOTOPESCUIS SO SZ F) -A S F A'SS KV N/ N/A~m 192 80 ie& AI IIRIDIUM OOCOBALT 24 20 1/4" .00 .106 - N/______ MA N/A NIA .,/V1V4--

STA NDA RDiS:.

EXPOSURE TIME OR ((RADS ACCEPTANCE LA CEN EDPO.

STAND A SECTION III (]NO - NO SECTION viii No FRONT:

RN:'.055. X 1 .010-[IOTHER

.o"OTR WPS-4532 HR 25 MIN OTHEC BACK 1005-

' 1 .010" X IOTHER .040

_ VI USE WHEN TECHNIQUE FILM:

w VARIATIONS REQUIRE TYET MO!C A IW '. . TYET F.

Su i 'AI t w size SIZ X 17 84y- ;5 -- OW VE M . 1" 9 1 REMARKS NO. OFILMS FCSST.- 20 10

-I - TYPE OF EXPOSURE:

4 - -- - ---- - - -- 1PANORAMIC []OTHER 0 0-1 $2(ISOSHOT C0 NO. OF EXPOSUREISI --.--- ..

1-2 SET-UP PERSONNEL & LEVEL 01 2-3 _ - GENE ANTONE II&J.AINSLEYII '0, 3-4 V-, RADIOORAPHY SET-UP 0 CHECK ONE:

4 --

5-6 VIXi A Z

C) 6-7 7-8 _

8-9 __;.\

00

-Tii I OHER. (SKETCHII 0

9N C Level 11 02 ate MRN/MRkl No. ()FnlXRy R.l.R. Number is *rhe:___

ýr r40 () Fial XRayNOTE: SEE DIP FOR Ref.MRN/MRR No. ()o In-Process NCD X-Ray 62799 ADDITIONAL I i, 4/21/93 N/A X-Ray Log No. SET-UP DATA.

F-NCD-31622H, Rev. 3 -- - - - I-

)NCD PENSACOLA RADIOGRAPHIC INSPECTION REPORT Shop Order No. 12149 Page_*1L of I CHECK ONE ICSTN ELMN I TE SUPPLIER Zr-oREV. THICKNESS:

ASSEMBLY NO. HC IDENTIFIERS DRAWING NO. ITEM CP.

CS m DESCRIPTION OPER. ..

WELD NO.

"-IV " ASx'E N/A 6145E22 T01 01 CH N&MW BU 640 OZZLE TYPE 3590J ISOTOPES CUIES SF0 SIZE IFSSI` X-RAY FSS FF0 ~r SS IIRIOIUM EICODALT 24 20 1/42 1/4" .10

.100 -. .10 106 __ "NI V N/NONE NIAN/ SHIM SIZE ON MArL EXPOSURE TIME OR KRADS ACCEPTANCE LEAD SCREENS WELD PROCl STANDARDS: SECTION III IING ,, ND IX ND FRONT: 11.005" XI.0o0o" I 1OTER WPS-4532 11 I [ SEC5

  • TION Vil 1 11RoN VIIOER BACK: 1 1.005" (1.010-0- OTHER .040 USE WHEN TECHNIQUE FILM:

S 1, TYPE F MFG.EEC T1 bi SIZE 7 X 17

-- -" - ,. _ -- PANORAMIC t ] THER

'0-1 I 101 I]GO'SHOT 1-2 t/" ,/NO. OF" EXPOSUREIS)I.

0 ft

" * "-- *SET-UP PERSO*NNEL & LEVEL 2-3 .[/, 0I1 C. ANTONE & J.AINSLEY TI's 3 -4 I * ' ,j -R A IOGO RAPH Y S ,,T.U,, cc Q)

_ ...- - - " *CHECK ONE:

4-5 1v 01 5-6 -- -- -- -- -- - -- -- -- -- X ,

A C9 7-8 I t... . "O10 P CI O 0

CA)

, N SEETQU P PERORNL&EE 2-3 V~NTE

-=.NLev t .I R/R o ( ia -a I.Nme s"h:~~I .

te 8 ube I Te J.g. .NAINSLE Lee.IMReN/MRR ADDITIONALRI..

4/22/93 NMRR No. ]) In-Process NCD X-Ray 62800 AD

-N/A X-y Log No. SET-UP DATA.

F-NCD-316228, Rev. 3 _.- --- I

SCE&G - SG3L12150 LOWER ASSEMBLY COMPLETE - SN 2986J 6145E22 T02 SN 3590J DPN NDE DESCRIP EA 030 VT W-X PRIMARY NOZZLE BORE 599 103 VT W-Z PRIMARY NOZZLE BORE 600 190 VT Y-Z PRIMARY MANWAY BORE 601 280 VT X-Y PRIMARY MANWAY BORE 602 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE ":-_S #*

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:11 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE 5.Z9

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:1l S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

Number Inspected Number Rejected MDR MD/ o.

Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION ISMCF(DATE LEVEL P

( )Weld ( )Weld Prep pq4ase Metal ( )Root Pass

( )Backgouge ( )Other:

VISUAL AIDS USED: NONE A ] BORESCOPE [ ] CAMERA 11 MIRROR [] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [] FLASH LIGHT DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE:

F8629 - 00 SCE&G - V.0. SUMMER SGR PROJ; P.O.: 0594687 PAGE _ 0__"

SCE&G - SG3L12150 LOWER ASSEMBLY COMPLETE - SN 2986J 6145E22 T03 SN 3590J QM NDE DLESCRIPU( PA6E 080 VT CHANNEL HEAD BOWL 604 200 VT W-X PRIMARY NOZZLE TIE IN AREA 605 240 VT W-Z PRIMARY NOZZLE TIE IN AREA 606 260 VT Y-Z PRIMARY MANWAY TIE IN AREA 607 300 VT X-Y PRIMARY MANWAY TIE IN AREA 608 340 VT Y-Z PRIMARY MANWAY TIE IN AREA (1ST LAYER) 609 350 VT X-Y PRIMARY MANWAY TIE IN AREA (1ST LAYER) 610 365 VT W-X PRIMARY NOZZLE TIE IN AREA (1ST LAYER) 611 380 VT W-Z PRIMARY NOZZLE TIE IN AREA (1ST LAYER) 612 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE c1-2

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV.;-Ad S/O No Drawing Item Sub 1DR SN/Lot Opn.No. W-3 r Code/Ident.

GL2141 6Q1 FS4E To,3 1 q tu/ 3SZ1c~ 686 __ k Number Inspected Number Rejected NDR No. Ref R No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION k044. ol C1c-"" C1. HA,. 8L*)1CI 1l.l,,

INSCTOR DATE LEVEL I I

  • i fl - -- i . ... ]

-T TAMPR

( Wel&, ((jykld Prep (<1Base Metal ()Root Pass

)Bac gouge ()Other:___

(VISUAL AIDS USED: E L-Y NONE IBORESCOPE ZAMERA IMIRROR []TELESCOPE ?IBER OPTICS MAGNIFYING LENS ____Power I LIGHTING: [INATURAL (L.<"FLASH LIGHT IROP LIGHT ISKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: *Q d1.> DATE: cxG(12q F8629 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV 0I° S/O No Drawing Item Sub 1DR SN/Lot Opn.No. w-i r Co e/Ident.

Number Inspected Number Rejected MDR No. Ref MDR No.

70r it ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION INSP CTOR' DATE LEVEL II STAMP 3-t-I

)Weld d(J w~ld Prep ("

)Backgouge( )Other:

3- 0 2-'i3 VISUAL AIDS USED: [- T"NONE [ ] BORESCOPE [ ] AMERA

[ MIRROR [ ] TELESCOPE ] F

?IBER OPTICS MAGNIFYING LENS Power LIGHTING: [ I NATURAL [-,FLASH LIGHT [ I )ROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: 2, DATE: (2eladqt F8629 - 00 /JR0\

SCE&G - V.0. SUMMER SGR PROJ; P.O.: 0594687 PAGE _____,____._.

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:1-1-./e9

,e/wo S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Codc/Ident.

Number Inspected Number Rejected MDR No. Ref. MDR No.

01/ 1 ,91 <-A 1-4/

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CA* /Ao"/I  ::5z.L ._.-. Z- ao 2-, ' ,..

LEVEL II =NSPE OR INSPECTION DATE STAMP

ýf - I?_______Z__?_____

(-Weld ( )Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge ( )Other:___

VISUAL AIDS USED: NONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: [ ] NATURAL ] FLASH LIGHT [I DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: -? q DATE: I /-,,

F8629 - 01 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE______________

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM, QIP 8629 REV:W L S/O No Drawing 1214i (f14IE22 TO3 Item I Sub DR iI SN/Lot Opn.No. W-T r Cooe/Ident.

Number Inspected Number Rejectedl MDR~o Ref MD No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATIOl 4E' e INS)ECTOR DATE LEVEL II

(,j'We ld/, Weld Prep (<Base Metal ( )Root Pass

)Back e ( )Other:__

VISUAL AIDS USED: [V] NONE [ ] BORESCOPE ZAMERA A I MIRROR [ ] TELESCOPE FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ J NATURAL [ FLASH LIGHT [ ] )ROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED:

ýý--0-, Sýýi -

DATE: C) tj.Zc F8629 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE *//

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8629 REV:1-1,/.9 S/0 No Drawing Item f,/9q61Z u/q'A' 0i; Number Inspected Number Rejected 1? 00 1 I

  • i i (

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION LEVEL IR INSPECTION DATE STAMP

)Weld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ()qOther:_ _ _ _ _

VISUAL AIDS USED: [*4 NONE [ ] BORESCOPE [ ] CAMERA

[ ] MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: [ 3 NATURAL 3 FLASH LIGHT I]/DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED:

A i

DATE:: /g

+,IA F8629 - 01 SCE&G - V.C. SUMME OJ; P.O.: 0594687 PAGE  : / '

SCE&G - SG3L12150 LOWER ASSEMBLY COMPLETE - SN 2986J 6145E22 G01 SN 3590J 9RN NDE DE**PU PAE 289 UT CHANNEL HEAD BOWL, NOZZLE AND MANWAY CLADDING. 614 295 PT CHANNEL HEAD BOWL, NOZZLE AND MANWAY CLADDING 618 317 PT CHANNEL HEAD NOZZLE WELD PREPS AND MANWAY 619 FACE CLAD 325 MT GROUND AREAS 620 AFTER POST WELD HEAT TREAT 390 MT THERMOCOUPLE REMOVAL AREAS 621 395 PT CLAD THERMOCOUPLE REMOVAL AREAS 622 400 PT ALL CLADDING AND SAFE END WELD PREPS 623 520 PT PARTITION PLATE WELD PREP 626 540 VT SAFE END TO W-X NOZZLE TACK WELDS 627 610 VT SAFE END TO W-Z NOZZLE TACK WELDS 628 665 RT SAFE END TO W-X NOZZLE WELD 629 670 RT SAFE END TO W-Z NOZZLE WELD 633 704 VT CLOSURE RING WELDS 641 705 PT CLOSURE RING WELDS 642 725 VT PARTITION PLATE TO CHANNEL HEAD TACK WELDS 643 837 VT PARTITION PLATE TO CHANNEL HEAD WELD 644 840 PT PARTITION PLATE TO CHANNEL HEAD WELD 645 842 UT CLADDING UNDER PARTITION PLATE 651 855 VT SAFE END TO W-X NOZZLE WELD 652 856 PT SAFE END TOF W-X NOZZLE WELD 653 873 VT SAFE END TO W-Z NOZZLE WELD 654 875 PT SAFE END TOF W-Z NOZZLE WELD 655 879 UT MANWAY GASKET SEATS 657 885 VT MANWAY GASKET SEATS 658 887 PT MANWAY GASKET SEATS 660 890 MT CHANNEL HEAD WELD PREPS 661 899 MT PADS AND ALL GROUND AREAS 662 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE 6/5

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8563 REV:01 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 16145E22 G01 03 A 3590J 289 A Number Inspected Number Rejected MDR No. Ref. MDR No.

I I D) I -A I -

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD CyA,--_ 4..%f'q/ CLfl/J S -.A r-14-G INSPECTOR DATE LEVEL II STAMP R BOLLING 08/ /93 4 ýd ý>, EPAIR II FINAL [ 4*

IN-PROCESS REPORTABLE INDICATIONS 0 RECORDABLE INDICATIONS* )

AREA SCANNED bo- - *Complete Sketch!

FLAW DETECTOR: 5M1o,0 S/N A.'L- CALIBRATION DATE-7**

0 LONGITUDINAL 45 60 SENSITIVITY '.f2g- F.0 7 SWEEP DELAY S- o SWEEP RANGE ,.s-PULSE POSITION _T.7 _ .-A__

REP RATE 11 SEARCH UNIT:

MFR/F SERIAL NO. -

SIZE _'.) , .

FREQUENCY ." i H P SINGLE/DUAL _______T____/

COUPLANT: ECH-o C,FL_ 3 HEAT CODE "o1-ta.

CALIBRATION: DATE TIME INITIALS INITIAL -Sf' S-? ___..,5 t*!S- CAL.BLOCK L.34-1

    • C- )) o ___-_ REF.REFLECTORt*Lo DJ-ý

. /SCANNING SENSITIVITY:

END -L- ___________________ e3 COMMENTS:

,Iva APPROVED: d-Q],ATE, 3~

F8563 00

.0 SCE&G - V.C. SUMMER SGR PROJ; P.O,: 0594687 PAGE /

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:02 pkue .'. / 04 -_

S/O No Drawing Item Sub IDR SN/LotlOpn.No. W-HT Code/Ident.

12149 6145E22 G01 03 1 -A 3590J 1289 A Number Inspected Number Rejected MDR No. Ref. MDR No.

I 10 ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD _ i.,' CL,__

INSPECTOR DATE LEVEL II STAMP R BOLLING 08/27/93 IN-PROCESS ( I REPAIR f ] FINAL [&. 1 REPORTABLE INDICATIONS _

RECORDABLE INDICATIONS* o AREA SCANNED CitA-ý,.)_ p& O LJ$ . /,A-'tO1L-C t.O. *Complete Sketch!

FLAW DETECTOR: Ma19 6 S/N L-. *-1 CALIBRATION DATE -'.9 0 LONGITUDINAL 45 60 SENSITIVITY go- - aa SWEEP DELAY S_,_

SWEEP RANGE _ S,_-_

PULSE POSITION Er.____A REP RATE - I SEARCH UNIT:

MFR/F SERIAL NO.

SIZE FREQUENCY SINGLE/DUAL LSu,G7H t COUPLANT: 0e~2.O,.7 CALIBRATION: DATE TIME INITIALS INITIAL Ae CAL.BLOCK L.2a-/.

L.*.IL REF. REFLECTOR kj"0 P&':

2.)S'i g.24.g SCANNING SENSITIVITY:

END 4 (, A6L COMMENTS:

APPROVED: f4QýDATE:

L'ODO3 - UU SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE_ ____

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:02 S/O No Drawing Item Sub DR SN/LotiOpn.No. W-HT Code/Ident.

12149 6145E22 G01 03 1 3590J 1289 Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION I JOINT/SEAM IDENTIFICATION CHANNEL HD I c~- .,. f.e -,) cxL,)

INSPECTOR DATE LEVEL II STAMP R BOLLING f_08/27/93 ye5 IN-PROCESS [ ] REPAIR [ ] FINAL ['

REPORTABLE INDICATIONS 0 RECORDABLE INDICATIONS* 0 AREA SCANNED 61."a( r*

T,... X7,- *Complete Sketch!

FLAW DETECTOR: Srl 0 S/N L-,.g-' CALIBRATION DATE 2.'.93 0 LONGI-TUDINA 45 6 SENSITIVITY L-0 - .o SWEEP DELAY _ , __

SWEEP RANGE , -

PULSE POSITION __._ AA_____

REP RATE H SEARCH UNIT:

MFR/F SERIAL NO. C0Vf 61 SIZE 1__2'"d, _

FREQUENCY -T,0,7 N___

SINGLE/DUAL 0,,-4L rBATCH Npý COUPLANT: " (-M 3o CODE 092.017 CALIBRATION: DATE TIME INITIALS INITIAL 9.)-.5J "i'f-r" 'A- CAL.BLOCK L.-o-/*

REF.REFLECTOR I/jr"O F4i-f SCANNING SENSITIVITY:

END V. t'j/" Z3 Z 4-COMMENTS:

I F8565 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE /' /6

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF CLADDING RECORDING FORM QIP 8565 REV:02 S/O No Drawing Item Sub jDR SN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 G01 03 1 3590J 289 1 Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD CHNA - L /4'ze I (lc -/' _-_r)

INSPECTOR R BOLLING IN-PROCESS [ ] REPAIR [ ]

DATE 08/27/93 FINAL LEVEL II

- S G

[u-

{ STAMP REPORTABLE INDICATIONS -

RECORDABLE INDICATIONS*

AREa SCANNED a- SAQ S *Complete Sketch!

FLAW DETECTOR: St9cn(3 S/N L.2-f - CALIBRATION DATE 1-'1T*

0 LONGITUDINA 45 6 SENSITIVITY No-O - 9, o SWEEP DELAY _ , _ _

SWEEP PULSE RANGE POSITION _ __-

6'% A. ,A, REP RATE if__N_____

SEARCH UNIT:

MFR/F SERIAL NO. 001____

SIZE '0'"

FREQUENCY H SINGLE/DUAL _ I _

BTCH NO.

COUPLANT: ýCi:U-c OL- 2H, H DE C90'2e)7 CALIBRATION: DATE TIME INITIALS INITIAL c-.W-9 A'< CAL.BLOCr_ . O0-Y REF.REFLECTOR  %?9f' i-4H SCANNING SENSITIVITY:

END ell +

AeA COMMENTS:

JAPPROVED: ).QATE: .

F8565 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE 16/1

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub DR JSN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 G01 04 tjA 1 3590, 12 No. Insp. No. Rej. MDR No. lRef. MDR No. [x] Solvent-Removable 0 .I O1- 35 146 1. Ix] Visible ROCTING DESCRIPTION JOINT/SEAM IDENTIFICATION INSPECTOR DATE LEVEL II STAMP J A COLLEY 09/12/93 4-Y)Weld ( )Weld Prep ( )Base Metal ' )Root Pass

)Backgouge (X)Other: c: / A-0.6__A__

MATERIAL IMANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S PRE-CLEANER MAGNAF*LUX SKC-S REMOVER MAGNAFLUX SKP-S . y-56 DEVELOPER I MAGNAFLUX SKD-S/SKD-S2 T-S(

SKETCH OR DESCRIPTION OF INDICATION(S):

-APPROVED: DATE:

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE * /

  • Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O No Drawing Item Sub IDR ISN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 G01 04 1 A) 1 3590J 317 A[4 No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable o ( 0 1Ao I [x] [* Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFI TION.

CHANNEL HD MAIUwj4y FACt- CL")

INSPECTOR DATE LEVEL II STAMP J A COLLEY 09/27/93 1 ---

( )Weld (,4Weld Prep (\)Base Metal ( )Root Pass

( )Backgouge ( )Other:_ __ _

MATERIAL MANUFACTURERI DESIGNATION W HEAT CODE PENETRANT I MAGNAFLUX SKL-HF/S  ! 1 PRE-CLEANER MAGNAFLUX SKC-S RY 4K REMOVER MAGNAFLUX SKC-S I DEVELOPER MAGNAFLUX SKD-S/SKD-S2 RT 5 SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: lDATE: -

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594*87 PAGE _ / _

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O No Drawing 12149 6145E22 Item G01 04 I

Sub IJDR 1SN/Lot

,353590 Opn.No.

325 W-HT Code/Ident.

A/4

,No.insp. NO. Rej.( MDR 'I.Ref .MDR No. x I Yoke [XI Dry a .. , ,xj Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION ICHANNEL HD i to 1-5C,05 MW A via 4rF*.

A056 INSPECTOR K J EDMONDS DATE 09/23/93 LEVEL II 1 STAMP

)Weld ( )Weld Prep (>XBase Metal ( )Root Pass

)Backgouge ( )Other:

MANUFACTURER:

MT UNIT: r-ý:r PARKER tIOTHER: A/I(A WPP I.D. NUMBER: '&J'Z-7 TEST WEIGHT I.D. NUMBER: i.----

POWDER: ><YMAGNAFLUX [ ] OTHER: A-)A COLOR: t<f RED [ I GRAY [ ] BLACK

[ I YELLOW IOTHER:

W HEAT CODE NUMBER:_ _ _ _ _ _

SKETCH OR DESCRIPTION OF INDICATION(S): A/

,APPROVED: DATE: z_3 F8820 - 00 PAGE 61, SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O No Drawing Item Sub DR SN/Lot Opn.No.IW-HT Code/Ident.

12149 16145E22 I01 1 04 11A 3590J 390 1 No.Insp. No. Rej. MIDN Ref.

.x] MDR No. Yoke [XI Dry 02 Ix] Visible ROUTING DESCRIPTION JOINT/,S~ IDENTIFICATION CHANNEL HD to CSe)oCA~). 7,C- f-,6v*L /fy INSPECTOR DATE LEVEL II STAMP J A COLLEY 10/11/93 0ý7" Lk)Weld ( )Weld Prep (A"Base Metal ( )Root Pass

( )Backgouge Q,)Other: 7"3 .A . '

MANUFACTURER:

MT UNIT: L.Y] PARKER [ ] OTHER:

WPP I.D. NUMBER: _ __ _ _ _

TEST WEIGHT I.D. NUMBER: , "3 POWDER: k] MAGNAFLUX [ I OTHER:

COLOR: [*] RED [ ] GRAY [ ] BLACK

[ ] YELLOW [ I OTHER:

W HEAT N CODE NUMBER:-E)Ed SKETCH OR DESCRIPTION OF INDICATION(S):

JAPRO-D DATE:

v F8820 - 00 (P

SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE _____/

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/O NO Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 G01 04 1410 3590J 395 f4" No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable Ol t I [x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATIO* U CHANNEL HD T(C.-&O L A(iifr 6(eu* (ote .,

INSPECTOR DATE LEVEL II STAMP J A COLLEY 10/11/93

(.)Weld ( )Weld Prep U()Base Metal ( )Root Pass

( )Backgouge WX)Other: t r-y Ai'a&AS MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT PAGNAFLUX SKL-HF/S R% 2-PRE-CLEANER MAGNAFLUX SKC-S S REMOVER

  • MAGNAFLUX SKC-S DEVELOPER MAGNAFLUX SKD-S/SKD-S2 RT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: ~-//DATE:

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP.8105 REV:06 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 16145E22 I G01 04 N/A 13590J I

400 NIA No..Insp. No. Rej.

1 MDR No. fRef.

I MDR No.1 [x] Solvent-Removable

[x] Visible 01 00 N/A N/A ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD M. MANYS&NOZZLE BORES WITH KNUCKLE RADIUSES I T INSPECTOR DATE f LEVEL II STAMP J E AINSLEY 10/20/93 I (X )Weld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other: s

  • MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT I MAGNAFLUX SKL-HF/S RS12 PRE-CLEANER MAGNAFLUX SKC-S RY56 REMOVER MAGNAFLUX SKC-S RY56 DEVELOPER MAGNAFLUX SKD-S/SKD-S2 RT5I SKETCH OR DESCRIPTION OF INDICATION(S): N/A APPROVED: DATE:

tJ v

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ P.O.0594687 PAGE V____

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/o No Drawing Item 04Sub DR 3590J Opn.No.

SN/Lot 400 W-HT Cqde/Ident.

12149 6145E22 G01 01 No.Insp. No. A/ J/ý Rej. MDR No. Ref. ý!A DR No. [x] Visibl

[x] Solvent-Removable ROUTING DESCRIPTION / JOINT/SEAM IDENTIFICATION CHANNEL HD I fotzi- CLAll INSPECTOR DATE LEVEL II STAMP W L ANDREWS 10/15/93 I

('/)Wed ()Weld Prep ()Base Metal ()Root Pass

( )Backgouge ( )Other: L-Ac Sce rF.Lo)

MATERIAL MANUFACTURER' DESIGNATION W HEAT CODE 1PENETRANT MAGNAFLUX SKL-HF/S -

PRE-CLEANER MAGNAFLUX SKC-S REMOVER I AGNAFLUX s-s DEVELOPER. MAGNAFLUX IISKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: ~DATE:

F8105 - 02 j CgRO SCE&G - V.C. SUMMER SGR PROJ: P.O.: Q594687 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/o No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 G01 04 3590J 540 Number Inspected Number Rejected MDR No. Ref. MDR No.

L! I o/ A0I0 ROUTING DESCRIPTION I JOINT/SEAM IDENTIFICATION CHANNEL HD W- X SF!

INSPECTOR DATE LEVEL II STAMP K J EDMONDS 01/19/94

)Weld ( )Weld Prep PiTBase Metal ( )Root Pass

)Backgouge (><JOther: ,;WcY-Ad/'s&4 .

VISUAL AIDS USED: [ ] NONE [ BORESCOPE [ ] CAMERA

[ MIRROR [ ] TELESCOPE [ I FIBER OPTICS

<MAGNIFYING LENS 5- Power LIGHTING: ( J NATURAL 4 FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S): gjA APPROVEDD 7.,_.,-, -.... DATE:4...

F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE &"2 .

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 041 61°52 I I I I ISO ofoDrawing 12149 F

Item..*,o*"~

~

II

,oSub 'DR ~ SN/Lotl'°n."°.W-H 350 610, Coe/dnt.° Number Inspected JNumber Rejectedl MDR No. Ref. MDR No.

/I*A I , IAl ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION JCHANNEL HD '7AL2L( jc /

INSPECTOR DATE LEVEL II I /STAMP 1( )Weld ( )Weld Prep ( )Base Metal ( )Root PassA I( )Backgouge (X)Other: 7 /&.,/&" ,

VISUAL AIDS USED: [ NONE [ ] BORESCOPE [ ] CAMERA

[ MIRROR [ ] TELESCOPE [ 3 FIBER OPTICS

[ MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [L>j FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

[APPROVED._/ x ..... ... DATE: '

F8608 - 00 .Ji" \

SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE______ ___

'NCD PENSACOLA Sh<p Order No. / /V q RADIOGRAPHIC INSPECTION REPORT jI'j*,,/_ ,1/-

f IERREIVKl ~ S &JC~tFN IHICKNESS .ý MA"ERIAL I--.

CASING )XELDMENT 1 3OTHER TYPE: .< -, ._ .- .

ITEM SUB COMP. DESCRIPTION Z OPLN. [WE LD NO. 10, DRAWING NO.

.}A ASSEMBLY NO.

ISOTOPES HIC IDENTIFI/ 57c2J k~,Ys*z ~

CURIES S0 ISIZE IFSST X-RAY FSSV D SIZE MATL

' 5-'

192 60 MEV

/ SHIMSIZE &, MATL

__A I 11RIDIUM 7ýOBALT -. 21, LEAD SCREENS WELD PROC.II EXPOSURE TIME OR KRADS ACCEPTANCE STANDARDS: CT NII IG( oLA SRES11EDPO, 71/,' CTI*N Ill NFRONT; -N[ [1.005 Pt- 0- ( I OTHER

. OTHSETION VIII E.. .. ' I ,010-,' .OTHEN, e- -"

.2 0

4.

'hi I w m. 1 3 <I-S u IA3

  • USE WHEN TECHNIQUE VARIATIONS REQUIRE FILM:

TYPEd&L.. MFG. A1:/C w<

i

4. In 0.

I c 111

/ SI U K. z  : 0S SIZE -- /-

0< I, IL 0 3 0 REMARKS NO. OF FILMS CASST. ,L) z u 6 0 -c Z S 40 E C U -L 0 4.

+ ---- + 4n

+ - + - + -I----- + --- 4..- -1 - 4--I-I---- K 4--I -

hi I- -~'- -I-to I-- ...... )

TYPE OF EXPOSURE:

"1'3-fANORAMIC t )OIHER 0

0-I .7 1 1 90 SHOT


'----4--I'-4---4--------I--------I--4-----I---l-4-4--#--I--4--.----+----+-4-4-+-I---I- I--I--I 0c-

/ - 2< x / ,./,-..., .. NO. OF EXPOSUREIS)

PERSO(NNEL ; .........

2--is ./ )e SET-UP

.L~f & LEVEL nr n*

RADIOGRAPH SETUP n'

.5 CHECK ONE d nw

<-c, ~ ____ __

  • ...ii

... '9 A-------------------------------

(

\) (\\ *.)

II I It N

__ ~I 1TT rIzi

(~ ) ( )

I I r ll llf I!, I!;l',l" I I'l II I . . .. - . - . - ..

4 -- I-- -I -- -I- - -I - 4 - I-- -I- - - -

4 I I- - 4 - 4-- 4 - I- - 4- K- 4- -I- -- 1- 4 -- 4-- I -

.'NCI) Level II Date MRN/MRR No. R.I.R. Number Is hie:

in X-Ray NOTE: SEE Oil (rtn i Nn. ( ) il-Process NCI) X-I1ay&/ A0DDI ION A I.

3Re. X-Ray Imjz No., SE F-Ill' IIAIA I"- N('-3 1622;1 , R ev. 3

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORK QIP 8608 REV:02

,t/,/Wrxt- ao /

S/O No Drawing Item I

12149 M361210 R01 Number Inspected Number Rej, I

0/ . 0 ROUTING DESCRIPTION JOINT/SEAN IDENTIFICATION NI CHANNEL HD INSPECTOR DATE J E AINSLEY 02/25/94

%)Weld ( )Weld Prep (,kyBase Metal ( )Root Pass

( )Backgouge ( )Other:

I VISUAL AIDS USED: [)1' NONE [ ] BORESCOPE [ CAMERA

[ ] MIRROR [ I TELESCOPE ( ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: NATURAL ( ] FLASH LIGHT k DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: .CDATE:-a F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE

'09NCD PI'NS;A( OILA 12149 RADI)O(RArHIII:INSI'E(IION REP'ORT P 18332 MATEIA LD NO0. 101 11-"TYPE ASME

  1. /50's SIZE D ss WEL.D PRC..

.040 N/A FILM:

TYPE AA---L FILM:

A MrGPX w

sI ZE7X 17 NO. OF FLMS 20 CASST. 10 TYPE OF EXPOSURE: 0 IX PANORAMIC I I OTHERT

( I 90' SHOT NO. OF EXPOSUREISJ L- 0 0~

SET-U?' PERSONNEL & LEVEL "I [

J. COLLEY & C. ANTONE 0 RADIOGRAPHY SET-UP cr CHECK ONE: CL U)

Ix I U) 5-(~) I I 0

II U)

( 3

,)fill'l H ' 1 t IA .I Ill NOTE: SEE OIP FOil ADD IIIONAt.

SET-UP DATA.

F-NCl)-116221". Rev. 3

737599 RADIOGRAhMC INISPRITZON RZOR O)[PON]DT SHOP ORDUt 8]an ,. mnmu*]

CHANNEL HEAD 3590J DSCRIMTON or AM OR WELD mhwU8 M IT]N SAFE END 6145E22 04 G01 WPP EXPOSURE NUMBER WELWDZIN1 PROCE.SS Qllr NUME. W=,D SZJN IDElNTITY t") P 62898 N/A (,8332 'V-X" SAFE END SK-EwtC APPROVED Dy Uz 7 V. C. SUMMER pW3JECT SAFE END WELD 8A*KING LEAD SF N 5L II N F AT * -,

lg INaE FIG. 4: NOZflI L4CXP SHOWING QUADRANT flG. 4- 5AFE END WELD SECTION OS (I) IF' RECUIREO sjJ PROCEDURE OT)SEE OP-3288 CUIE'EL!NES FOR LAYOFF OF WELD SEAMS SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE

NC('D PENSACOLA Sho~fr01 RADIOGRAPHIC INSPECTION REPORT pOrder No. 1--~IE THICKNESS:

CHECK ONE: rnIINO REV. / MATERIAL L. 1 ID I I STYPE: ju/~~ j

/C GECITO WEPER.N CAMP. WEL NOH ASSEMBLY NO. HC IDENTIFIERS DRAWING NO. ITEM SUB ¢OMP" DE5CRIP1ION OPER.......NO. I1 R 553-  %'S9o'3 t '//H~f E2Z"7 G/ e!/ 69. *A,'WjCVM - /f FO/4 U# ,7o W- SI OCURES SF0 SIZE SS. T 192 50 z/xI /RAo ME MEV MA f SHIM SIZE, MA-L E tOSR IME TII pR t,, 'COBALT ACCPTNC "z , K O A,

/&.-A LEAD SCREENS WELD PROC.0 STANDARDS; BISECTION III [ING I) NO k NB BACKT: Ill.005 l1010" 1,(THEIR_________

SECTION Vi BACK: 11.005 DID- /h OTHER O _ _ _

THER T

B I

'I, 0 USE WHEN TECHNIOUE FILM:

i Z A S

4-LI I I U S

0-2*

F.,

Q VARI ATIONS REQUIRE T'E SIZE: _L.7 MFG t S ZI J S z1 'U 5 I 0 REMARKS NO. OF FILMS _gDCASST.

TYPE OF EXPOSURE:

S

. . - -PANORAMIC I I OTHER I-t I-- I f _ tp I 1 v- [I 19O SHOT

  • -1~I-,- - -~ -~ - r 1 1I-'~I~ II I

114 LU 1-2

'-) - ,Z I V122 H_ NO. OF SET-UP EXPOSURE(S)

PERSONNEL & LEVEL ITT 7' RADIOGRAPHY SET-UP 1CHECK ONE:

5- 0u I 1 L) 7-f

/ / (. (m

-- I------I-I----4-l-------I---I-+------*----I------ I--I -I--I--I-I-K Intep -*er i' -bate M444*R.-M-* N 0. Final X-Ray R.I.R. Number Is The:

4/,.°,? 1J0 /2i( NOTE: SEE 011 IOr?

Re(. MRN/MRR No. ( ) In-Process NCD X-Ray ADDITIONAl SET-UP tIATA X-Ray I.og No.

-NCI.)-31622B, Rev. 3

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 M361211 R0 I° - 1 13590 68 No.Insp. No. . No.

MDR No. *3(0 1,2 Ref. MDR1 No.1 (x] Solvent-Removable

[x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD AiC INSPECTOR DATE LEVEL II STAMP D E ARRINGTON 03/13/94

(>dWeld ( )Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge ( )Other:

MATERIAL {MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S R PRE-CLEANER, MAGNAFLUX SKC-S e REMOVER MAGNAFX SKC-S

  • l DEVELOPER MAGNAFLUX SKD-S/SKD-S2 /

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: kQDATE:2, _74 F8105 - 02 SCE&G- V.C. ýMMER SGR PFOJ; P.O.: Q594687 PAGE 6 3!

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF WELDS RECORDING FORM QIP 8567 REV:01 S/O No Drawing Item Sub DR SN/Lot Opn.No. IW-HT Code/Ident.

12149 1M361211 R01 I- 1 35903 816 A-1 Number Inspected Number Rejected MDR No. Ref. NDR No.

JOINT/SEAM IDENTIFICATION Pk amn " OF ROUTING DESCRIPTION CHANNEL RD jr t)~ inie r~-~LO(AL INSPECTOR DATE LEVEL II STAMP jW}ý R BOLLING 03/13/94 1 .Y IN-PROCESS [L* REPAIR [ I FINAL ACCEPT [ - REJECT ( I RECORDABLE REPORTABLE INDICATIONS 0 INDICATIONS* -)

AREA SCANNED , AI4e* c swf* &.-.

  • *Complete Sketch!

FLAW DETECTOR: 5/71,6 S/N 1.; --, CALIBRATION DATEJIj-0 LONGITUDINAL 450 LONG 70' LONG SENSITIVITY 1i ga-la-16.%

SWEEP DELAY_ ' ! r SWEEP RANGE _ _

PULSE POSITION __ _ &A____.

REP RATE _________

SEARCH UNIT:

NFR/F SERIAL NO. _-__ _ _

SIZE rJ 2 S FREQUENCY _ - /71454-t SINGLE/DUAL I. ___-_

COUPLANT: Lei_

__ _ _ _ _ _HEAT DE o0--2 7 CALIBRATION: DATE TIME INITIALS INITIAL _-__- ______ ______ CAL.BLOCK L-l.2-i

___ REF. REFLECTOR V,"0 Sol,

/_ _ _ /SCANNING SENSITIVITY:

END C014MENTS:

APRVED: 7DATE:~ 6 /

F8567 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/O No Drawing Item 12149 1M361211 R01

!Number I*nsected Number Rejected (0 7 ROUTING DESCRIPTION JOINT/SEAN IDENTIFICATION CHANNEL HD ovJeIO f//L e oFr- 0/OW INSPECTOR DATE LEVEL II STAMP D E ARRINGTON 03/13/94 K qeld ( )Weld Prep ( )Base Metal )Root Pass

)Backgouge ( )Other:

VISUAL AIDS USED: [4NONE: [ BORESCOPE ] CAMERA

[ MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [ ] FLASH LIGHT p DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: ~DATE:-? ~

F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 SID No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 M361211 R01 3590J 827 Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD W--Z A-A-L PJxAO A4teA INSPECTOR DATE LEVEL II STAMP R BOLLING 03/13/94 1 V

( )Weld ( q/Weld Prep ( )Base Metal ( )Root Pass

( )Backgouge ( )Other: '-4 VISUAL AIDS USED: [4 NONE [ ] BORESCOPE ( ] CAMERA

[ ] MIRROR J TELESCOPE [ I FIBER OPTICS S]MAGNIFYING LENS A Power LIGHTING: [ NATURAL [ ] FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

IAPPROVED: DATE:

F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE ___,.__7

I  !

Westinghouse Pensacola Plant ULTRASONIC INSPECTION OF WELDS RECORDING FOR QIP 8567 REV:01 Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

S/O No Drawing 12149 M361211 R01 - - 3590J 835 Number Inspected Number Rejected .NDR No. Ref. NDR No.

I I 3 11-I1 ROUTING DESCRIPTION JOINT/SEAN IDENTIFICATION CHANNEL HD U)-a " -,,,

INSPECTOR DATE LEVEL II STAMP R BOLLING 03/13/94 YQ IN-PROCESS [ ] REPAIR [- FINAL [

ACCEPT [ .- REJECT E ] RECORDABLE REPORTABLE INDICATIONS 6) INDICATIONS* -)

AREA SCANNED O.0. _-, 71.6 W,* uI- A17 *Complete Sketch!

--- =

-=-------- ---------- MW------- ~

FLAW DETECTOR: S,7160 S/N L--e'-N CALIBRATION DATE ).Ilf--

0 LONGITUDINAL 450 LONG 700 LONG SENSITIVITY __-__-___-_ L o.-I-'."

SWEEP DELAY .. l SWEEP RANGE _-_ _-

PULSE POSITION _ ,4_

_._-4__

REP RATE )Hi SEARCH UNIT:

[FR/F SERIAL NO. _ __1_:__4 SI ZE FREQUENCY . - _ _

SINGLE/DUAL _ ___

(ATCH1U-)

COUPLANT: /HN C.t 27 H ODE o2a CALIBRATION: DATE TIME INITIALS INITIAL 3-(3-7-1 ____3_ A CAL.BLOCK L.36ý,Z REF. REFLECTOR V4'

____/ /SCANNING SENSITIVITY:

END 3-I*-Aq ZJI3- ZIIZ "__I_______

COMMENTS:

~APPROVED: DATE: . y/

F8567 - 00 0

SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE ______

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 S/O No Drawing 12149 M361211 Item R01 Sub DR SN/Lot Opn.No.

3590J 836 W-HT Code/Ident.

A No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable I 1 0 1 Ai 1[x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD .. - , a 4_ -L-.,; 4t-

. u*w A A-e4 INSPECTOR DATE LEVEL II STAMP R BOLLING 03/13/94 1 ye5 (uyWeld ( )Weld Prep (IBase Metal ( )Root Pass

( )Backgouge ( )Other:_ - __

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S PRE-CLEANER MAGNAFLUX SKC-S REMOVER MAGNAFLUX SKC-S F DEVELOPER MAGNAFLUX SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

IAPPROVED: DATE:

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE______

@NCD PENSACOLA Shop Order No. 1,V14414 RADIOGRAPHIC INSPECTION REPORT Page--Z-"f. _/_ .

C-HECK ONE: .. ... *...... *. . . SUPPLIER THICKNESS:-- MATERIAL".e ,4,4. t/

- .1 I iP NO.'e2 _> I R-V7 RE

... ... jv.. nea I.,.-u.. 'dr c -,--,., '- Cit J:/, __________________._-__

ASSEMBLY NO H/C IDENTIFIERS DRAWING NO. ITEM- SU- COMP. DESCRIPTION OPE. WELD NO. I ISOTOPES

  • O57 L / 39'-27, 4*

CURIES

/ z//

I~ A I'SIZE,/ (FSSI 4 ,// Ž X-AY> FSS FF0)r S/,IZEZc/-Z IIRIDIUM 19' o IEVjSHIM uALT , /K x MA IlE, ýArL EXPOSURE TIME OR KRADS ACCEPTANCE LEAD SCREENS ýWELD PROC.#

STANDARDS%

SECTION III ING O .1O:1 OION OTHER -

I ~ 14- SECTION OTHER

[I___

VII. FRONT:

BACK:__________

1(3 .0OO5""(3.010' yTERZ C

_______1_11___ER__W

/.

,/

S i it.

  • USE WHEN TECHNIQUE I Ii w IE FILM:~ MQ I

VARIATIONS REQUIRE I aI1I i! sIt LU I.-

/

I=

Sa C SIZE 7)(?

k-U 13

.E REMI REMARKS K

NO. OF FILMS _Z CASST.-

I IS 7I TYPE OF EXPOSURE:

I

>..,N ORAMIC [ I OTHER f1 90' SHOT

_ _ - - f0, NO. OF EXPOSUREISI SET-UP PERSONNEL & LEVEL C' erL66s

/

/ 'rirx '/'I'vne zZ_ 4, / RADIOGRAPHY SET-UP a:

CHECK ONE:

0' a:)

C ,

(0 d,

13 I 01 iEIR. (SKF~rcI-CH

~I5 NCD Leve~l, I-.'. Date MRN/MRR No.

Ž4> Final X-Ray R.I.R. Number Is The:

R'r Ierpret~ctP7 NOTE: SEE QIP FOR

,/t. I,. / Ref. M)NMR,. No. ( ) In-Process NCD X-Ray 6 7O AD DITIONAL SET-UP DATA.

Log No.

(fSD3IAl.& I Jb/L/I X-Ray ___ I EWA (?0 IPW We

Westinghouse Pensacola Plant VISUAL.EXAMINATION RECORDING FORM QIP 8608 REV:02 5/0 No Drawing Item Sub jDR 12149 16145E22 G0l 104 1A) l  ! i i

Number Inspected INumber Rejected ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD 1?&,36/,ec6,/I iern4S -2 # ý9em e2*i e'/

INSPECTOR DATE I LEVEL II STAMP K J EDMONDS 11/21/93

(ý>Weld ( )Weld

  • ()Backgouge Prep

()Other: ýZqBase/JL/A Metal ( )Root Pass '

VISUAL AIDS USED: [ NONE ( ] BORESCOPE [ ] CAMERA MIRROR ( ] TELESCOPE [ ] FIBER OPTICS MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [ I FLASH LIGHT [XC DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S): /v(A APPROVED: DATE: 1 F8608 - 00

ý0 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE 6,7 x/

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 I I S/O No Drawing Item Sub DR ISN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 G01 140/ 13590J 705 V No.Insp. No. Rej. MDR No. Ref. MDR No. [x] Solvent-Removable 0/ 1 ý7 e I A [x] Visible ROUTING DESCRIPTION I JOINT/SEAM IDENTIFICATION CHANNEL HD Al~

1)g ~t~

INSPECTOR DATE LEVEL II STAMP K J EDMONDS I11/21/93

(>4Weld ()Weld Prep k)_Base Metal ()Root Pass

)Backgouge ( )Other: tV/p i &

MATERIAL TIMANUFACTURERI DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX f SKL-HF/S I7ý5_0 PRE-CLEANER MAGNAFLUX SKC-S REMOVER ]MAGNAFLUX__]SKC-Sf 7/,

DEVELOPER MAGNAFLUX JSKD-S/SKD-S2 7-SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE: )P-Z-I3 F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.:0594687 PAGE 6 Y

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 S/O No Drawing Item Sub DR SN/Lot Opn.No._W-HT Code/Ident.

12149 M360132 *3590J R01 815 No.Insp. I No. Rej.I MIDR No. 'Ref-. MDR No- (x] Solvent-Removable

/VI//, A/",a [x]i Visible ROUTING DESCRIPTION CHAN HEAD 1

I 301NT/SEAI¶ IDENTIFICATION INSPECTOR DATE I LEVEL' II STAMP B P WISCOMBE 12/01/93 I .:-,.

4Weld ( )weld Prep ( )Base Metal ( )Root Pass

)Backgouge ('y)Other: (T, MATERIAL I IANUFACTURER1 DESIGNATION _W HEAT CODE PENETRANT II nAGNAFLUX SKL-F.',S PRE-CLEANER MAGNAFLUX SKC-S I . u<"

REMOVER I AGNAFLUX SIKC-S DEVELOPER If MAGNAFLUX jSKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: *DATE: *Z-_*

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE P 7

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 6145E22 G01 104 1 3590J 855 1 51)J T Number Inspected Number Rejected MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM ID NTIFICATION.

CHANNEL HD INSPECTOR 1ATE i LEVEL II STAMP F G CURRAN 03/04/94 (PZ'eld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other:

VISUAL AIDS USED: [ ] NONE [ ] BORESCOPE [ ] CAMERA

[ MIRROR [ ] TELESCOPE [ ] FIBER OPTICS

[ ] MAGNIFYING LENS Power LIGHTING: [ NATURAL [kYJKFLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED:

- DATE:

F8608 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE -'

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 S/O No Drawing Item Sub DR SN/Lot Opn.No. W-HT Code/Ident.

12149 16145E22 IGO1 04 1 3590J 1856 .

CHANNEL HD INSPECTOR DATE I LEVEL II STAMP F G CURRAN 03/04/94 (t.4Weld ( )Weld Prep ( )Base Metal ( )Root Pass

)Backgouge ( )Other:

MATERIAL IMANUFACTURER] DESIGNATION W HEAT CODE PENETRANT [ MAGNAFLUJX SKL-HF/S PRE-CLEANER=[ MAGNAFLUX SKC-S REMOVER MAGNAFLUX SKC-S J _ _ _ _ _

iDEVELOPER J NAGNAFLUX SKD-S/SKD-S2 SKETCH OR DESCRIPTION OF INDICATION(S):

JAPPROVED:DAE F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE .".-'"

Westinghouse Pensacola Plant VISUAL EXAMINATION RECORDING FORM QIP 8608 REV:02 r-Ii S/O NolDrawing 12149 16145E22 litem G01 Sub 04 DR SN/Lot 1,3910J pn.No.

873 1 W-HT Code/Ident.

I I I I V//

"'"O Number Inspected INumber Rejectedl MDR No. Ref. MDR No.

ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD INSPECTOR DATE LEVEL II STAMP R E ANTONE ( 02/17/94 (50Weld ( )Weld Prep (-klBase Metal ( )Root Pass

)Backgouge ( )Other: j VISUAL AIDS USED: [t.-' NONE [ ] BORESCOPE [ ] CAMERA

[ MIRROR [ ] TELESCOPE [ ] FIBER OPTICS I MAGNIFYING LENS Power LIGHTING: [ ] NATURAL [Mi FLASH LIGHT [ ] DROP LIGHT SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: I7DATE: 2-V?--g F8608 - 00 4(ý SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE _

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:07 Sio NoiDrawing Item Sub DR ISN/LotiOpn.No. W-HT Code/Ident.

1219 615E22 G01 04 i,, 135901 1875 l~oInp~lo.Rej 7MDR No. Ref. MDR No. (xl Solvent-Removable

__I_-___/_L',I

[x] Visible ROUTING DESCRIPTION JOINTISEAM IDENTIFICATION CHANNEL HD I INSPECTOR DATE LEVEL II STAMP IR E ANTONE j 02/17/94

(;k)Weld ( )Weld Prep (X-Base Metal ( )Root Pass

( )Backgouge ( )Other:

IMATERIAL 1IMANUFACTURERI DESIGNATION W HEAT CODE ENTRANT IMAGNAFLUX _SKL,-HF,/S

.PRE-CLEANERI1 I -SC-S 7 REMOVER j MAGNAFLUX SKC-S I-tl. I. "

DEVELOPER II ,MAGNAFLUX _,SKD-S/SKD-_S2 /2 /.

__/

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED:

L4. DATE: 2-(W_'ý F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE ,"

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:08 SIO NoDrawing Item ISub jDR SN/Lot Opn.No. W-HT Code/Ident.

12149 ~ 1 0 RM6l 3E90 815 35 9 ()

I I I No.Insp. No. Rej. MDR No. Ref R No. [x] Solvent-Removable I I [x] Visible ROUTING DESCRIPTION CHANNEL HD [2VJOINT/SEAM IDENTIFICATION EA k) b~-Z LEVEL II INSPECTOR INSPECTION DATE STAMP H R REINHARDTj TWeld ()Weld( Prep Base Metal ()Root Passi

)Backgouge )Other:__

MATERIAL TMANUFACTURERT DESIGNATION W HEAT CODE PENETRANT MAGNAFLUX SKL-HF/S,SKL-SP I" (S*L PRE-CLEANER MAGNAFLUX SC-S{ I5/

REMOVER MAGNAFLUX SKC-S 5 /

DEVELOPER M AGNAFLUX ISKD-S/SKD-S2 ~1c SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE: 18 -?f F8105 - 04 Ný20 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE ",

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:03 S/O NoiDrawing Iltem I Sub IDR SN/LotlOpn.No.IW-HT Code/Ident.

12149 16145E22 IG01 04 1 3590J 1890 1 No.Insp. No. Rei. MDR No. IRef. MDR No.1 (x] Yoke [x] Dry I

NO~~~-  ! , .n*l° 7e' "!

e, I [x] Visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HiD j6,V4,V* 6ývlk15

-dc/7 A'A INSPECTOR DATE LEVEL II STAMP R Guss 03/08/94 f

( )Weld Jweld Prep ( )Base Metal ( )Root Pass

( )Backgouge ( )Other:__

MANUFACTURER:

MT UNIT: P] PARKER [ ] OTHER:

WPP I.D. NUMBER: _ _ _-__ _ _ _

TEST WEIGHT I.D. NUMBER: *J?-

POWDER: NAGNAFLUX M<Z [ ] OTHER:

COLOR: (X)I RED [ ] GRAY [ ] BLACK

[ YELLOW [ ] OTHER:

W HEAT CODE NUMBER:_ _ _ _ _ _ _

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: \ pATE: -_% 1 -

F8820 - 00 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE //

Westinghouse Pensacola Plant MAGNETIC PARTICLE EXAMINATION RECORDING FORM QIP 8820 REV:04 I I S/O NoiDrawing lItem Sub DR ISN/Lot Opn.No. W-HT Code/Ident.

12149 16145E22 IG01 04 ,J/ ,13590 899 '/.-

No.Insp. No. Rej.1 MDR,No. Ref. MDR No. [x] Yoke (xJ Dry CHANNEL H DENTIFx] visible ROUTING DESCRIPTION JOINT/SEAM IDENTIFICATION CHANNEL HD /z 40, C.

LEVEL II INSPECTOR I INSPECTION DATE STAMP J R MCCREA -7A.2-.9/

(l)Weld ( )Weld Prep (X)Base Metal ( )Root Pass

()Backgouge ()Other:_____________

MANUFACTURER:

MT UNIT: [*] PARKER [ ] OTHER:

WPP I.D. NUMBER: _ _3_-___

TEST WEIGHT I.D. NUMBER: 3V- 2.

POWDER: [9 MAGNAFLUX [ I OTHER:

COLOR: [D] RED [ j GRAY BLACK

[ ] YELLOW [ ]OTHE,ý/

W HEAT CODE NUMBER:_ ___ _7 _

SKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: rDATE:_Za*

F8820 - 01 SCE&G - V.C. SUMMER SGR PROJ: P.O.: 0594687 PAGE /

SCE&G - SG3L12150 LOWER ASSEMBLY COMPLETE - SN 2986J 9742D06 HOl (RY14. RY15) 9MN NDE D-ESRIP PA 030 PT MACHINED SURFACES 934 SCE&G - V.C. SUMMER SGR PROJ; P.O.: 0594687 PAGE

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORMI QIP 8105 REV-O07 cly/ u S/0 No Drawing Item Sub DR SN/Lot Opn.No.IW-HT Code/Ident.

No.Insp. No. Rej. MDRlo. Ref..MDR No. Ix] Solvent-Removable 0 f- i[x] Visible ROUTING DESCRIPTION JOINT/SEAN IDENTIFICATION LEj: II , ECTOR INSPECTION DATE STAMP

( )Weld ( )Weld Prep K)Base Metal ( )Root Pass

( )Backgouge )Other:

)

MATERIAL MANUFACTURER DESIGNATION W HEAT CODE PENETRANT jMAGNAFLUX S*h--F//S,SKL-SP jIA IPRE-CLEANER MAGNAFLUX SKC-S g 2 Z" REMOVER MAGNAFLUtX SKC-S I leC DEVELOPER MAGNAFLUX SKD-S/SKD-S2 g7-.S- 2 ISKETCH OR DESCRIPTION OF INDICATION(S):

APPROVED: DATE F8105 - 04 SCE&G - V.C. SUMMER SGR PROJ; P.O.: Q594687 PAGE .

Westinghouse Pensacola Plant LIQUID PENETRANT EXAMINATION RECORDING FORM QIP 8105 REV:06 S/0 No Drawing I.Item Sub 1DR t ISN/Lot I Opn-No T W-HT Code/Ident.

12149 9742006 1 02 100001 1030 INo.Insp._INo° Rej-1 MDR No. IRef- M'DR o-[o (x1 Solvent-Removable I4 I // t4~2 x] visible ROUTING DESCRIPTION JOINT..-'$E&¶ T_.DPNT FICATION ISAFE END '4 INSPECTOR DATE LEVEL F I I STAMP F G CURRAN 10/11*L 3

)Weld ( )Weld Prep ( )Base MetJ ,)R ot Passi QA f()Backgouge (k~f~ther: ~ -i~~

MATERIAL IM ANUFACTURERI j *wESI1.

BTO1

!EAT CODE PENETRANT MAGNAFLUX SKL-HF/: ______________

,REMOVER MAGNAFLUX SC-:I 5 IDEVELOPER IIMAGNAFLUX 1 3YD -3z7:fS~

ISKETCH OR DESCRIPTION OF !NDIC.?TTOlT(3):

'APPROVED: ..- "" DATE:

F8105 - 02 SCE&G - V.C. SUMMER SGR PROJ: P.O.: O594687 PAGE - 5

Document Control Desk CR-12-00556 RC-1 2-0097 5 pages South Carolina Electric & Gas Co. (SCE&G)

Virgil C. Summer Nuclear Station Unit I (VCSNS)

Attachment 3 Inservice Inspection for Steam Generator "A" Penetrant Inspection and Ultrasonic CGE-1-4100A, Steam Generator "A"

I~~a31heofl ISiner osncosPgI

-RC11A o

LIQUID PENETRANT INSPECTION REPORT

  • rocedeso, SCEG&-PT-89-1 R. f T-ickness SEE REEMRK, Iso No. CGE-t-4100A

-remperature SEE RE-MARKS Gauge ID 173392 Other N / A A- Component M. Examination Results Location of Indications kema B. E!ýRort NO. N*R RI I.,ength A-1-4100A-29 X NANIA' N /,

4 B. 9GQ3050 N/ A N A -CATBJ TEMP..94 F A-I-4100A-31(DM ) X N B. 9603050 X l IANA N A CAT.BF TEMP--94E A 1-4100 A -3 . . -,0-1B. 9N0 A NIA N A CATM TEMP 4°F A-B. N ______

A.

B. _

B. _ _ _ _ _ _ _ _

A-B.__ _ _

A-A B. _ _ _ __ _ _ _ _ A__

Caagoxy SEE REMARKS Item Number. 89.1/

  • List dcfferent temperatures of exams in the remadks column.

Manufacturer Tye Batch No.

Ien-rat s.herwin c:p-51 423 J47 Cleanc /Remover shervwn dr- 41 2A4 Developer Eherwin d-o 42GA6 Examinalion Type Inspecator/I..evei R.G. A UER LVfItL= Date: /0 9 7

[ ) ADDI-A&Wd Inspe-ctor/i-evel S-T FOSS =t7ZI(9fLVi.

-.W Date: /0 9 7 1Aurw-Aa&ment Rmviewed (aWreon) Date: - S U)., (X Reviewed (Client) - Date: AP.f2 fsUCucc,..i.

Reviewed (AND1) D______

aX-etx2 c:a 4713 (VIL 90 VD avd

OPI(r-INAIi ISI Raytheon - Engineers & Constractors Page I of I LIQUID PENETRANT INSPECTION REPORT Procedure/Revision. Stk- p- gq - I/I Thicknes 9U &MA 9~ IsoNo. (-9/'z

  • Temnperatue ?a Cauge ID GF  !'73s"l 7 Other .*sy$m - V A. Component ID) Examination Results Location of Indications Remarks B. Report No. NRI RI Length A. &,ll*,)AA30

-,r&TE,6Y / Be- 9*.I B. 56 6302) i .A11A ..NL Al/14 rwtUAIA-fS 2.r'r A. q6 .DM) e -&drr., 13-F S' "70 B. 4-,A

. 9 11/A MCAAMTS Z.

A.

B.

A.

B.__

A-B.

A-AB.

T 1 ____________

B.

Cat4gorY-. SCIE &fMARUS Item Number-- SEC 1ZMARKI

  • List different temperatures of exams in the remarks column.

Manufacturer Twe Batch No.

Penetrant 5cif4E Jir DI q37q%

4P-sI Cleaner / Remover <59EAA! P-A-66 51 q L Developer 5 HCeRnIM D-1IO0 6'ZSC_

_ J-. D ate: Id - 19'-'T7 Inspector/Level ADDL-Additimaml Inspector/Level /\LJ~~(7 <J . Date: 10-1V-910F2 I AuGm-Angment

  • ., 3 BASE-Bmeline Reviewed (Raytheon) Date: lO'lf-?7 K -c he-Reviewed (Client) Date: Jj)7 [ ] SUCC-Successive Date: , SUPP-Supplemental Reviewed (ANII)

RPEEX-Ree.xminston 101f (VTL JO GZV a6vd)

Rayfig-E-ghei-&Const41ruioS UiiI61I\AL IS I Pg i iI ULTRASONIC CALIBRATION DATA SHEET Client __ ___ Iso No- C6/-'/r"o4 Project V6_-St____

System 14. Procedure / Rev. C46E6-QT-"9f1-, Date -l q-ef 7 ft~r.I Line Number j ~ Report Number ?06-0~~Z Reflector Type CalBlkNumnber 17

  • 1 PZ Bk Temperature -_ ___SDs [f]

EDIrs []

Type of Exam Axial [...- 00 Base Metal [] Notches ,.]-

Circ. [] oLa Scan [] Other [ ]

Components Examined Temperature Results

3) ,- -g*2J

- 4ý1,10,4 -':32.(,0M) ILI[ NRJ[JM Geometry E]

_Id.

9g2 'F RI [R]Ge[-' ometry [

4) "* R IR NRI Geometry Search Unit Instrument Manufacturer KIM Single [ Manufact. STae-y S/N 136- -OZ Style f AIPf^4 Dual [u.3 Model £,vA.. JZ6 Damping *0-c*.

Size 1o.0xI, 0t SIN r- . - Freq. _1 ?oMI40 hlselns -

Nor. Angle ____ Freq. )rhHZ- Rep.Rate. h 14-Z Reject QF:r Mode ________ Meas. Ang- &'1 Filter No. "2. Velocity .2 Couplant wL1..4&GU* Batch No. q Range In- 10,-C6 Delay/fIn 1.1f Cable: Type R65 Single [" Dual [n<"Length

  • Connectors -12 .

Cal-Type: Metal Path [,]-- Depth[ 3 100 Primary Ref Response X D t4-+ 1 'O '/% r-5W 90 ___- - c Reference Seas. Axial 196-ti, Circ. / 80. _ -

Hole Sens. Axial IV Circ. l/iA 70 Scan Sens. Axial -7z, -id, 6 Circ. Iyi 60 Noise Level Axial 1e,% Circ. 50 ..

' 40 Cal. Chk. Date T.me Acceptable 30 Initial Jo1- q-q7 _ __ -

  • 5 20 Intermed. 1O-/4-f 7 15:

s Ye 10 _

Intermed. - /I'-t- Iso: (0O Item# 0 1 2 3 4 5 6 7 8 9 10 Intermed. I q, - /y-'-7 11";2.0 yes. I Screen Size 10.o001 Final j________

Comments: 5,AIivg pFZO, .- ?4h- Sr=*a

-a) l

/v D0-. 7"1

£ *4AE E 'A.. O J,,

t6 tU 7 "T , . ..

InspectorlLevelaree InIsp7ctorFLevelfate 6-E Reviewed (Raytheon) Reviewed (client)

Reviewed (ANIr) _ Ott.=______/ __]_____o__

(~rL JO ~ 0~d)

Raytheon Eng~izears&Construcfors S IŽ I D ASET Pager 14- 67 f(7 Client C1 Iso No. C -O, Project _________

System (_" Procedm'e/Rev.R Date 1 . -c-7 Rev. ..-

Line Number _ _ _ Report Number q6Q3Q*3o--

Reflector Type CalBlkNumber q7qfDZ.Z 131k Temperature "toF SDI.s [3 EDrs ]

Type of Exam Axial [] 0° Base Metal [w Notches [H-Circ. [m O0Lam Scan [ Other []

Components Famined Temperature ]Results

1) E,.E-.L.- 1i10, --V c Pfh 1&2

___= RI [ ] M [<hGeometry [

2)0 E- .--q1t-32(.0mq) S 2- F RI [ J NRI [ "Geometry [11

3) - _ .*, RI [ ] NRI[] Geometry LI
4) +/- j. RI[J RI[*] Geometry [

Search Unit Instrument Manufacturer KBAz Single [3 ufact &r~..kLy SIN 3-V4 Style 4.4/P1, Dual [ M-1" odel Soi,-. i,6 Damping .5o-a.

Size 1.o0c 1,0," S/Ne-.qs.;&j_'_ Freq. __,_H -a- Pulse/s qq Nom. Angle V.%O Freq. / ,h Rep. Rate. I Wigo Reject 0-W Mode JLoA/j* ,d;, Meas. Ang . 4 £0 Filter No. Z Velocity .

Couplant ClrTJ{ý4-EZ T BatchNo. -3L Range a 100o0" Delay/In ,

Cable: Type R.65S Single [ ] Dnal [--Length ' Connectors O Cal.Type: Metal*Path [q- Depth[ 3 100 1  !

Primary Refiesponse Reference Sen& Axial

_t) NV44t1 42 -Ze% rs/

IV/ 4 Circ. qA1.0CL, 90 so I1 L- V Role Sens. Axial, A Circ. ,*/4 70 _

Scan Seas. Axial /yjA Circ. O &e, 60 Noise Level Axial 1A. C 1oi%,05 50/0 Cal. Chk Date Time Actable 30 _

Initial 7 -4,'17 1o-/q-q 1= 20 _

interned.-O-IH-q' -,*:oo IS 10 Inter'meA 1 -14*W-q7 ____ F. Item#_ 0 1 2 3 4 5 6 7 8 9 10 lnt~ermed. to-/'--e7 _7___ .yScre= Size NJo_

Final Io-I'.-97 1 :1qq __.__7 Camments: IrIop 5APt- 4O GNji¢o .PFe L*f V TDO Inspecto r/Lev~eMMate I/0-/t/- Inspector'LeveL/Date______________

.--r*&L:,*PTbt4M

    1. ..**aL:
  • Reviewed (Raytheon) Wd' Reviewed (Client) /)(~q Reviewed (AWM4 -!/~?f- Other ________