MONTHYEARRC-22-0004, (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System2022-01-14014 January 2022 (Vcsns), Unit 1 - 2021 Annual Letter of Certification and Testing Results of the Public Alerting System RC-18-0157, (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-28028 December 2018 (Vcsns), Units 1, 2 and 3 Independent Spent Fuel Storage Installation - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0149, ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-12-21021 December 2018 ISFSI - Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0136, (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683)2018-12-12012 December 2018 (Vcsns), Unit 1 - Request to Remove the Expired One-Time Extension to Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation and to Remove the Index from Technical Specifications (LAR-18-04683) RC-18-0144, (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 252018-11-20020 November 2018 (Vcsns), Unit 1 - Core Operating Limits Report (COLR) for Cycle 25 RC-18-0126, (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-01692018-11-0909 November 2018 (Vcsns), Unit 1 - Notification of an Intended Change a Commitment Date for Open Phase Condition (OPC) Made in RC-17-0169 RC-18-0070, (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ...2018-10-0808 October 2018 (Vcsns), Unit 1 - Relief Request RR-4-14, Use of a Performance Based Testing Frequency for Pressure Isolation Valves as an Alternative to the Requirements of the American Society of Mechanical Engineers Code for ... RC-18-0067, (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.22018-10-0808 October 2018 (Vcsns), Unit 1 - License Amendment Request - LAR-16-00644 - Revise Reactor Coolant System Operational Leakage Technical Specification Surveillance Requirement 4.4.6.2.2 RC-18-0123, NRC Request for Information Baseline Radiation Safety Inspection2018-10-0404 October 2018 NRC Request for Information Baseline Radiation Safety Inspection RC-18-0117, (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment2018-09-28028 September 2018 (Vcsns), Unit 1 - Fukushima Near-Term Task Force Recommendation 3.1: Seismic Probabilistic Risk Assessment RC-18-0112, (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.32018-09-27027 September 2018 (Vcsns), Unit 1 - Request for License Amendment to Virgil C. Summer Nuclear Station Technical Specification 3.8.2, D.C. Sources - Operating, Surveillance Requirements 4.8.2.1.B.2 and 4.8.2.1.C.3 RC-18-0119, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-09-19019 September 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422, Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0118, (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange2018-09-14014 September 2018 (Vcsns), Unit 1 - Relief Request RR-4-18, Request for a Temporary Non-Code Repair of a Service Water System Flange RC-18-0116, (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information2018-09-11011 September 2018 (Vcsns), Unit 1 - Request for a One-Time Extension to the Surveillance Frequency 4.4.4.6 of the Core Exit Temperature Instrumentation - Response to Request for Additional Information RC-18-0113, (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-31031 August 2018 (Vcsns), Unit 1 - Supplement to License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0091, License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions2018-08-29029 August 2018 License Amendment Request - LAR-16-01490 National Fire Protection Association Standard 805 Program Revisions RC-18-0111, License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation2018-08-24024 August 2018 License Amendment Request LAR-18-03422 Request for a One-Time Extension to the Surveillance Frequency 4.3.3.6 of the Core Exit Temperature Instrumentation RC-18-0100, (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information2018-08-22022 August 2018 (Vcsns), Unit 1 - Technical Specification Change Request for the Revision of the Surveillance Frequency of the Turbine Trip Functional Unit: Response to Request for Additional Information RC-18-0105, (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water ..2018-08-14014 August 2018 (Vcsns), Unit 1 - Relief Request RR-4-17, Request to Utilize Code Case N-513-3 'Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1' for a Service Water .. RC-18-0102, Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error2018-08-10010 August 2018 Withdrawal of Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0098, (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-07-30030 July 2018 (Vcsns), Units 1, 2 and 3 - Modification of Requested Latest Completion Date in Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-18-0085, (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-01262018-07-23023 July 2018 (Vcsns), Unit 1 - Notification of an Intended Change to a Commitment Made in RC-17-0126 RC-18-0090, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request...2018-07-12012 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Response to Request... RC-18-0089, (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-11011 July 2018 (Vcsns), Unit 1 - Relief Request RR-4-16, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0084, Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Requ2018-07-0303 July 2018 Virgil C Summer Nuclear Station (Vcsns), Unit 1 - Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Laws in Moderate Energy Class 2 or 3 Piping Response to Reques RC-18-0082, Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping2018-07-0303 July 2018 Relief Request RR-4-15, Request for Alternative to Implement Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping RC-18-0079, Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error2018-06-29029 June 2018 Vigil C. Summer Nuclear Station (Vcsns), Unit 1 - Request to Revise Technical Specifications to Correct an Administrative Error RC-18-0074, Change of the Commitment Date of DRIB/105A&B Door Submittal2018-06-18018 June 2018 Change of the Commitment Date of DRIB/105A&B Door Submittal RC-18-0060, (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error2018-05-30030 May 2018 (VCSNS) - Request to Revise Technical Specifications to Correct Administrative Error RC-18-0064, (Vcsns), Unit 1 - Annual Commitment Change Summary Report2018-05-18018 May 2018 (Vcsns), Unit 1 - Annual Commitment Change Summary Report RC-18-0063, Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation2018-05-0202 May 2018 Submittal of 10 CFR 72.48 Biennial Report for the Independent Spent Fuel Storage Installation RC-18-0056, (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors2018-04-25025 April 2018 (Vcsns), Unit 1 - Licensee Event Reports (2016-001-02, 2016-002-01, 2016-003-02) - Revision to Correct Typographical Errors RC-18-0059, Annual Radioactive Effluent Release Report2018-04-25025 April 2018 Annual Radioactive Effluent Release Report RC-18-0046, License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information2018-04-19019 April 2018 License Amendment Request LAR-14-01541 Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change Request for Additional Information RC-18-0036, (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information2018-04-0202 April 2018 (Vcsns), Unit 1 - Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds - Response to Request for Additional Information RC-18-0041, Report of Status of Decommissioning Funding2018-03-28028 March 2018 Report of Status of Decommissioning Funding RC-17-0175, Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error2018-01-31031 January 2018 Correction to Amendment No. 170 Request to Revise Technical Specifications to Correct Administrative Error RC-18-0006, Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses2018-01-25025 January 2018 Independent Spent Fuel Storage Installation Re Application for Order Approving Indirect Transfer of Control of Operating License and Combined Licenses RC-17-0169, Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-00192017-12-11011 December 2017 Notification of an Intended Change of a Commitment Date for Open Phase Condition Made in RC-14-0019 RC-17-0182, (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status2017-12-11011 December 2017 (VCSNS) - Anchor Darling Double Disc Gate Valve Information and Status RC-17-0172, Notification of Personnel Changes2017-11-30030 November 2017 Notification of Personnel Changes RC-17-0161, Submittal of Change of the Commitment Date of DRIB/105A&B Door2017-11-28028 November 2017 Submittal of Change of the Commitment Date of DRIB/105A&B Door RC-17-0135, Annual Commitment Change Summary Report2017-11-0303 November 2017 Annual Commitment Change Summary Report RC-17-0123, Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds2017-10-30030 October 2017 Relief Request RR-4-13, Use of a Risk-Informed Process as an Alternative for the Selection of Class 1 and Class 2 Piping Welds RC-17-0140, Transmittal of 10 CFR 50.59 Biennial Report2017-10-23023 October 2017 Transmittal of 10 CFR 50.59 Biennial Report RC-17-0107, (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change2017-10-0606 October 2017 (Vcsns), Unit 1 - Integrated Leak Rate Test Peak Calculated Containment Internal Pressure Change RC-17-0134, Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 12017-09-27027 September 2017 Response to Request for Supplemental Information, License Amendment Request - LAR-15-01424; Implementation of WCAP-15376-P-A, Revision 1 RC-17-0126, Reply to a Notice of Violation, Per Inspection Report 05000395/20170022017-09-0606 September 2017 Reply to a Notice of Violation, Per Inspection Report 05000395/2017002 RC-17-0112, Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days2017-09-0101 September 2017 Special Report (Spr) 2017-007 Regarding Waste Gas Holdup System Explosive Gas Monitoring System Being Inoperable for Greater than Thirty Days RC-17-0069, (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description2017-08-30030 August 2017 (Vcsns), Unit 1 - Quality Assurance Approval Certificate No. 0479, Transmittal of the Quality Assurance Program Description 2022-01-14
[Table view] |
Text
Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY March 31, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 GUARANTEE OF PAYMENT OF DEFERRED PREMIUMS ANNUAL 10CFR140.21(e) REPORT In accordance with 10CFR140.21(e), South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, is hereby submitting the required 2003 actual and 2004 projected cash flow statements.
Portions of the 2004 cash flow information are considered company confidential, and as such we request that it be withheld from public disclosure pursuant to 10CFR2.790(b)(1). The affidavit to support this request is provided as Attachment 1. Proprietary and non-proprietary versions of the cash flow information are provided by Attachment 2 and Attachment 3 respectively.
Should you have any questions, please contact Mrs. Donna Railey at (803) 345-4107.
_- VeryWtly yours gA IL Ac PI ephenA- Byrne tg A t3 DWR/SAB/dr Attachments (3)
- 1. SCE&G Affidavit to Request Withholding of Proprietary Information from Public Disclosure
- 2. SCE&G's 2003 Actual Cash Flow and 2004 Projected Cash Flow (Proprietary Version)
- 3. SCE&G's 2003 Actual Cash Flow and 2004 Projected Cash Flow (Non-Proprietary Version) c: N. 0. Lorick NRC Resident Inspector N. S. Carns K. M. Sutton T. G. Eppink (without attachments) NSRC R.J. White RTS (L-99-0359)
L.A. Reyes File (818.02-4, RR 8175)
K. R.Cotton DMS (RC-04-0057)
Attachment 2 Contains SCE&G Proprietary Information SCE&G I Virgil C.Summer Nuclear Station
- P.0.Box 88 *Jenkinsville, South Corolina 29065 -T (803) 345.5209
Document Control Desk, USNRC L-99-0359 RC-04-0057 Page 1 of 2 UNITED STATES NUCLEAR REGULATORY COMMISSION SOUTH CAROLINA ELECTRIC & GAS COMPANY OPERATING LICENSE NO. NPF-12 VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 Request to Withhold Proprietary Information from Public Disclosure South Carolina Electric & Gas Company, a South Carolina corporation, hereby requests that to the letter entitled "Guarantee of Payment of Deferred Premiums" dated March 31, 2004, be withheld from public disclosure due to its proprietary nature. The details of this request are provided in the following affidavit:
AFFIDAVIT I, Stephen A. Byrne, being duly sworn, depose and state as follows:
(1) I am Senior Vice President, Nuclear Operations, South Carolina Electric & Gas Company (SCE&G) and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld consists of portions of the 2004 Projected Cash Flow that is included in Attachment 2 to SCE&G's March 31, 2004 letter to the NRC entitled "Guarantee of Payment of Deferred Premiums". Attachment 2, a one-page document, has the words "SCE&G Proprietary Information" on the bottom of the page.
(3) In making this application for withholding of proprietary information of which it is the owner, SCE&G relies upon the exemption from disclosure set forth in the NRC regulation 10 CFR 2.790(b)(1) for confidential financial information.
(4) Justification for the request for withholding from public disclosure is provided by addressing the five items identified in 10 CFR 2.790(b)(4).
To the best of my knowledge and belief:
- a. This information is considered company confidential and has been held in confidence by SCE&G.
- b. This information is of the type customarily held in confidence by SCE&G and the rationale basis is that it would provide an unfair advantage to competitors if it were disclosed.
Document Control Desk, USNRC L-99-0359 RC-04-0057 Page 2 of 2
- c. This information is transmitted in confidence to the NRC and the purpose of this request is to maintain its confidentiality.
- d. The 2004 projected cash flow information is not available from public sources.
- e. Public disclosure of the information sought to be withheld is likely to cause harm to SCE&G's competitive position and reduce the availability of profit-making opportunities.
This letter contains no restricted or other defense information.
I certify under penalty of perjury that the foregoing is true and correct.
SOUTH CAROLINA ELECTRIC & GAS COMPANY Executed on - /tep,/ A/Byrne ejror Vice President, Nuclear Operations 5 A 3yA, ir
Text
Stephen A. Byrne Senior Vice President, Nuclear Operations 803.345.4622 A SCANA COMPANY March 31, 2004 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Dear Sir / Madam:
Subject:
VIRGIL C. SUMMER NUCLEAR STATION (VCSNS)
DOCKET NO. 50/395 OPERATING LICENSE NO. NPF-12 GUARANTEE OF PAYMENT OF DEFERRED PREMIUMS ANNUAL 10CFR140.21(e) REPORT In accordance with 10CFR140.21(e), South Carolina Electric & Gas Company (SCE&G), acting for itself and as agent for South Carolina Public Service Authority, is hereby submitting the required 2003 actual and 2004 projected cash flow statements.
Portions of the 2004 cash flow information are considered company confidential, and as such we request that it be withheld from public disclosure pursuant to 10CFR2.790(b)(1). The affidavit to support this request is provided as Attachment 1. Proprietary and non-proprietary versions of the cash flow information are provided by Attachment 2 and Attachment 3 respectively.
Should you have any questions, please contact Mrs. Donna Railey at (803) 345-4107.
_- VeryWtly yours gA IL Ac PI ephenA- Byrne tg A t3 DWR/SAB/dr Attachments (3)
- 1. SCE&G Affidavit to Request Withholding of Proprietary Information from Public Disclosure
- 2. SCE&G's 2003 Actual Cash Flow and 2004 Projected Cash Flow (Proprietary Version)
- 3. SCE&G's 2003 Actual Cash Flow and 2004 Projected Cash Flow (Non-Proprietary Version) c: N. 0. Lorick NRC Resident Inspector N. S. Carns K. M. Sutton T. G. Eppink (without attachments) NSRC R.J. White RTS (L-99-0359)
L.A. Reyes File (818.02-4, RR 8175)
K. R.Cotton DMS (RC-04-0057)
Attachment 2 Contains SCE&G Proprietary Information SCE&G I Virgil C.Summer Nuclear Station
- P.0.Box 88 *Jenkinsville, South Corolina 29065 -T (803) 345.5209
Document Control Desk, USNRC L-99-0359 RC-04-0057 Page 1 of 2 UNITED STATES NUCLEAR REGULATORY COMMISSION SOUTH CAROLINA ELECTRIC & GAS COMPANY OPERATING LICENSE NO. NPF-12 VIRGIL C. SUMMER NUCLEAR STATION DOCKET NO. 50/395 Request to Withhold Proprietary Information from Public Disclosure South Carolina Electric & Gas Company, a South Carolina corporation, hereby requests that to the letter entitled "Guarantee of Payment of Deferred Premiums" dated March 31, 2004, be withheld from public disclosure due to its proprietary nature. The details of this request are provided in the following affidavit:
AFFIDAVIT I, Stephen A. Byrne, being duly sworn, depose and state as follows:
(1) I am Senior Vice President, Nuclear Operations, South Carolina Electric & Gas Company (SCE&G) and have been delegated the function of reviewing the information described in paragraph (2) which is sought to be withheld, and have been authorized to apply for its withholding.
(2) The information sought to be withheld consists of portions of the 2004 Projected Cash Flow that is included in Attachment 2 to SCE&G's March 31, 2004 letter to the NRC entitled "Guarantee of Payment of Deferred Premiums". Attachment 2, a one-page document, has the words "SCE&G Proprietary Information" on the bottom of the page.
(3) In making this application for withholding of proprietary information of which it is the owner, SCE&G relies upon the exemption from disclosure set forth in the NRC regulation 10 CFR 2.790(b)(1) for confidential financial information.
(4) Justification for the request for withholding from public disclosure is provided by addressing the five items identified in 10 CFR 2.790(b)(4).
To the best of my knowledge and belief:
- a. This information is considered company confidential and has been held in confidence by SCE&G.
- b. This information is of the type customarily held in confidence by SCE&G and the rationale basis is that it would provide an unfair advantage to competitors if it were disclosed.
Document Control Desk, USNRC L-99-0359 RC-04-0057 Page 2 of 2
- c. This information is transmitted in confidence to the NRC and the purpose of this request is to maintain its confidentiality.
- d. The 2004 projected cash flow information is not available from public sources.
- e. Public disclosure of the information sought to be withheld is likely to cause harm to SCE&G's competitive position and reduce the availability of profit-making opportunities.
This letter contains no restricted or other defense information.
I certify under penalty of perjury that the foregoing is true and correct.
SOUTH CAROLINA ELECTRIC & GAS COMPANY Executed on - /tep,/ A/Byrne ejror Vice President, Nuclear Operations 5 A 3yA, ir