RBG-47923, Notification of Spent Fuel Cask Use

From kanterella
Jump to navigation Jump to search
Notification of Spent Fuel Cask Use
ML18365A204
Person / Time
Site: River Bend, Holtec  Entergy icon.png
Issue date: 12/19/2018
From: Reynolds J
Entergy Operations
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
RBF1-18-0239, RBG-47923
Download: ML18365A204 (14)


Text

~Entergr.

RBG-47923 December 19, 2018 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Notification of Spent Fuel Cask Use River Bend Station, Unit 1 Docket No. 50-458 License No. NPF-47 Entergy Operations, Inc.

R1'!er Bend Station 5485 U S H1gt1way 61 N St Francis*11lle. LA 70775 Tel 225-381-4177 Jeffrey W. Aeyn olds D1rec10, Regulatory & PerfQrmancc I rn provernent 10CFR72.212(b)(2)

Pursuant to 10CFR72.212(b)(2), Entergy Operations, Inc. hereby provides notification of the use of two (2) spent fuel storage casks at River Bend Station (RBS). The casks were placed in service on (11/19/2018) and (12/03/2018), respectively.

Licensee Name:

Licensee Address:

Reactor License No.:

Reactor Docket No.:

ISFSI Docket No.:

Cask Certificate No.:

Cask Model No.:

Entergy Operations, Inc.

River Bend Station 5485 U. S. Highway 61 St. Francisville, LA 70775 NPF-47 50-458 72-49 1014 (Amendment No.5)

Hi-Storm 1 OOS Version B Refer to Attachments 1 through 3.

This document contain o regulatory commitments. If you require additional information, please contact Mr. J e ey Reynolds at (225) -381 -3612.

RBG-47923 Page 2 of 2 JWR/djp : Cask Identification: Cask Serial No. 631 (RBS Identification No. DFS-HS30)

(11/19/2018). : Cask Identification: Cask Serial No. 632 (RBS Identification No. DFS-HS31)

( 1 2/03/2018).

cc:

Director - Spent Fuel Project Office Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission NRC Regional Administrator - Region IV NRC Senior Resident Inspector - River Bend Station Department of Environmental Quality Office of Environmental Compliance Radiological Emergency Planning and Response Section Public Utility Commission of Texas

ATTACHMENT 1 RBG-47923 Cask Identification: Cask Serial No. 631 (RBS Identification No. OFS-HS30) (11/19/2018).

(

\\ '

  • EN-NF-200 Rev. 14 Attachment 9.1 ICA Transfer Form Official Copy FMet Standard Cowreheet Site and Unit: River Bend Station Unit 1 (1)

(2)

(3)

Transfer form Number: RBS-2018-008 Revision Number. O Issued (Date): -...:l~=---=Af,:,,;,.,.....;;.~....;.& _______ _

Reason For Transfer. Move loaded MPC (serial number 631 l from the cask pool to the cask wash pit. MPC will be loaded Into HI-STORM cask (DES:HS30). Cask to be moved to the cask storage area and finally to the ISFSI. This is the 30ffi cask loading.

Notes I Comments I Special Instructions:

MPC:68. DFS-MPC30 (SIN 631) to be loaded into HI-STORM cask DFS-HS30 {SIN 1160). HI-STORM cask DFS-HS30 will be stored in the Independent Spent Fuel Storage Installation (ISFSI}. Location determined and recorded by fuel service. Reference attached map to designate ISFSI location.

(4)

Prepared By: ~

\\,\\\\~._ ~

CJ4w,

\\o -,-, * \\i (4a)

Reviewed By: t:e,,,*...

!.. kb Y,, 0

.._... tend toll1 f.._,

(4b)

Additional Approvals By:_N/_A ________________ _

(1 O, SNMC Approval:,fe,uo* Nlo1L ~

Linesj_ Toruioate ti* ~

/I (14) SNM Records Updated By: ________ Lines __

Thru ___ Date: __

(15) lndependentty Verified By: ________ Lines __

Thru __ Date: __

(16) SNMC Closure Approval:--------------------

EN-NF-200 Rev. 14 Attachment 9.1 ICA Transfer Form Fleet Standard ICA Transfer Fonn Step Male rial Serial Number I FROM TO Performed Oescf"1ion Equipment ID By Date/Time Verified By Notes SN: 631

/3/)

1)/!t '~

[if MPC Cask Pool cask Wash Pit ID: DFS-o~st..

MPC30

(\\)

SN: 631 fr 111 1~1, ~

MPC Cask Wash Pit Cask Loading 4-ID: DFS-Area MPC30

/'(:,/

0 SN: 1160 ISFSI ~

I I~\\ 1i HI-STORM Cask Loading Jl

/}11.~

ID: DFS-Area g2_

,1~7-HS30 RBS-2018-008 Page2 of 2

ATTACHMENT 2 RBG-47923 Cask Identification: Cask Serial No. 632 (RBS Identification No. OFS-HS31) (12/03/2018).

(

(

l EN-NF-200 Rev. 14 Attachment 9.1 ICA Transfer Form Fleet Standard Coversheet Official Copy Site and Unit: River Bend Station Unit 1 (1)

Transfer Fonn Number: RBS-2018-009 Revision Number. O (2)

Issued (Date): _...;_\\ \\----'* %.._-...... \\$ _______ _

(3)

Reason For Transfer: Move loaded MPC (serial number 632) from the cask pool to the cask wash pit. MPC will be loaded into HI-STORM cask (DFS-HS31}. Cask to be moved to the cask storage area and finally to the ISFSI. This is the 31st cask loading.

Notes I Comments I Special Instructions:

MPC-68. DFS-MPC31 (SIN 632) to be loaded into HI-STORM cask OFS-HS31 (SIN 1161). HI-STORM cask DFS-HS31 will be stored in the Independent Spent Fuel Storage Installation {ISFSI). Location determined and recorded by fuel service. Reference attached map to designate ISFSI location.

(4)

(4a)

(4b)

(10)

Prepared By: '('r\\... ""'-i V-)\\\\'-:,,,s ~

tgU..v..,

\\I) - \\ ""\\ -,i Reviewed By: Rebecca lTofdo ~

10* 2.'1-111 Additional Approvals By:_N

...... / __ A ________________ _

SNMC Approval: J£M4>a t411--Jc.. ~

4ry Lines..1.Thru..a._Date 8 A..- Pll8 ti (14) SNM Records Updated By: ________

Lines __

Thru __

Date: __

(15) Independently Verified By: ________

Lines __

Thru. __

Date:. __

(16) SNMC Closure Approval:--------------------

--~

EN-NF-200 Rev. 14 Attachment 9.1 ICA Transfer Form Fleet Standard ICA Transfer form Material Serial Number I FROM TO Perfonned Date/Time Verified By NOies Step Description Equipment ID By SN: 632

,ij1..i/1r Q

r

~

MPC Cask Pool Cask Wash Pit

-~

rz.'~r ID: DFS-MPC31 CP SN: 632 1~\\1.-/1i Cask Loading ~

?L MPC Cask Wash Pit Area ID: DFS-tYl-f 7 MPC31

_/

SN: 1161 ISFSI fir rz./3/19 cp Cask Loading 1

~~

HI-STORM Area

}

ID: DFS-

/3SD HS31 RBS-2018-009

\\

Page2 of 2

LIST OF REGULATORY COMMITMENTS The following table identifies those actions committed to by Entergy in this document. Any other statements in this submittal are provided for information purposes and are not considered to be regulatory commitments.

TYPE (check one)

SCHEDULED COMMITMENT ONE-TIME CONTINUING COMPLETION ACTION COMPLIANCE DATE

.Entergy NUCLEAR QUALITY RELATED EN-Ll-106 REV.19 MANAGEMENT MANUAL INFORMATIONAL USE PAGE 1 OF2 NRC Com,spondence ATTACHMENT 9.4 NRC SUBMITTAL REVIEW

{Typical)

Letter#: RBF1-t8-0239 Response Due: December 19, 2018

Subject:

Notification of Spent Fuel Cask Use Date Issued for Review: December 19, 2018 Correspondence Preparer I Phone#: Dennis Pereira I 4621 Section I letter Concurrence and A reement to Perform Actions POSITION I NAME Signature Action concurrence, c (si n. interoffice mem e-mail, or teJecom)

Robert Morgan mail Jeff Reynolds COMMENTS Se t" 11 c ion c orrespon d ence s creenmg Does this letter contain commitments? If "yes," identify the commitments with due Yes D

dates in the submittal and in Section Ill and initiate a PCRS LR-LAR to track implementation and/or completion of the commitment. When fleet letters contain No

~

commitments, a PCAS LR-LAA should be initiated with a CA assigned to each applicable site to enter the commitments into the site's commitment management system.

Does this letter contain any information or analyses of new safety issues performed at Yes D

N RC request or to satisfy a regulatory requirement? If "yes," reflect requirement to update the UFSAR in Section Ill.

No

~

Does this letter require any document changes (e.g.. procedures, DBDs, UFSAR. TS Yes D

Bases, etc.), if approved? If "yes," indicate in Section Ill an action for the 1'1l1Sponsible department to determine the affected documents. (The Correspondence Preparer No 12$1 may indicate the specific documents requiring revision, if known or may initiate an action for review.)

Does this letter contain information certified accurate? If "yes," identify the information Yes

~

and document certification in an attachment. (Attachment 9.5 must be used.)

No D

Section Ill Actions and Commitments EN-Ll-106 REV 19

NUCLEAR 0UALITY RELATED EN-Ll-106 REV.19

~Entergy MANAGEMENT MANUAL INFORMATIONAL USE PAGE 2 Of 2 NRC Correspondence ATTACHMENT 9.4 NRC SUBMITTAL REVIEW Required Actions Note: Actions needed upon approval should be captured in the Due Date Responsible Dept.

appropriate action tracking system N/A N/A Commitments Note 1: If the letter contains commitments, a PCRS LR*LAR should be initiated to trar;k. implementation and/or completion.

Due Date Responsible Dept.

Note 2: When fleet letters contain commitments, a PCRS LR-LAR should be initiated with a CA assigned to each applicable site to enter the commitments inlo the site's commitment management system.

N/A NfA Section IV Correspondence Preparer Denrns Pereira Final Submittal Review (optional)

N/A Responsible Department Head Jeff Reynolds EN-Ll-106 REV 19

.Entergy NUCLEAR QUALITY RELATED EN-Ll-106 REV.19 MANAGEMENT MANUAL b.iFOfUIATIONAL USE PAGE 1 OF 1 NRC Correspondence ATTACHMENT 9.5 CERTIFICATION REFERENCE FORM

{Typical}

~~rNumb~:

l~R_B_F_1-_1_B_*D_2_3_9 _____________________ ~

Subject:

I Notification of Spent Fuel Cask Use Certifiable Statement(s): Use one of the following methods to identify certifiable statements in the table below:

1 Identify location in submittal (e.g., page 3, para 2, sentence 1) OR, 2

Paste in the exact words of the statement(s) OR, 3

State "see attachment" and attach a copy of the correspondence with the certifiable statements indicated (e.g.. by redlining, highlighting, or underlining, etc.).

Each statement or section of information being certified should be uniquely numbered to correspond with the supporting documentation listed below.

Objective Evidence or Basis of Peer Review: List the supporting documents in the table below and attach a copy of the documents OR give basis of peer review. Large documents need not be attached.

Certifiable Statement(s)

Objective Evidence or Basis of Peer Review

1.

Cask Certification No.

1.

See attached copy of cask C.o.C.

2.

Cask Model No.

2.

See attached email

3.

Cask identification and service da1e

3.

See attached ICA Transfer Forms

4.
4.
5.
5.

Individual certifying the statement(s): Certification may be documented using e-mail, telecom, "sign off" sheet, or inter-office memorandum. The form of documentation should specifically identify the informat:on being certified.

Dennis Pereira

_l,.icens in g 12/19/2018 Department Date Peer Review: Prior to signing for certification, determine if a Peer Review is required per section S.4[2](c).

Indicate "NIA" if not required.

NIA N/A NIA Name Department Date EN-Ll-106 REV 19

NRCFORM S5f(10-2004)

CERTrFICATE OF COMPUANCE FOR SPENT FUEL STORAGE CASKS U.S. NUCLEAR REGULATORY COMMISSION 10 CFR 72 Page 1

of 5

The U.S. Nuclear Regulatory Commission is issuing this Certificate of Compliance pursuant to Title 10 of 1he Code of Federal Regulalions, Part 72, "Licensing Requirements for Independent Storage of Spent Nuclear Fuel and High-Level Radioactive Waste" (10 CFR Part 72). This certificate is issued In accordance-with 1 o CFR 72.238, certifying that the storage design and contents described below meet the applicable safety standards set forth in 10 CFR Part 72, Subpart L, and on the basis of the Final Safety Analysis Report (FSAR) of the cask design. This certificate is conditional upon fulfilling the requirements of 1 O CFR Part 72, as applicable, and the conditions soecified below.

Certilicale No. I Effective Date I Expiration Date I Docket No. I Amendment No. I Amendment Effective Dale I Package ldenttflcation No.

1014 05/31/00 06/01/20 72-1014 5

July 14, 2008 USA/72-1014 Issued To: (Name/Address)

Holtec International Holtec Center 555 Lincoln Drive West Marlton, NJ 08053 Safety Analysis Report Title Holtec International Final Safety Analysis Report for the HI-STORM 100 Cask Sysiem llf----------,-.,...----------------------**--------ill CONDITIONS This certificate is conditioned upon fulfilling the requirementl of 10 CFR Part 72, a&i\\pplicable, the attached Appendix A (Technical Specifications) and Appendix B (Appro'led Contents and Design Features), and the conditions specified below:

1. CASK
I i1.. '. *
a. Model No.: HI-STClllRM 100 C9tlk Sy~tem

.. r r I

{"

~*i

\\

The H 1-STO RM 1 00 C~k System (the cas~)

  • C0h~e~ of t!J,.following eofllppnents: ( 1 ) interchangeable multipurpose canister*~.(Jw'PCs). which containit~~ fuel; (2) 'a storage QV9'p'ack (HI-STORM), which contains the MPC durin*~:r;,rage; and (3) a transfer cask (HI-TRAC)i,~lch contains the MPC during loading, unloading and trannr operations. The cask stores up to~ pressurized water reactor (PWR) fuel assemblies or 68 boiling water n~ector (BWR) fuel ass(VTlblies.
b. Description The HI-STORM 100 Cask System is certified as described in the Final Safety Analysis Report (FSAR) and in the U.S. Nuclear Regulatory Commission's (NRC) Safety Evaluation Report (SER) accompanying the Certificate of Compliance. The cask comprises three disaete components: the MPC, the HI-TRAC transfer cask, and the HI STORM storage overpack.

The MPC is the confinement system for the stored fuel. It is a welded, cylindrical canister with a honeycombed fuel basket, a baseplate, a lid, a closure ring, and the canister shell. All MPC components that may come into contact with spent fuel pool water or the ambient environment are made entirely of stainless steel except for the neutron absorbers, aluminum seals on vent and cfrain port caps, and aluminum heat conduction elements (AHCEs), which are installed in some early-vintage MPCs. The canister shell, baseplate, lid, vent and cfrain port cover plates, and closure ring are the main confinement boundary components. All confinement boundary components are made entirely of stainless steel. The honeycombed basket, which is equipped with neutron absorbers, provides criticality control.

Pereira, Dennis From:

Morgan, Robert Sent:

To:

Wednesday, December 19, 2018 4:21 PM Pereira, Dennis

Subject:

Re: Notification of Spent Fuel Cask Use 121918.pdf I have reviewed and concur that the letter looks accurate. Furthennore Cask#30 and #31 were HIS TORM I OOS Version B.

Thanks, Robert Morgan Supv, Refueling Services Riverbend Station

-**-----Original message --------

From: "Pereira, Denn is" <dpere i r@e ntcrgy. com>

Date; 12/19/18 4:04 PM (GMT-06:00)

To: "Morgan, Robert" <rmorga4@entergy.com>

Subject:

Notification of Spent Fuel Cask Use 121918.pdf

Robert, See attached and review.

I need your concurrence that the letter is accurate.

I also need you to verify cask were Hi-Storm 1 OOS Version B.

Your reply email will be an attachment that goes along with all the other information.

Thanks, Dennis Pereira Licensing Specialist River Bend Station Office: 225*381-4621 Email: dpereir@entergy.com

~~*\\RIVER BEND 1::~5 TAT ION 1