RBG-47118, Organization Changes
| ML110601186 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf, River Bend |
| Issue date: | 02/22/2011 |
| From: | Lorfing D Entergy Operations |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| RBF1-11-0038, RBG-47118 | |
| Download: ML110601186 (2) | |
Text
Entergya Entergy Operations, Inc.
River Bend Station 5485 U.S. Highway 61 N St. Francisville, LA 70775 Tel 225-381-4157 David N. Lorfing Manager-Licensing February 22, 2011 U. S. Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 RBG-47118 RBF1-11-0038
Subject:
Entergy Organization Changes River Bend Station - Unit 1 Docket No. 50-458 License No. NPF-47 Grand Gulf Nuclear Station - Unit 1 Docket No. 50-416 License No. NPF-29 Entergy Operations, Inc. (Entergy) has announced organization changes at River Bend Station (RBS) and Grand Gulf Nuclear Station (GGNS). Effective February 27, 2011, the following changes are being made:
Michael Perito will be the GGNS Site Vice President Eric W. Olson will be the RBS Site Vice President Barry L. Cox will be the RBS General Manager, Plant Operations Should you have any questions, please contact me.
DNL/wjf ODco
Entergy Organization Changes RBG-47118 Page 2 of 2 cc:
U.S. Nuclear Regulatory Commission Region IV 612 E. Lamar Blvd., Suite 400 Arlington, TX 76011 NRC Resident Inspector PO Box 1050 St. Francisville, LA 70775 Mr. Alan Wang, Project Manager U.S. Nuclear Regulatory Commission MS O-8G14 11555 Rockville Pike Rockville, MD 20852-2738 Ms. Christina Perino Manager, Licensing Grand Gulf Nuclear Station G-ADM2-LIC NRC Resident Inspector PO Box 399 Port Gibson, MS 39150 1