RBG-24238, Monthly Operating Rept for Jul 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1986
ML20206N579
Person / Time
Site: River Bend Entergy icon.png
Issue date: 07/31/1986
From: Booker J, Fredieu A
GULF STATES UTILITIES CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
RBG-24238, NUDOCS 8608260320
Download: ML20206N579 (5)


Text

DOCKEf NO. 50/458 RIVER BDD STATICN UNIT 1 REPORP NO.

R-86-007 DATE AUGUST 11, 1986 (XNPLEITD BY A.O. Fredieu TITLE Asst. Ops Supv TELEPHCNE 635-6094 X2557 ITNIH JULY 1986 DAY AVERAGE DAILY PWER LEVEL DAY AVERAGE DAILY P WER LEVEL (M4e-Net)

(MWe-Net) 1.

0 17.

224 2.

0 18.

763 3.

0 19.

826 4.

0 20, 922 5.

0 21.

910 6.

0 22.

920 7.

0 23.

924 8.

114 24.

929 9.

0 25.

922 10.

0 26.

922 11.

262 27.

918 12.

739 28.

918 13.

61 29.

930 14.

0 30.

824 15.

0 31.

704 16.

0 4-l it l

Based on GSU dispatch.

8608260320 860731 PDR ADOCK 05000458 R

PDR

DOCKET NO.

50/458 RIVER BDD STATIM UNIT 1 REPORP NO.

R-86-007 DATE AUGUST 11, 1986 CWPIEITD BY A.O. Fredieu TITLE Asst. Ops Supv TELEPHCNE 635-6094 X2557 PAGE 1

OF 2

OPERATING STA'IUS 1.

REPORTING PERIN: JULY, 1986 GROSS HOURS IN REPORPING PERICD:

744 2.

CURRENTLY AIIIYiORIZED POWER LEVEL (Mwt):

2894 MAX. DEPEND CAPACITY (We-Net):

N/A DESIGN ELECTRICAL RATING (Mwe-Net):

936 3.

POWER LEVEL 'IO MIICH RESTRICITD (IF ANY) (MWe-Net) :

N/A 4.

REASNS EUR RESTRICTIN (IF ANY):N/A THIS YR 'IO CINU-MONIYI DATE IATIVE 5.

NIEBER OF HOURS REACIOR WAS CRITICAL...

469.5 3196.9 4367.3 6.

REACIOR RESERVE SHtfIDOWN HOURS.........

0 0

0 7.

HOURS GENERA'IOR ON LINE...............

400.32 2,625.8 2781.9 8.

UNIT RESERVE SHITfD06@l HOURS............

0 0

0 t

9.

GROSS 'IIIERMAL ENERGY GENERATED (Mel).. 1,076,579 4,762,785 4,917,705

10. GROSS ELECTRICAL ENERGY GENERATED (mil) 353,301.35 1,559,210.8 1,578,570.8
11. NEP ELECTRICAL ENERGY GENERATED (MWH). 329,568 1,421,244 1,438,744 r

i j

DOCKE7f NO. 50/458 RIVER BEND S'IATION UNIT 1 REPORT NO.

R-86-007 Rev. 1 DATE AUGUST 11, 1986 CCMPLETED BY A.O. Fredieu TITLE Asst. Ops Supv TELEPHONE 635-6094 X2557 PAGE 2

OF 2

OPERATING STA'IUS THIS YR 'IO CUMU-ITNIH DATE IAT1VE

12. REACIOR SERVICE FPCIOR...........

63.1 67.7 67.7

13. REACIOR AVAIIABILITY FACIOR......

63.1 67.7 67.7

14. UNIT SERVICE FACIOR..............

53.8 54.1 54.1

15. UNIT AVAIIABILITY FACIOR.........

53.8 54.1 54.1

16. UNIT CAPACITY F7CIOR (Using MDC)

N/A N/A N/A

17. UNIT CAPACITY F7CIOR (Using Design MNe) 47.3 48.1 48.1
18. UNIT EDICED OWAGE RATE..........

46.2 45.9 45.9

19. SHUPDOWNS SCHEDULED OVER NEXT 6 MONIUS (TYPE, DATE, AND DURATION OF EACH):

'Ibrbine torsional vibration test, August 15, 1986, 12 days.

Iocal leak rate testing, October 4, 1986, 4 weeks.

20.

IF SHUIDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STAR'IUP:

21. UNITS IN TEST STA'IUS (PRIOR 'IO CONEBCIAL OPERATION):

FORECAST POIIEVED INITIAL CRITICALITY N/A 10-31-85 0037 INITIAL ELECTRICITY N/A 12-03-85 0344

  • CONEFCIAL OPERATION N/A 6-16-86
  • Ccmpletion of S/U testing and proposed date for declaration of in-service before the Public Utility Ccmission of Texas.

UNIT SHUIDChNS AND POWER REDUCTIWS TIME TIME I

START RECOVER OF FRCN DURATICN TYPE REASW METflKD NO DATE OCCURRENCE OCCURRENCE (HOURS)

NOTE (1)

NOTE (2)

NOTE (3)

CORRECTIVE ACTIWS/CO MENTS 1

860701 0000 0056 168.93 F

A 1

1.

Continued frcan July outage to 860707 repair EHC line leak and testable check valve leak in drywell.

2 860708 1224 0310 71.85 F

A 3

2.

MSR drain tank manway gasket 860711 blew out. Turbine Building high area tarperature/MSIV isolation and reactor scram.

3 860713 0310 1004 102.9 F

A 3

3.

Steam Seal Evaporator level 860717 control failed to maintain level.

Ioss of steam seals to main turbine resulted in loss of vacuun, turbine trip and reactor scram.

SUlHARY:

NOTE (1) TYPE OF OCCURRENCE: ENTER CODE DOCKET NO. 50/458 F: EORCED RIVER BEND STATICN UNIT 1 S: SCHEDULED REPORP NO.

R-86-007 IKTTE (2) REASW FOR OOCURRENCE: ENTER CODE A: EQUIPMENP FAILURE (EXPIAIN IN CORRECTIVE ACTIWS/CONENTS)

REPORT MCNIH JULY, 1986 B: MAINTENANCE OR TEST C: REFUELING DATE August 11, 1986 D: REGUIA'IORY RESTRICTIN E: OPERA'IOR TRAINING AND LICENSE EXAMINATION A.O. Fredieu F: ADMINISTRATIVE CWPIEfED BY (PRINT)

G: OPERATICNAL ERROR (EXPIAIN IN CORRECTIVE ACTICNS/COMENTS)

/m/ [2 2[

H: OTHER (EXPIAIN IN CuoeLTIVE ACTIWS/COMENIS)

V IGNA'IURE NOTE (3) ME7ffKD OF SHUI'fING DOWN REACIOR OR REDUCING POWER: ENTER CODE 1: MANUAL Asst. Operations Supervisor 2: MANUAL SCRAM TITLE 3: AUIM ATIC SCRAM 4: OIEER (EXPIAIN IN COloci;nVE ACTIONS /COMENTS)

TELEPHWE 635-6094 X2557 FORM-S0t-024 REV. O

e e

GULF STATES UTILITIES COMPANY RIVER BEND STATION POST OFFICE BOX 220 ST FRANCISVILLE. LOUIStANA 70775 AREA CODE 504 635 6094 346 8651 August 19, 1986 RBG-24238 File Nos. G9.5, G9.25.1.5 Mr. Ronald M.

Scroggins Director, Office of Resource Management U.

S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Scroggins:

River Bend Station - Unit 1 Docket No. 50-458 Enclosed is Gulf States Utilities Company's Monthly Operating Report for July 1986 for River Bend Station (RBS) - Unit 1.

This report is submitted in accordance with RBS Technical Specification 6.9.1.6.

Sincerely, Q

J.

E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group

.94

^

JEB/ ERG /

S/je Enclosure cc: Regional Administrator U.

S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 U. S. NRC Document Control Desk 4

S

) ;

_.