RBG-23893, Monthly Operating Rept for May 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for May 1986
ML20205D660
Person / Time
Site: River Bend 
Issue date: 05/31/1986
From: Booker J, Fredieu A
GULF STATES UTILITIES CO.
To: Scroggins R
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
RBG-23893, NUDOCS 8608180129
Download: ML20205D660 (5)


Text

,

DOCKET NO.

50/458 RIVER BEND STATION UNIT 1 REPORT NO, R-86-005 DATE June 5, 1986 COMPLETED Bfp A. O. Fredieu [

TITLE Asst. Operations Supv.

TELEPHONE 635-6094 xzs3/

Attachment III page 1 of 2 OPERATING STATUS 1.

REPORTING PERIOD:

May 1986 GROSS HOURS IN REPORTING PERIOD:

2.

CURRENTLY AUTHORIZED POWER LEVEL (Mwt):

2894 MAX.

DEPEND. CAPACITY (%'e-Net):

0 DESIGN ELECTRICAL RATING (.We-Net):

936 3.

POWER LEVEL TO WHICH RESTRICTED (IF ANY) (MWe-Net):

4.

REASONS FOR RESTRICTION (IF ANY): N/A THIS YR TO CUMU-MONTH DATE LATIVE 5.

NUMBER OF HOURS REACTOR WAS CRITICAL.... ug.,

2171.4 3248.5 6.

REACTOR RESERVE SHUTDOWN HOURS..........

N/A N/A N/A I

7.

HOURS GENERATOR ON LINE............... 599.5 1747.2 1903.3 8.

UN?? RESERVE SHUTDOWN HOURS............

0 0

0 9.

GROSS THERMAL ENERGY GENERATED (MWH).... 1,459,141 2,710,652 2,840,580 10.

GROSS ELECTRICAL ENERGY ' GENERATED (L'H). 483919.91 810816.91 830176.91 445604.31 727849.61 745349.61 11.

NET ELECTRICAL ENERGY GENERATED (MWH)...

8608180129 860531 i

PDR ADOCK 05000458 l

l R

PDR l

DOCKET NO.

50/458 RIVER BEND STATION UNIT 1 REPORT NO.

R-86-005 PAGE 2

op 5

I OPERATING STATUS THIS YR TO CLHU-MONTH DATE LATIVE 12.

REACTOR SERVICE FACTOR........... " A

^

13.

REACTOR AVAILABILITY FACTOR...... N/A N/A N/A 14.

UNIT SERVICE FACTOR.............. N/A N/A N/A 15.

UNIT AVAILABILITY FACTOR.........

A

^

16.

UNIT CAPACITY FACTOR (Using MDC)..

17.

UNIT CAPACITY FACTOR (Using Design MWe)

N/A N/A N/A 18.

UNIT FORCED OUTAGE RATE...........

N/A N/A N/A 19.

SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, AND DURATION OF EACH):

August 9 - 16 DAYS TO REiOVE -

STRAINERS 20.

IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A 21.

UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION)

FORECAST ACHIEVED INITIAL CRITICALITY N/A 10-31-85 0037 INITIAL ELECTRICITY N/A 03 4

  • COMMERCIAL OPERATION 6/86 N/A
  • Completion of Startup Test Program and unit eligible for commercial operation.

- - +.-

---,-----n c

UNIT SHUTDOWNS AND POWER REDUCTIONS TIME TIME CORRECTIVE ACTION 5/ COMMENTS START REC 0VER 1.

Recirc flow transmitters exper-0F FROM DURATION TYPE REASON METHOD iencing excessive noise. APRM B & F NO DATE OCCURRENCE OCCURRENCE (HOURS)

NOTE (1)

NOTE (2)

NOTE (3) placed in trip condition during maint, on respective flow trans-1 05/01 1331 2114 55.72 F

H 3

mitters. Spurious trips on APRM A &

5/03 E occurred related to excessive noise spikes in their flow instru-ments.

2 05/05 0249 0230 23.68 F

A 3

2.

Scram on high pressure due to 5/06 turbine runback on loss of stator cooling water 3.

Turbine trip on false high vibrations.

Found water around 3

05/19 1420 0543 15.38 F

H 3

  1. 3BRG vibration detector from 5/20 earlier inadvertent actuation of I

fire protection delu ge system.

4 05/29 2215 2400 49.75 S

B 3

4 1-ST-27 turbine trip and 5/31 generator load reject planned startup test.

NY:

NOTE (1) TYPE OF OCCURRENCE:

ENTER CODE DOCKET NO. 50/458 F:

FORCED RIVER BEND STATION UNIT 1 S:

SCHEDULED REPORT NO. R-86-005

< NOTE (2) REASON FOR OCCURRENCE:

ENTER CODE A: EQUIPMENT FAILURE (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

REPORT MONTH May 30, 1986 B: MAINTENANCE OR TEST C:

REFUELING DATE June 5, 1986 D:

REGULATORY RESTRICTION E:

OPERATOR TRAINING AND LICENSE EXAMINATION A.0. Fredieu F: ADMINISTRATIVE COMPLETED BY (PRINT)

[h G: OPERATIONAL ERROR (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS) e

' Om,, /Ac /g /,

l H: 0THER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

[f y1ATURE l NOTE (3) METHOD OF SHUTTING DOWN REACTOR OR REDUCING POWER:

ENTER CODE j

1: MANUAL Asst. Operations Supervisor 2: MANUAL SCRAM TITLE l

3: AUTOMATIC SCRAM 4: 0THER (EXPLAIN IN CORRECTIVE ACTIONS / COMMENTS)

TELEPHONE 635-6094 X2557 FORM-SOM-024 m

DOCKET N0. 50/458 RIVER BEND STAT 10N UNIT 1 REPORT N0.

R-86-005-Rev. 1 DATE Junt 17, 1986 COMPLETED BY A.O. Fredieu TITLE Asst. Ops Su Lv TELEPHONE 635-6094 X2557 MONTH MAY 1986 DAY AVERAGE DAILY PCWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1.

314 17.

460 2.

0 18.

602 3.

0 19.

378 4.

502 20.

286 5.

43 21.

674 6.

372 22.

824 7.

594 23.

868 8.

855 24.

879 9.

876 25.

907 10.

849 26.

803 11.

926 27.

910 12.

928 28.

876 13.

931 29.

872 14.

931 30.

0 15.

713 31.

0 16.

588

e-a f

GULF STATES UTILITIES COMPANY R:VER BEND STATION POST OFFICE PGX 220 ST. F RANCISVILLE. LOU 65tANA 70775 ARE A CODE 504 6?,5 6094 546-8651 June 15, 1986 RBG-238 93 File Nos. G9.5, G9.25.1.5 Mr. Ronald M. Scroggins Director, Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Scroggins:

River Bend Station - Unit 1 Docket-No. 50-458 Enclosed'is Gulf States. Utilities Company's Monthly Operating Report for May 1986 for River Bend Station (RBS).

This report is submitted in accordance with RBS Technical Specification 6.9.1.6.

Sincerely,4

.f6; J.

E. Looker Manager-Engineering Nuclear Fuels & Licensing River Bend Nuclear Group JEB/