Text

LaSalle County Station Exelon Generation 2601 North 21 ' Road Marseilles, IL 61341 815-415-2000 Telephone www.exeloncorp com RA17-100 10 CFR 50.4 December 27, 2017 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 LaSalle County Station, Units 1 and 2 Renewed Facility Operating License Nos. NPF-11 and NPF-18 NRC Docket Nos. 50-373 and 50-374

Subject:

2016 Regulatory Commitment Change Summary Report The purpose of this report is to provide the Exelon Generation Company, LLC (EGC),

"2016 Regulatory Commitment Change Summary Report," for LaSalle County Station commitment changes processed during the period of January 1, 2016 through December 31, 2016. The enclosed commitment changes were found to meet the criteria for inclusion in the annual Commitment Change Summary Report. Revisions to docketed correspondence were processed using the Nuclear Energy lnstitute's (NEI) 99-04, "Guidelines for Managing NRC Commitment Changes," Revision 0, dated July 1999.

Should you have any questions concerning this letter, please contact Mr. Guy V. Ford Jr., Regulatory Assurance Manager, at (815) 415-2800.

m~*-

Harold T. Vinyard Plant Manager LaSalle County Station

Enclosure:

2016 Regulatory Commitment Change Summary Report cc: Regional Administrator - NRC Region Ill NRC Senior Resident Inspector - LaSalle County Station

2016 Regulatory Commitment Change Summary Report Commitment Date of Original Document Original Changed Basis for Change Change Commitment Commitment Commitment Tracking No. Change 16-001 04/21/2016 Letter from K. R. Jury EGC will revise This commitment is The requirements of GL 2008-01 (Exelon Generation periodic venting no longer required have been addressed as part of TS Company, LLC) to procedures for the based on Surveillance Requirements (SRs)

U.S. NRC, "Nine- GL 2008-01 subject implementation of through implementation Technical Month Response to systems to include Unit 1 and Unit 2 Specification Task Force {TSTF) -

Generic Letter 2008- enhanced Technical 523. Implementation of TSTF-523 01," dated October 14, acceptance criteria Specification (TS) revised SR 3.4.9.2, 3.4.10.2, 3.5.1.1, 2008. and requirements to Amendment Nos. 3.5.1.2, 3.5.2.3, 3.5.2.4, 3.5.3.1, perform UTs on a 214 and 200, 3.5.3.2, 3.6.2.3.3, 3.6.2.4.3, 3.9.8.2, graded approach as respectively. The and 3.9.9.2 to verify locations part of the venting TS amendments susceptible to gas accumulation are verifications of were issued sufficiently filed with water.

acceptable high June 19, 2015.

points.