PY-CEI-NRR-1185, Monthly Operating Rept for May 1990 for Perry Unit 1
| ML20043G119 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 05/31/1990 |
| From: | Hegrat H, Lyster M CENTERIOR ENERGY |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| PY-CEI-NRR-1185, NUDOCS 9006190085 | |
| Download: ML20043G119 (6) | |
Text
i I
.(:
6200 0ak Tree Boulevard Mod Address Independence OH -
PO Box 94661 216 447 3100 Cleveland.OH 44101-4661 June 15, 1990 PY-CEI/NRR-1185 L l
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.
20555 Perry Nuclear Power Plant-Docket No. 50-440 Monthly Operating Report Dear Sir Attached is the May 1990 Honthly Operating Report for Perry Unit 1.
This report is submitted in accordance with Technical Specification 6.9.1.8.
i If there are any questions, please feel free to call.
i Since y,
/-
Michael D. Lyster Vice President, Nuclear - Perry MDL:njc-j 1
Attachment cci T. Colburn USNRC Senior Resident Inspector - Perry USNRC, Region III Director, Office of Resource Management 9006190085 900531 PDR ADOCK 05000440 R
PDC Operat ng Companies i
Cleveland Electnc liluminating Toledo Edison
}
(
o CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POVER PLANT May 1, 1990 - May 31, 1990 MONTHLY OPERATING REPORT TO NRC l
DOCKET NUMBER : 50-440 LICENSE NUMBER: NPF-58 1
l l
1 l
l
r, i
Table of contents i
Average Daily Unit Power Level,,,,,,,,,,,,,,,,,,,, i j
Operating Data Report.
2 e
Unit Shutdowns and Power Reductions................-.
3 i
t I
i i
i s
N k
l l
l l
t i
Average Daily Unit Power Level DOCKET NO.
50-440 UNIT Perry-1 DATE 06/15/90 Contact H.L. Hegrat Telephone (216)259-3737 HONTH May 1990 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MVe-Net)
(MWe-Net) 1 1184 17 1184 2
1192 18 1190 3
1192 19 1171 4
1191 20 1168 5
1193 21 1192 6
1184 22 1192 7
1188 23 1191 8
1182 24 1189 9
1181 25 1186 10 2188 26 1186 11 1194 27 1144 12 1193 28 1104 13 1147 29 1169 14 1191 30 1191 15 1184 31 1189 16 1180 l
l l
p
.q
+ ^
Operating Data Report UNIT:
PERRY-1 DATE: __06/15/90 OPERATING STATUS 1.
Docket:
50-440 2.
Reporting Period:
May 1990 3.
Utility
Contact:
H.L. Hegrat (216) 259-3737 4.
Licensed Thermal Power (MVt):
3579 5.
Nameplate Rating (Gross MVe):,
1250 6.
Design Electrical Rating (Net MVe):
1191 7.
Maximum Dependable Capacity (Gross MVe):
1200 8.
Maximum Dependable Capacity (Net MVe):
1141 9.
If changes occur in capacity ratings (Item Numbers 4 through 8) since last report, give reasons:
N/A
- 10. Power Level To Which Restricted, If Any (Net MWe):
100%
- 11. Reasons for Restrictions, If Any:
Technical Specification Limit This Month Yr-to-Date Cumulative
- 12. Hours In Reporting Period 744.0 3,623.0 22,211.0
- 13. Hours Reactor Vas Critical 744.0 3,415.2 16,162.7
- 14. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
- 15. Hours Generator On-Line 744.0 3,371.8 15,590.3
- 16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 17. Gross Thermal Energy (MVH) 2,644,403 11,794,161 52,918,489
- 18. Gross Electrical Energy (MVH) 919,793 4,113,281 18,253,738
- 19. Net Electrical Energy (MVH) 878,694 3,924,386 17,310,479
- 20. Unit Service Factor 100.0%
93.1%
70.2%
- 21. Unit Availability Factor 100.0%
93.1%
70.2%
- 22. Unit Capacity Factor (Using MDC Net) 103.5%
94.9%
68.3%
- 23. Unit Capacity Factor (Using DER Net) 99.2%
90.9%
65.4%
- 24. Unit Forced Outage Rate 0.0%
2.1%
9.1%
-~
- 25. Forced Outage Hours 0.0 72.0 1,558.9
- 26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Second refuel outage scheduled to commence on September 7, 1990 for 76 days.
- 27. If Shut Down at end of Report Period, Estimated Date of Startupt N/A l
NJC/ FORM /2255 1'
l
~
llNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-440 tlNIT NAME Perry-1 DATE 06/15/90 REPORT MONTH May 1990 CONTACT H.
L.
Hegrat TELEPfl0NE (2161 259-3737 E
.c ce o ee Cause & Corrective og g,,c, o Licensee g,
og Action to No.
Date Q
gg j gy Event g4 gj a
yj g gjg Report i g.g gu Prevent Recurrence H
.ov x to o
o D
l i
NOT APPLICABLE i
4 f
I i
i SIRE 4ARY: During May 1990, Perry-1 operated at full power with no plant outages or significant power reductions.
1 I
I 2
3 4
F: Forced Reason:
Method:
Exhibit C - Instructions l
S: Scheduled A-Equipment Failure (Explain) 1-Hanual for Preparation of Data l
B-Haintenance or Test 2-Manual Scram Entry Sheets for Licensee 6
l C-Refueling 3-Automatic Scram Event Report (LER) File (NUREC j
D-Regulatory Restriction 4-Cnntinued 1022) i E-Operator Training &
S,-Redisced Load License Examination 9-Other Exhibit I-Same Source F-Administrative r
C-Operational Error (Explain) l H-Other.(Explain) l
...