i I

.(:

6200 0ak Tree Boulevard Mod Address Independence OH -

PO Box 94661 216 447 3100 Cleveland.OH 44101-4661 June 15, 1990 PY-CEI/NRR-1185 L l

U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant-Docket No. 50-440 Monthly Operating Report Dear Sir Attached is the May 1990 Honthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

i If there are any questions, please feel free to call.

i Since y,

/-

Michael D. Lyster Vice President, Nuclear - Perry MDL:njc-j 1

Attachment cci T. Colburn USNRC Senior Resident Inspector - Perry USNRC, Region III Director, Office of Resource Management 9006190085 900531 PDR ADOCK 05000440 R

PDC Operat ng Companies i

Cleveland Electnc liluminating Toledo Edison

}

(

o CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POVER PLANT May 1, 1990 - May 31, 1990 MONTHLY OPERATING REPORT TO NRC l

DOCKET NUMBER : 50-440 LICENSE NUMBER: NPF-58 1

l l

1 l

l

r, i

Table of contents i

Average Daily Unit Power Level,,,,,,,,,,,,,,,,,,,, i j

Operating Data Report.

2 e

Unit Shutdowns and Power Reductions................-.

3 i

t I

i i

i s

N k

l l

l l

t i

Average Daily Unit Power Level DOCKET NO.

50-440 UNIT Perry-1 DATE 06/15/90 Contact H.L. Hegrat Telephone (216)259-3737 HONTH May 1990 i

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MVe-Net)

(MWe-Net) 1 1184 17 1184 2

1192 18 1190 3

1192 19 1171 4

1191 20 1168 5

1193 21 1192 6

1184 22 1192 7

1188 23 1191 8

1182 24 1189 9

1181 25 1186 10 2188 26 1186 11 1194 27 1144 12 1193 28 1104 13 1147 29 1169 14 1191 30 1191 15 1184 31 1189 16 1180 l

l l

p

.q

+ ^

Operating Data Report UNIT:

PERRY-1 DATE: __06/15/90 OPERATING STATUS 1.

Docket:

50-440 2.

Reporting Period:

May 1990 3.

Utility

Contact:

H.L. Hegrat (216) 259-3737 4.

Licensed Thermal Power (MVt):

3579 5.

Nameplate Rating (Gross MVe):,

1250 6.

Design Electrical Rating (Net MVe):

1191 7.

Maximum Dependable Capacity (Gross MVe):

1200 8.

Maximum Dependable Capacity (Net MVe):

1141 9.

If changes occur in capacity ratings (Item Numbers 4 through 8) since last report, give reasons:

N/A

10. Power Level To Which Restricted, If Any (Net MWe):

100%

11. Reasons for Restrictions, If Any:

Technical Specification Limit This Month Yr-to-Date Cumulative

12. Hours In Reporting Period 744.0 3,623.0 22,211.0
13. Hours Reactor Vas Critical 744.0 3,415.2 16,162.7
14. Reactor Reserve Shutdown Hours 0.0 0.0 0.0
15. Hours Generator On-Line 744.0 3,371.8 15,590.3
16. Unit Reserve Shutdown Hours 0.0 0.0 0.0
17. Gross Thermal Energy (MVH) 2,644,403 11,794,161 52,918,489
18. Gross Electrical Energy (MVH) 919,793 4,113,281 18,253,738
19. Net Electrical Energy (MVH) 878,694 3,924,386 17,310,479
20. Unit Service Factor 100.0%

93.1%

70.2%

21. Unit Availability Factor 100.0%

93.1%

70.2%

22. Unit Capacity Factor (Using MDC Net) 103.5%

94.9%

68.3%

23. Unit Capacity Factor (Using DER Net) 99.2%

90.9%

65.4%

24. Unit Forced Outage Rate 0.0%

2.1%

9.1%

-~

25. Forced Outage Hours 0.0 72.0 1,558.9
26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Second refuel outage scheduled to commence on September 7, 1990 for 76 days.

27. If Shut Down at end of Report Period, Estimated Date of Startupt N/A l

NJC/ FORM /2255 1'

l

~

llNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-440 tlNIT NAME Perry-1 DATE 06/15/90 REPORT MONTH May 1990 CONTACT H.

L.

Hegrat TELEPfl0NE (2161 259-3737 E

.c ce o ee Cause & Corrective og g,,c, o Licensee g,

og Action to No.

Date Q

gg j gy Event g4 gj a

yj g gjg Report i g.g gu Prevent Recurrence H

.ov x to o

o D

l i

NOT APPLICABLE i

4 f

I i

i SIRE 4ARY: During May 1990, Perry-1 operated at full power with no plant outages or significant power reductions.

1 I

I 2

3 4

F: Forced Reason:

Method:

Exhibit C - Instructions l

S: Scheduled A-Equipment Failure (Explain) 1-Hanual for Preparation of Data l

B-Haintenance or Test 2-Manual Scram Entry Sheets for Licensee 6

l C-Refueling 3-Automatic Scram Event Report (LER) File (NUREC j

D-Regulatory Restriction 4-Cnntinued 1022) i E-Operator Training &

S,-Redisced Load License Examination 9-Other Exhibit I-Same Source F-Administrative r

C-Operational Error (Explain) l H-Other.(Explain) l

...