5

/

CLEVELAND ELECTRIC ILLUNINATING COMPANY PERRY NUCLEAR POWER PLANT FEBRUARY'1, 1988 - PEBRUARY 29, 1988 N0ffrHLY OPERATING REPORT TO NRC DOCKET NUMBER: 50-440,

LICENSE NUMBER: NPF-58 1

^

N 8803210471 880229 PDR ADOCK 05000440 R

DCD I

b

s.

Table of Contents Average Daily Unit Power Level................. 1 Operating Data Report.

.2 Unit Shutdowns and Power Reductions.....

.3 l

l r

l l

l l

I l

r I

l l

l L

w Avarrgt Daily Unit Pov;r-Leval-DOCKET NO.

50-440 UNIT Perry-One DATE 3/15/88 Contact G.A.Dunn Telephone (216)259-3737 1

MONTH February 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MVe-Net)

(MWe-Net) 1 1132 17 1185 2

1120 18 1187 3-1148 19 1185

.4 1047 20 1189 5

359 21 1175 6

1152 22 434 s

7 1139 23 0

'8 1161 24 0

9 1130 25 0

10 1130 26 0

11 1146 27 645 12 1156 28 1182 13 1123 29 1176 14 948 30 N/A

~

15 1176-31 N/A 16 1183 INSTRUCTIONS On this form list the average daily unit power level in HVe-Net for each-day in the reporting month. Compute to the nearest whole megavatt.

'h

.0 pirating Dats R:psrt UNIT:

Perry - 1 DATE:

3/15/88 OPERATING STATUS 1.

Docket:

50-440 2.

Reporting Period:

February 1988 3.

Utility contact:

G.A. Dunn (216) 259-3737 4.

Licensed Thermal Power (MVt):

3579

5.'

Nameplate Rating (Gross MVe):

1250 6.

Design Electrical Rating (Net HVe): 1205 7.

Maximum Dependable Capacity (Gross MVe):

1250 (Estimated) 8.

Maximum Dependable Capacity (Net MVe):

1205 (Estimated) 9.

If Changes Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report, Give Reasons:

None

10. Power Level To Vhich Restricted, If Any (Net MVe):

100%

11. Reasons for Restrictions, If Any:

Technical Specification Limit This Month Yr-to-Date Cumulative

12. Hours In Reporting Period 696 1440 2,484
13. Hours Reactor Vas Critical 618 781.5 1,592.8
14. Reactor Reserve Shutdown Hours 0

0 0

15. Hours Generator On-Line 579.2 697.3 1,470.7
16. Unit Reserve Shutdown Hours 0

0 0

17. Gross Thermal Energy (MVH) 1,952,066 2.249,167 4,810,686
18. Gross Electrical Energy (MWH) 672,589 770,743 1,649,205
19. Net Electrical Energy (MVH) 636,554 718,425 1,546,909
20. Unit Service Factor.

83.2 48.4 53.1

21. Unit Availability Factor 85.2 48.4 53.1
22. Unit Capacity Factor (Using HDC Net) 76.2 42.2 52.3
23. Unit Capacity Factor (Using DER Net) 76.2 42.2 52.3
24. Unit Forced Outage Rate 16.8 14.3 20.8
25. Forced Outage Hours 116.8 116.8 387.4
26. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

None 27.

If Shut Down at end of Report Period, Estimated Date of Startup:

N/A

UNIT SHUTDOWNS AND. POWER REDUCTIONS DOCKET NO. 50-440 UNIT NAME Perry - Unit I REPORT HONTH February 1988 DATE.3 /15 / %

CONTACT Gree Dunn TELEPilONE (216) 250-3737

%4 o

o C

N O et u C

j 1

0Q g,,5g Licensee L

g Cause & Corrective l

Co.

Date R

yy y jy Event g4 y

Action to gj y yjg Report #

,. j go Prevent Recurrence H

OV MM U

on 1

2-5-88 F

7.0 A

9 Nil VLV Generator taken of f line to repair turbine solve hydraulic 1.eak due to failed "O"

ring.

Disassembled, replaced "O" ring & re-assembled.

2 2-13-88 F

0 A

5 Nz5 IITRS Reduction in power to repair flange leak on fligh Pressure Heater Level transmitter.

Disassembled, replaced gaskets & re-assembled.

3 7-22-88 F

109.8 A

1 N27 VLV Rx shutdown to repair IN27-F560A which exhibited excessive leakge in drvwell. Reworked seal retaining device to eliminate body to bonnet seal-ring leak.

SUMMARY

Perry-1 Experienced 2 forced outages and I power reduction in February for reasons stated above.

I F:

Forced Reason:

Hethod:

Exhibit G - Instructions 5: Scheduled A-Equipment Failure (Explain) l-Manual for Preparation of Data B-Haintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREC D-Regulatory Restriction 4-Continued 1022)

E-Operator Training &

5.-Reduced Load License Examination 9-other 5Exhibit 1-Same Source F-Administrative G-Operational Error (Explain)

H-Other (Explain)

THE~ CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. DOX 97 e

PERRY. OHf0 44081 e

TELEPHONE (216) 259-3737 e

ADDRESS-1o CENTER ROAD Serving The Best Location in the Nation PERRY NUCLEAR POWER PLANT Al Kcplan March 15,1988 PY-CEI/NRR-0826 L m,,,

NUCLEAR GROUP U.S. Nuclear Regulatory Commission y

Document Control Desk Washington, D.C.

20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report

Dear Sir:

Attached is the February 1988 Monthly Operating Report for Perry Unit 1.

This report is submitted in accordance with Technical Specification 6.9.1.8.

Please feel free to contact me if you have any questions.

Very truly yoursi G

J Al Kaplan Vice President Nuclear Group AK cab Attachment ec:

T. Colburn K. Connaughton USNRC, Region III Director, Of fice of Resource Management 4

s

.