CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT JANUARY 1, 1988 - JANUARY 31, 1988 MONTHLY OPERATING REPORT TO NRC DOCKET NUMBER:- 50-440 LICENSE NUMBER: NPF-58 4

l i

l I

gg22gock$ 1 $i I

R '

-V-r +.,-r- - - - -

,--,.m, _ _v_.,------- -----,.<r,, r w w.. . ,,-,-%2.e,s,..---.--m..-, - - . , , -

t

?

Table of Contents Average Daily Unit Power Level . . . . . . . . . . . . . . . . 1 Operating Data Report. . . . . . . . . . . . . . . . . . . . . .2 Unit Shutdowns and Power Reductions. . . . . . . . . . . . . . .3 l

.Avarigs Daily Unit Prv2r Leval

?

DOCKET NO. 50-440-UNIT Perry-One DATE- 2/15/88

_ Contact -G.A.Dunn Telephone. -(216)259-3737 MONTH January 1988 DAY AVERAGE DAILY POVER LEVEL .M ~ AVERAGE DAILY POVER LEVEL (MWe-Net) (MWe-Net)-

1 1124 17 0 ,

2 1124 18 0 i 3 115 19 0 ,

4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0  !

8 0 24 0 9 0 25 0- ,

10 0 26 0 11 0 27 0 12 0 28 0  !'

13 0 '

29 69 14 0 30 437  ;

15 0 31 968 i 16 0 l

. INSTRUCTIONS

{

On this form list the average daily unit power level in MVe-Net for each ,

day in the reporting month. Compute to the nearest whole megavatt. '

i l

i h

l; s

4 I

Operating Dr.to Rspert 4

DOCKET NO. 50-440 DATE 2/15/88 CONTACT G.A.Dunn TELEPHONE (216)259-3737 OPERATING STATUS

1. Unit Name Perry-One
2. Reporting Period: January 1988
3. Licensed Thermal Pover (MVt): 3579
4. Nameplate Rating (Gross MVe): 1250
5. Design Electrical Rating (Net MWe): 1205
6. Maximum Dependable Capacity (Gross MVe): 1250 (Estimated)
7. Maximum Dependable Capacity (Net MVe): 1205 (Estimated)
8. If Changes occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report, Give Reasons:

None 1

9. Pover Level To Vhich Restricted, If Any (Net MVe): 100%
10. Reasons for Restrictions, If Any: Technical Specification Limit-This Month Yr-to-Date Cumulative
11. Hours In Reporting Period 744 744 1,788
12. Hours Reactor Vas Critical 163.5 163.5 974.8
13. Reactor Reserve Shutdovn Hours 0 0 0
14. Hours Generator On-Line 118.14 118.14 891.54
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy (MVH) 297,101 297,101 2,858,620
17. Gross Electrical Energy (MVH) 98,154 98,154 976,616
18. Net Electrical Energy (MVH) 81,871 81,871 910,355
19. Unit Service Factor 15.9 15.9 49.9
20. Unit Availability Factor 15.9 15.9 49.9
21. Unit Capacity Factor (Using MDC Net) 9.1 9.1 42.3 '
22. Unit Capacity Factor (Using DER Net) 9.1 9.1 42.3
23. Unit Forced Outage Rate 0 0 23.3
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): i None - March outage cited in previous report is under evaluation for l rescheduling due to scope of work completed during January outage.
25. If Shut Down at eo of Report Period, Estimated Date of Startup: i N/A )

l I

l l

l I

4 UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-440 UNIT NAME Perry-One .

REPORT HONTil January, 1988 DATE- 2/15/88 CONTACT G.A. Dunn TELEPIIONE (216) 259_3))7 w

'7. u c ca o ocoo c em Cause & Corrective e

o^

m c

o o .c .< oa Licensee E e .s ae .

No- Date O-

  • O
  • Event u e oe Action to x "a o n .c "u m am o. o e uo e u o Report # >. o uo Prevent Recurrence ox C4 v x exQ 32 M o Mu o u

n I 1/3/88 S 625.8f B 4 88-001 NA NA A plint shutdown was commenced on January 3, 1988 for a planned maintenant e/ surveillance outage. During the shutdown, procedural deficiencies resulted in an upscale trip on Intermediate Range Monitors, and an automatic reactor scram. The outage continued until January 29. Major work performed included replacement of a reactor feedwater pump, repairs to the hot surge tank and the "B" final stage feedwater heater, and numerous surveillance items requiring shutdown conditions.

l

'F : Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets ~for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG l

D-Regulatory Restriction 4-Other (Explain) 1022)

E-Operator Training & ,

License Examination Exhibit 1-Same Source F-Administrative 4 G-Operational Error (Explain)

II-Other (Explain)

q a

AO box 97 6 PEARY OHIO 44081 m TELEPHONE (2166 259 3737 a ADDRESS 1o CENTER ACAO Serving The Best f.ocation in the Nation PERRY NUCLEAR POWER PLANT Al Kaplan ,

ves pass.oest Feb rua ry 16, 1988 NuctEra Gwa PY-CEI/NRR-0804 L U.S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report Dect Sir:

Attached is the January 1983 Mont hly Operating Report for P e r ry Uni t 1. This report is submitted in accordance with Technical Specification 6.9.1.8.

Please feel free t, contact ce if you have any questions.

Very tr ly yours, .

b? it.4-9 x S*U Al Kaplan Vice President Nuclear Group AK: cab Attachment cc: T. Colburn K. Connaughton USNRC, Region 111 Director, Office of Resource Management h