C2VE[MO ELBCIRIC ILUMDRTING OCMPANY PERRY MJCMAR POWER PUWff January 1, 1987-January 31, 1987 r
M3f!HLY OPERATDC REPGE TO MC DOCKET NUMBER:
50-440 LICENSE NUMBER: NPF-58 Subnitted By:
Plant Technical Manager
/
Mkh Plant Operations Manapr 0702180617 870131 PDR ADOCK 05000440
((dg R
PDR 7
P b
l
" i i
Table of Contents o
Operations Stenary.......................... 12 t
- 2 Average Daily Unit Power Level....
3 Operating Data Report
.i
- a
.'}
- Unit Shutdown and Power Reductions...............
4 r
)
f s
b b
s
- t Y
7 b
5
+
t h
g b
+
>I i
i i
V I
+
9 f
?
P L
i e
h 1
I m
1 m
r=
January 1987 Monthly Operating Summary Repairs on the condenser tube leakage which caused' manual shut down of the reactor at the end of December were completed on January 6, 1987, and the plant returned to Operational Condition 2 on January 8.
The unit.was manually shutdown on January ll for maintenance on several RCIC steam supply valves, as well as the Turbine Bypass and Stop Valves.
Following completion of this work, the plant was returned to Operational Condition 2 on January 21.
Continued concern with the operability of one of the RCIC steam supply motor operated valves resulted in a manual plant shutdown on January-24 to perform additional investigations including valve disassembly, and retesting utilizing a Motor Operated Valve Analysis and Test System (MOVATS). At the end of the month, the plant remained shutdown for maintenance on the RCIC, RHR and Feedwater Systems. The first low-level solidified radwaste shipment f rom.PNPP was made on January 27, and was successfully shipped, tested, accepted and buried at Barnwell, South Carolina.
I s_
4 Average Daily Unit Power Laval' DOCKET NO. 50-440 UNIT Perry - One DATE 2/9/87 COMPLETED BY T. L. Parmer TELEPHONE (216)259-373'i MONTH January 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 n
18
~~
n 3
n 19 n
4 n
20 n
5 n
21 n
6 n
22 n
7 n
23 n
8 o
24 n
9 n
25 n
10 0
26 n
11 0
27 n
12 0
28 n
13 o
29 n
14 0
30 n
15 0
31 n
16 o
INSTRUCTIONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
\\
r Operating Data Report DOCKET NO.
50-440
'DATE 2/9/87 COMPLETED BY T. L. Farmer TELEPHONE (216) 259-3737 OPERATING STATUS 1.
Unit Name: Perry-One 2.
Reporting Period:
January 195/
3.
Licensed Thermal-Power (MWt):
3579 4.
Nameplate Rating (Gross'MWe):
1250 5.
Design Electrical Rating (Net MWe):
1205 6.
Maximum Dependable Capacity (Gross MWe):
N/A 7.
Maximum Dependable Capacity (Net MWe):
N/A.
8.
If Changes Occur in Capacity Racings (Icem Numbers 3. through 7) Since Last Report. Give Reasons:
Nnno 9.
Power Level To Which Restricted. If Any -(Net MWe):
1Rs_6 MWo 10.
Reasons for Restrictions. If Any:
Rostricted hv neartun 'T'ont Condition l' Thmdarv.
This Month Yr-to-Date Cumulative.
~
lI. Hours In Reporting Period 744 744 76An
- 12. Number of Hours Reactor Was 171.3 171.3 1600_9 Critical 13.
Reactor Reserve Shutdown Hours 0
0 0
14. Hours Generator On-Line 0
0 2.3 15.
Unic Reserve Shutdown Hours 0
'O O
16.
Gross Thermal Energy Generated 27.984 27.984 133240 (MWH) 17.
Gross Electrical Energy Generated 0
0 236.4 (MWH) 18.
Net Electrical Energy Generated 0
0 0
(MWH) 19.
Unit Service Factor 20.
Unit Availability Factor 21.
Unit Capacity Factor (Using MDC Net)
NOT IN 0009ERCIAL OPERATION 22.
Unit Capacity Factor (Using DER Net) 23.
Unic Forced Outage Rate-24.
Shutdowns Scheduled Over Next 6 Months (Type Date and Duration of Each):
N/A 25.
If Shut Down At End of Report Period. Estimated Date of Startup:
February 6, 1987 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY 06/06/86
- INITIAL ELECTRICITY 12/19/86
- COMMERCIAL OPERATION 11/13/86
- Generator Synchronir.ation
- End Power Ascens ton (100 Hour Warranty Run)
N/A - Not aprelicable until comnercial operation.
..m m
m.
ms.
m
UNIT SilUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-440 e
'JNIT NAME Perry-One REPORT MONTil January DATE 2/9/87 COMPLETED BY T. L. Farmer TELEP110NE (216) 259-3737 m
a So Cause & Corrective S^ S NU Licensee E
U SE Action to E
'U U 0
E 'U E Event No.
Date N
Report #
h O
Prevent Recurrence n
I F: Forced Reason:
Method:
Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 1022)
E-Operator Training &
5 License Examination Exhibit I-Same Source F-Administrative G-Operational Error (Explain) li-Other (Explain)
l j
4 t
THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY
{
P.O. BOX 5000 - CLEVELANo, OHIO 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG. - 55 PUBLICSQUARE l
l Serving The Best Location in the Nation
)
l I
MURRAY R. EDELMAN SR VICE PRESIDENT NUCLEAR February 13, 1987 l-PY-CEI/NRR-0591 L Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Perry Nuclear Power Plant Docket No.
50-440 Monthly Operating Report
Dear Sir:
i Attached is the January, 1987 monthly operating report for Perry Unit 1.
This report is submitted in accordance with Technical Specification 6.9.1.8.
Please feel free to contact me if you have any questions.
Very truly yours, th Murray R. Edelman Senior Vice President Nuclear Group Enclosure MRE:njc cc: Jay Silberg, Esq.
Paul Leech (2)
K. Connaughton Mr. Lee Ililler (Office of Management and Program Analysis)
J. G. Keppler, Region III i4