z
+ - -
CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT' MONTHLY OPERATING REPORT TO NRC July 1, 1986 - July 31, 1986 DOCKET NUMBER:
50-440 LICENSE NUMBER: NPF-45 Submitted By:
c Plant echnical Manager
'M Plant Operatiods Manager R
3qq e
N\\. \\
Table of Contents Operations Summary..
I Average Daily Unit Power Level...
.2 Operating Data Report
.3 Unit Shutdown and Power Reductions.
.4
I OPERATIONS
SUMMARY
Open vessel testing was completed this month and Test Condition Heatup was entered. Non-Nuclear Heatup is in progress. Preoperational testing was completed on the post-accident radiaticn monitoring system (D19).
On July 6, 1986, reignition occurred in the off-gas charcoal adsorber vessels and another Unusual Event was declared. The Unusual Event was terminated on July 8, 1986. The off-gas charcoal adsorber vessels have been emptied, dried, and refilled with new charcoal. Preparations are underway to complete the off-gas system (N64) preoperational testing.
s
Average Daily Unit Power Level DOCKET NO. 50-440 UNIT Perry - One DATE 08/01/86 COMPLETED BY J. Richardt TELEPHONE 216/259-3737 MONTH July, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5-0 21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0-10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
l
~'
~ Operating Dcta Rrport
-e DOCKET NO.
50-440 DATE 08/01/86 COMPLETED BY
'J. Richardt TELEPHONE 216/259-3737' OPERATING STATUS 1.
Unit Name: Perry-One 2.
Reporting Period:
Julv. 1986 3.
Licensed Thermal Power (~MWt):
178 4.
Nameplate Rating (Gross MWe):
1250 5.
Design Electrical' Rating.(Net MWe):
1205 6.
Maximum Dependable Capacity (Gross MWe): N/A 7.
Maximum Dependable Capacity (Net MWe):
N/A 8.
If Changes Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report. Give Reasons:
N/A 9.
Power Level To Which Restricted.
If Any (Net MWe):
0 10.
Reasons for Restrictions.
If Any: NRC Restriction to 5% Reactor Pnuar This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 744 3268 3268 12.
Number of Hours Reactor Was 0
1.13 1.13 Critical 13.
Reactor Reserve Shutdown Hours 0
0 0
. 14. Hours Generator On-Line 0
0 0
15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated 0
0 0
(MWH) 17.
Gross Electrical Energy Generated 0
0 0
(MWH) 18.
Net Electrical Energy Generated 0
0 0
(MWH) 19.
Unit Service Factor 0
0 0
20.
Unit Availability Factor 0
0 0
21.
Unit Capacity Factor (Using 0
0' O
MDC Net) 22.
Unit Capacity Factor (Using 0
0 0
DER Net) 23.
Unit Forced Outage Rate 0
0 0
24.
Shutdowns Scheduled Over Next 6 Months (Type Date and Duration of Each):
None 25.
If Shut Down At End of Report Period. Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 06/06/86
- INITIAL ELECTRICITY 07/28/86
- COMMERCIAL OPERATION 11/13/86
- Generator Syncronization
- End Power Ascension ( 100 Hour Warranty Run)
N/A - Not applicable due to 5% Power Restriction
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-440 UNIT NAME Perrv-One REPORT MONTH July. 1986 DATE 08/01/86 COMPLETED BY J. Richardt TELEPHONE 216/259-3737 "i!.
w c
u a
n o cau a
,o, q g y,c g Licensee g,
gg Cause & Corrective No.
Date g
gg g j uy Event g.g g'g Action to gj y gjg Report #
gg gu Prevent Recurrence H
Qv ZM C U
Q I F: Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 1022)
E-Operator Training &
5 License Examination Exhibit 1-Same Source F-Administrative G-Operational Error (Explain)
H-Other (Explain)
f THE CLEVELAND ELECTRIC ILLUMIN ATING COMP ANY P.o. Box 5000 - CLEVELAND, OHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLOG. - 55 PUBLICSOUARE Serving The Best Location in the Nation MURRAY R. EDELMAN August 11, 1986 SR VCE PRESCENT PY-CEI/NRR-0520 L NUC LE AR Mr. Lee Hiller Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report
Dear Mr. Hiller:
Attached is the July, 1986 monthly operating report for Perry Unit 1.
This report is submitted in accordance with Technical Specification 6.9.1.8.
Please feel free to contact me if you have any questions.
Very truly yours, d
Murray R. Ede man Senior Vice President Nuclear Group Enclosure MRE:njc cc: Jay Silberg, Esq.