9 CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT MONTHLY OPERATING REPORT TO NRC May 1, 1986 - May 31, 1986 DOCKET NUMBER:
50-440 LICENSE NUMBER:
~
Submitted By:
Plant Technical Manager J
A Plant Operations ' Manager 8608180107 860531 PDR ADOCK 05000440 R
PDR I Edf flI
'r
+
1 Table of Contents j '
Operations Sunumary.
.......................... - l I-i-
Average Daily Unit Power Level...................
2 1-Operating' Data Report 3
5 Unit Shutdown and Power Reductions 4
4 i
k' e
i 4
1 4
9 i
(
1 i
4 1
iI 1
1.
l i
4 I
d.
I t
f 4
j..
t i
1',
E 1
I i
I f
E.
f 1
b I-h,
-I
r '.
4; i-t,
a Operations Summary The Californium neutron sources were installed on May 2, core verification was completed on May 4, and scram time testing was completed on May 23, 1986. An operational physical security inspection was conducted during the week of May 5, 1986. All Operating License related items required for initial, criticality were completed as of May 30, 1986, and surveillances were being conducted in preparation for initial criticality.
Average Daily Unit Power Level DOCKET NO. 50-440 UNIT Perry - One DATE 06/02/86 COMPLETED BY J. Richardt TELEPHONE 216/259-3737 MONTH May, 1986 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
8 0
24 0
9 0
25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 0
16 0
INSTRUCTIONS On this format list the average daily unit 96'4er
+ vel in MWe-Net ' for each day in the reporting month. Compute to rne tar
- whole megawatt.
l l
1
4 Operating D:ta Rrport t
DOCKET NO. 50-440 DATE 06/02/86 COMPLETED BY__J. Richardt.
TELEPHONE 216/259-3737 OPERATING STATUS 1.
Unit Nsne: Perry-One 2.
Reporting Period:
w,y ingg 3.
Licensed Thermal Powe'r'(MWt): 178 4.
Nameplate Rating (Gross MWe):
1250 5.
Design Electrical Rating (Net MWe):
1205 6.
Maximum Dependable Capacity (Gross MWe): N/A 7.
Maximum Dependable Capacity (Net MWe): N/A 8.
If' Changes Occur in Capacity Ratings (Item Numbers 3 through 7) Since Last Report. Give Reasons:
N/A 9.
Power Level To Which Restricted.
If Any (Net MWe): 0 10.
Reasons for Restrictions.
If Any: NRC Restriction To 5% Reactor Power This Month Yr-to-Date Cumulative 11.
Hours In Reporting Period 744 1799 1799 12.
Number of Hours Reactor Was 0
0 O
Critical 13.
Reactor Reserve Shutdown Hours 0
0 0
14. Hours Generator On-Line 0
0 0
15.
Unit Reserve Shutdown Hours 0
0 0
16.
Gross Thermal Energy Generated 0
0 0
(MWH) 17.
Gross Electrical Energy Generated 0
0 0
(MWH) 18.
Net Electrical Energy Generated 0
0 0
(MWH) 19.
Unit Service Factor 0
0 0
20.
Unit Availability Factor 0
0 0
21.
Unit Capacity Factor (Using 0
0 0
MDC Net) 22.
Unit' Capacity Factor (Using 0
0 0
DER Net) 23.
Unit Forced Outage Rate 0
0 0
24.
Shutdowns Scheduled Over Next 6 Months (Type Date and Duration of Each):
None 25.
If Shut Down At End of Report Period. Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/13/86
~
- INITIAL ELECTRICITY 07/18/86
- COMMERCIAL OPERATION 11/01/86
- Generator Syncronization
- End Power Ascension (100 Hour Warranty Run)
N/A - Not applicable due to 5% Power Restriction
+
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-440 UNIT NAME Perry - One REPORT MONTH May, 1986 DATE 06/02/86 COMPLETED BY J. Richardt TELEPHONE 216/259-3737 7.
o uf U
c m
0, ^
g,,c g Licensee g,
gg Cause & Corrective No.
Date g
yg g
j jg Event yg g, y Action to yj g gjg Report #
gj gU Prevent Recurrence H
- UJ C U
.:2 v t.
Q
'F:
Forced Reason:
Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee C-Refi.eling 3-Automatic Scram Event Report (LER) File (NUREG D-Regulatory Restriction 4-Other (Explain) 1022)
E-Operator Training &
5 I; cense Examination Exhibit 1-Same Source F Administrative G-Operaticnal Error (Explain)
H-Other (Explain)
Y O
f THE CLEVELAND ELECTR P.O. BOX 5000 - CLEVELAND. OHlo 44101 - TELEPHONE (216) 622-9800 - ILLUMINATING BLDG.
- 55 PUBLICSQUARE Serving The Best Location in the Nation MURRAY R. EDELMAN VICE PRESIDENT NUCLEAR June 10, 1986 PY-CEI/NRR-0479 L Mr. Lee Hiller Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C.
20555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report
Dear Mr. Hiller:
Attached is the May, 1986 monthly operating report for Perry Unit 1.
This report is submitted in accordance with Technical Specification 6.9.1.8.
Please feel free to contact me if you have any questions.
Very truly yours,
~
%%ttsi /
Murray R. Edelman Senior Vice President Nuclear Group Enclosure MRE:njc cc: Jay Silberg, Esq.
John Stefano (2)
J. Grobe J. G. Keppler, Region III
//
\\ L