PY-CEI-NRR-0450, Monthly Operating Rept for Mar 1986

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1986
ML20206E174
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 03/31/1986
From: Edelman M, Kanuch D
CLEVELAND ELECTRIC ILLUMINATING CO.
To: Hiller L
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PY-CEI-NRR-0450, PY-CEI-NRR-450, NUDOCS 8606230185
Download: ML20206E174 (7)


Text

_ _ - _ ____________

CLEVELAND ELECTRIC ILLUMINATING COMPANY PERRY NUCLEAR POWER PLANT MONTHLY OPERATING REPORT TO NRC March 1, 1986 - March 31, 1986 DOCKET NUMBER:

50-440 LICENSE NUMBER: NPF-45 Submitted By:

P1 chnical Manager it.kh 4

Plant Operations Manager 8606230185 860331 PDR ADOCK 05000440 R

PDR Y f-

/

I)

Table of Contents Operations Summary.

l Average Daily Unit Power Level.

.2 Operating Data Report

.3 Unit Shutdown and Power Reductions

.4 a

Operations Summary Perry Unit I received a low power operating license on March 18, 1986.

Fuel load commenced on March 21, 1986, following completion of residual work items required to enter mode 5.

150 of 748 fuel assemblies had been loaded as of March 31, 1986. Electrical problems associated with the refueling platform have resulted in our loading fuel somewhat slower than expected. These problems are being resolved and fuel load is expected to continue at a faster pace in April.

Date Time Activity 3/18/86 Low Power License Received 3/21/86 0604 Refueling (Mode 5) Established 0718 First Fuel Assembly Loaded 3/31/86 2400 150 of 748 Assemblies Loaded 4

n

~

~ _ -.

i e

Average Daily Unit Power Level i

I DOCKET NO. 50-440 j

UNIT Perry - One DATE 4/1/86 COMPLETED BY D. Kanuch i

I TELEPHONE 216/259-3737 9

MONTH March, 1986 1

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) l N/A 17 N/A 2

N/A 18 N/A 3

N/A 19 N/A 4

N/A 20 N/A 5

N/A 21 0

6 N/A 22 0

7 N/A 23 0

8 N/A 24 0

2 9

N/A 25 0

j 10 N/A 26 0

]

11 N/A 27 0

l 12 N/A 28 0

13 N/A 29 0

14 N/A 30 0

I 15 N/A 31 0

16 N/A INSTRUCTIONS On this format list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

i i

9 my

=emv

-p r-9er

=me<e.


'-w' e

we4-e-t eepe? ou g-wrm----m--

+--y*

+p-*-r-r

Operating Deta Report DOCKET NO. 50-440 DATE 4/1/86 COMPLETED BY D. Ranuch TELEPHONE 216/259-3737 OPERATING STATUS 1.

Unit Name: Perry - One 2.

Reporting Period: March, 1986 3.

Licensed Thermal Power (MWt): 178 4.

Nameplate Rating (Gross MWe): 1250 5.

Design Electrical Rating (Net MWe): 1205 6.

Maximum Dependable Capacity (Gross MWe): N/A 7.

Maximum Dependable Capacity (Net MWe): N/A 8.

If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report. Give Reasons:

N/A 9.

Power Level To Which Restricted.

If any (Net MWe): 0 10.

Reasons for Restrictions.

If Any: NRC Restriction to 5% Reactor Power for completion of initial fuel load and required testing.

This Mc4 nth Yr-to-Date Cumulative 11.

Hours In Reporting Period 336 336 336 12.

Number Of Hours Reactor Was 0

0 0

Critical 13.

Reactor Reserve Shutdown Hours 0

0 0

14. Hours Generator On-Line 0

0 0

15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated 0

0 0

(MWH) 17.

Gross Electrical Energy Generated 0

0 0

(MWH) 18.

Net Electrical Energy Generated 0

0 0

(MWH) 19.

Unit Service Factor 0

0 0

20.

Unit Availability Factor 0

0 0

21.

Unit Capacity Factor (Using 0

0 0

MDC Net) 22.

Unit Capacity Factor (Using 0

0 0

DER Net) 23.

Unit Forced Outage Rate 0

0 0

24.

Shutdowns Scheduled Over Next 6 Months (Type Date and Duration of Each):

None 25.

If Shut Down At End of Report Period. Estimated Date of Startup:

N/A 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY 5 /13 /86

  • INITIAL ELECTRICITY 7/ 4 /86
    • COMMERCIAL OPERATION 10 /18 /86
  • Generator Syncronization
    • End Power Ascension (100 Hour Warranty Run)

N/A - Not applicable due to 5% Power Restriction

N o

N SF ne

.o SF c o hr D

e c a

de t

ud e

le d

HRq c

agg 0c HGF EDCBAR e

vjg ^

OOALORRMEa tp d ip eeaq s hemceg fiuo erier uunin yggm rannal etp :

t is t alem

gjy o

( is eot ine z

Eot ronan mj j',cw 2

nr E rg nt

p aa x Ty c

aopgg3%

l l t ar eF a

i mar a

iEviie oi nr e nns rl R

L

) r ait u

e Ei o

t nr Tr p vc r

ig i ee oee o

c s

r nn t t s U

(

n&t t (

E i

E e

N e

x o

x I

p n

p T

l l

a a

S i

i R

H n

n ggg E

U j g,,

P T

)

)

O D

R O

T W

N 432I M gg$

M S

- - - - e O

OAMMt ugg N

A t uaah T

N ht nno H

D eouud rmaa:

M P

al l a

O

( t r

W EiS c

E xcc h

R p

r l Sa R

acm 1

E i r 9

D na 8

U

) m 6

CT I

O N

S P

C r

a e

u v

s eAe nc t t 6 i,

roc eno c

r EEfE 5

1 ut r E

0vnox r oe x

2et rh r

c h

2nr i

e t

i

) ty Pb n

i b

r i c

v i

RSet e

e C

t ehp O

p eaG M

D l

oer TP UO rt a -

EL NC S

t st LE I K a

iI ET TE m

( fon PE T

e Lons HDDN Er t

O AAN S

R or o

) Lfu NBTM.O EYEE u

i c

r Fc Dt 4

P 5

e l nt o 1

D.

c ieai 2

/

e 0

es an 6

1 r

e s

/

K

/

r 4

( e 2

a 8

y 4

N 5

n 6

0 U

9 u

R c

E 3

h O

G 7

n 3

e 7

e

, l' THE CLEVELAND ELECTRIC ILLUMINATING COMPANY P.O. BOX 5000 - CLEVELAND. OHlO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDG - 55 PUBLICSQUARE Serving The Best Location in the Nation MWIRAY R. EDELMAN VICE PRESIDENT NUCLE A R April 14, 1986 PY-CEI/NRR-0450 L Mr. Lee Hiller Office of Management and Program Analysis U.S. Nuclear Regulatory Commission Washington, D. C.

2G555 Perry Nuclear Power Plant Docket No. 50-440 Monthly Operating Report

Dear Mr. Hiller:

Attached is the first monthly operating report for Perry Unit 1 (March, 1986). This report is submitted in accordance with Technical Specification 6.9.1.8.

Please feel free to contact me if you have any questions.

Very truly yours,

%b w

Murray R. Edelman Vice President Nuclear Group Enclosure MRE:njc cc: Jay Silberg, Esq.

John Stefano (2)

J. Grobe J. G. Keppler, Region Ill 6

's

.