PNP 2016-062, Registration of Holtec HI-STORM FW System Casks
| ML16319A269 | |
| Person / Time | |
|---|---|
| Site: | Palisades, 07201032 |
| Issue date: | 11/14/2016 |
| From: | Hardy J Entergy Nuclear Operations |
| To: | Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation |
| References | |
| PNP 2016-062 | |
| Download: ML16319A269 (2) | |
Text
-=:=. Entergy PNP 2016-062 November 14, 2016 Document Control Desk Director, Division of Spent Fuel Management Office of Nuclear Material Safety and Safeguards U. S. Nuclear Regulatory Commission Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert. MI 49043 Tel 269 764 2000 Jeffery A. Hardy Regulatory Assurance Manager 10 CFR 72.212(b)(2)
Subject:
Registration of Holtec HI-STORM FW System Casks Palisades Nuclear Plant Dockets 50-255 and 72-7 License No. DPR-20
Dear Sir or Madam:
In accordance with the requirements of 10 CFR 72.212(b)(2), Entergy Nuclear Operations, Inc. is providing the attached information to register the use of approved spent fuel storage casks at the Palisades Nuclear Plant Independent Spent Fuel Storage Installation (ISFSI).
This letter contains no new commitments and no revisions to existing commitments.
Sincerely,
Attachment:
Cask Registration Information CC Administrator, Region III, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC
Licensee1s Name:
Licensee1s Address:
ATTACHMENT CASK REGISTRATION INFORMATION Entergy Nuclear Operations, Inc.
27780 Blue Star Memorial Highway Covert, MI49043 Reactor License Number:
DPR-20 Reactor Docket No.:
ISFSI Docket No.:
Cask Certificate No.:
Cask Model No.:
Contact:
MPC Serial MPC Unit 10 Number Number MPC-37-023 MPC-37-01 MPC-37-024 MPC-37-02 MPC-37-025 MPC-37-03 MPC-37-026 MPC-37-04 50-255 72-7 1032, Amendment 1, Rev 1 HI-STORM FW MPC Storage System Tim Crocker Sr. Project Manager (269) 764-2856 HI-STORM HI-STORM Serial Number Unit 10 Number HISTORM-037 HISTORM-01 HISTORM-036 HISTORM-02 HISTORM-035 HISTORM-03 HISTORM-038 HISTORM-04 Page 1 of 1 MPC Aggregate Heat Load 23.68 kW 26.38 kW 27.57 kW 28.61 kW Placed in Service 10/25/2016 10/29/2016 11/04/2016 11/11/2016