PNP 2016-056, Letter in Regarding to NRC Confirmatory Order EA-14-013 Completion

From kanterella
Jump to navigation Jump to search
Letter in Regarding to NRC Confirmatory Order EA-14-013 Completion
ML16277A423
Person / Time
Site: Palisades Entergy icon.png
Issue date: 10/03/2016
From: Hardy J
Entergy Nuclear Operations
To: O'Brien K
Document Control Desk, Office of Nuclear Reactor Regulation, NRC/RGN-III
References
EA-14-013, PNP 2016-056
Download: ML16277A423 (1)


Text

-===-Entergy Entergy Nuclear Operations, Inc.

Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043 2697642000 Jeffery A. Hardy Regulatory Assurance Manager PNP 2016-056 October 3, 2016 Mr. Kenneth O'Brien Region III Director, Division of Reactor Safety U. S. Nuclear Regulatory Commission 2443 Warrenville Road, Suite 210 Lisle, IL 60532-4352

SUBJECT:

NRC Confirmatory Order EA-14-013 Palisades Nuclear Plant Dockets 50-255 License No. DPR-20

REFERENCE:

Letter from Nuclear Regulatory Commission to Entergy Nuclear Operations, Inc., "Confirmatory Order Related to NRC Report No.

05000255/2014406 and 01 Report 3-2013-018; Palisades Nuclear,"

dated July 21 , 2014 (ADAMS Accession Number ML14203A082).

Dear Mr. O'Brien:

Section V, item F.2, of the subject Confirmatory Order states: "Upon completion of all terms of the Confirmatory Order, Entergy will provide the NRC with a letter discussing its basis for concluding that the Order has been satisfied."

This letter is to inform you that all the terms of subject Confirmatory Order have been completed.

All related documentation is available for inspection.

This letter contains no new commitments and no revisions to existing commitments.

Sincerely, 9AW*

JAH/tad cc: Document Control Desk, USNRC Project Manager, Palisades, USNRC Resident Inspector, Palisades, USNRC