P~tll~~H~ARY NOTlFlCATJON OF tVtNT OR UNUSUAL OCC:URENCE--PN0-111-80-175 This preliminary ryotificati9n ~o~stitutes EA~Y notic~ of events of_POSSJBLE safety or _publ-ic 1nterest S"I n1f1cance.
lhe 1nfonnat1on resent!d n as 1nitiall received without verification or eva uation and ls basiczs 1 all that is known y
stzs f as of this date.
S11hje~t:
Consumers Power Compony Pa1isades NuclC4r Power Plan~
Docket No, 50-255 CuverL. MI STR TKE OF OtERATING EMPLOYEES AT NUCLEAR. POWER PLANT A wil.dr..a.t Rtrike wxR initiated at 7:00 a.m. (CDT) thiH morning, s~ptember 12,. 1980.
~1ckets are present at the m&1n gate and are bein& honored by operations, maintcmanc~,
nnd construction person11el.
Secu~ity rorccs arr. nnt honoring thr. picket linr. nnd hnvr.
CAllRd in Addi. t.i c.inA 1. 8P.Cn1"i~y pa1"ROnnal.
Thr. JIL'l.nC vill ~ontinuc opcrnt1on n.nd 'lR being r.tnffed by nu1ruigement pe1"Aonnel.
The resident inspectors and a Region III Secu.ri:y Specialist were aware that a wildcxt Rt'rik1:1. might be rAllt!d and were <.m!!lte when Lhe pic.k~LH wtire establlshecl.
The resident inspectors have assur~d that: t.hc plant staffing r~qni r.~~nt.s ;ind ntht?T regulatory rP.qnirP.Jnenr.s RTR bP.ing me.t during thiH.Ntrike.
The. uperaLiuns cre111 on.
duty at the t.1me the str1:-ke vas cal!ed has agreed to stay on dt1ty until Noon tnriay.
The-duraticn of the strike is unknown.
A te11.te1t.ive agr~~ment b~tweeu the t.Ttlll*ty Workers o'f /\\me.T"tfo.. "l :incl Cons:;1uncra Pnwr.r Crnupnny wm:; renc.ht!d un AugusL :u. 1980, buL; -
this new contract has not ye~ been ratified.
We undcretnn.d t::hnt nna of t.hc :l.AsucR hcing chn.llengcid by this st:r.11<.e 3Ction is in regard to r.nnAer.uttve hnuTA worRed, consecutive days worked, and total hours worked per week.
Crnnpany management: has a statement 1n the new contract which Teads "NR.C re.qulremeuts ln these areats are ovcrr ldlne. 11
'l'lle union d(lr.s not want: th:it Atntement
- In the contract 1't:!cause lt has the pot.cnt:iaJ to impnt.".t: grc:1.tly nn nvc1:'t:1me houri:;
~~~.
.NeiLb.er Reglun III nor t:.he lJ.censee plau to issue a press release at this time.
The State of Michigan will be notified.
UPllATE INFORMATION:
Regicni III wus notified by th~ ~side.it.Inspector that the str1k.4l was te.'J:lldnated at ap~tely 10:30 a.m. C:q~Ihe terms of the agrecuieRt are not known tc the NRC at this p?me.7 _ _
.,1
~
Contact:
B.
Jor~etlSen, 6!6/764-1328; u. Boyd, 312/932-2546; R. F. Heishman,
~
- 312j932-2540
PN0* 11 l*SO-175
-~
Oistr-ibutfon:
Transmitted H *St.
Conmi-s-s1..-.o-n-er Hendrie Chairman Ahearne COltltlissioner Gilinsky Tr~nsmitted:
MNBB ------
- w. J. Dircks, EOO C. Michelson, AEOD J. J. Fouchard. PA N. M. Haller, MPA C. w. Kerr, OSP H. K. Shapar. ELD Regional Offices. ___ _
Corrrnissicner Bradford ACRS P. Bldg. __
H. R. Denton, NRR R. H. Vollmer. NRR R. J. Mattson. NRR D. F. Ross, NRR O. Etsenhut, NRR S. H. Hanauer Willste Bldg.~--
J. G. Davis, NMSS T.. *E. Murley, Rl~S PRELIMINARY NOTIFICATION Page 2 of 2 S. J. Chil~. SECY C. C. Kamnerer, CA (For Distribution) lE:XOOS ____ (IE:HQ Dist.)
Landow
{6 m1n/page)
J. J. Cumm1ngs. OIA MAIL R. Minogue, SD IE:XOOS Document Mgt. Br. (Far POR/LPO: