PNO-II-80-166, on 801120,after Startup,Increase of Leakage from Steam Generator B from 0.6 to 11 Gallons/H Identified. Cause Not Stated.Util Plans to Shut Down for Steam Generator Repairs for 5-7 Day Outage

From kanterella
(Redirected from PNO-II-80-166)
Jump to navigation Jump to search
PNO-II-80-166:on 801120,after Startup,Increase of Leakage from Steam Generator B from 0.6 to 11 Gallons/H Identified. Cause Not Stated.Util Plans to Shut Down for Steam Generator Repairs for 5-7 Day Outage
ML17340A771
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 11/26/1980
From: Jape F, Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
References
PNO-II-80-166, NUDOCS 8102280240
Download: ML17340A771 (6)


PRELIMINARY NOTTF1LATION

~

'NCLOSURE 5 F.:-:::=':='-':

Novcmbcr 26, 1980 PL+L~MLNARv NOTIFICATION OF EVFP nR R~JSlJAL OCCAM-RRENCE PNO-II-80-166 safe:Lv or public interest si nificance.

Thc. information rc..sentect i" as initial I received vithout verification or evaluation.and

's basical1v all that is hnovn bv JE staff as of this date VhC I I.t'[T:5 SUIJZ CT:

Florida Power and Light Company Turi<ey Point Unit 3 Doci:et No. 50-250

'Homestc:ad, Florida SOFIA?J CENF:RATOR TUBE LEAK An increase in the leal'agc in "B" steam generator from 0.6 to 11.0 gallons per hour was identified after the. start-up of November 20.

The Technical Specification limit is 18 ga'lons per hour.

The lic:ensee plans to shut clown for st.earn generaLor repa'irs thi'vening for a 5-7 day ou agc.

Media in crest has occu. red in LhaL calls have been received by Region II-The Licensee plans to issue a

news release.

Beg.on l is responcling to press inciuiries.

The Stat.e oS Florida has been informed.

. This Preliminary Notification, is issued for information only aud no further IE

-:action is anticiPat.ece.

Region iI (Atianta) rec:eived notification o this occurrence by telephone from t.h rcsiocn inspector at 7:30 a.m.

on November 26.

Contact:

T. Peebles, RTl 242"5794; F. Jape, Rll 242-5534 Transmit cd H.

O ar,-inat.inn:

Ci.eizn-n hnaa~e Commissioner Gilinsky Transmi LLed:

KiBB Vi. J. Dirc'<-, EDO C. "eichelsnn, AEOD J. J. Fouchard, PA N..g. Ha'er, MPA R.

G. Ryan, SP H. i:. Shapar, "LD hpp'xcabae ResxdenL S>.Le Regional Offices Applicable 'Utility St.

Cnmmi sioner nendric Commissioner Bradiord ACRS P. Bldg.

H. R. Dentong 1PB R.

H. 'Pollmer,

?RR F. Schroedc ERR D. F.

Ross, hnR D. Eiseuhut, NRR S.

H. Hanau.r, NitR Villste J.

G. Davis, YNSS T.

E. ?iuyiev, RES S. J.

Ch lk, SECY C.

C.

Kamcmerer, CA (For IYistribution}

IEtXOOS 8-'~(IE:HQ Dis.)

d nv'e(5 nin/page',

J. J. Casings, OZh MAIL R. Minoguc, SD iEtXOOS Document M

. Br. (For PD.";:

S.

Ebbing NSOC PRET IMIHARV NOTir lCATLON

gi l

/ ~

F Roof/

Rep.

Dante. Fascell ACTION CONTROL COMPL'EAOL'INE ACKNOWLEDGMENT INTERIM:REPLY DATES 1:-16-81 CONTROL NO.~ g g ~

DATE OF DOCUMENT TO:

CA FINALREPLY F ILE LOCATION Hl I-2.8>g.-Ho PREPARE FOR SIGNATURE OF:

Q CHAIRMAN gr EXECUTIVE DIRECTOR DESCRIPTION Kj LETTER Q MEMO Q REPORT.

Q OTHER, SPECIAL INSTRUCTIONS OR REMARKS Encl. letter fm llarren Hoskins, Conchshell Al-liance, re concern of allowing operation of Turkey Point 3 after pipe corrosion 8 other defects, were discovered DOCUMiKNT/COPYNO CLASSIFIED DATA CLASSIFICATION

. NUMBER OF PAGES DSr AL REGISTRY NO'I ASSIGNED TO:

~

(

DATE CATEGORY Q

NSI QRD Q FRD INFORMATIONROUTING SECY 80-2168 LEGAL REVIElrlr Q

FINAL Q

COPY enzon 0

/

ln. >cg

~r) <r e

o L. Underwood Wanaavr D~e PPAS.

ASSIGNED TO DATE NO LEGAL OBJECTIONS NOT IF Y:

KDO ADMIN4CORRES BR KXT.

COMiMFNTS. NOT IFY:

EXT.

JCAE NOTIFICATIONRECOMMENDED:

Q YES Q

ND NRC FOR~i.r 22

/r r 75)

EXECUTIV 'DrRECTOR FOR OP RATIONS PRINClPAL CORRESPONDENCE CONTROL DO /l/OT REPROVE THIS COPY

e%

eee e Der

~12 I 9 80 r

~

~ D

+

~

~

~

NRC SECRETARIAT 0 Commissioner XZKExec. DirJOper CI Cong. Liaison C3 Public Affairs Incoming F rom:

Dere CI Ge

. Ceeerer D Solicitor C3 Secretary D

Inspector & Auditor Policy Evaluation it nt Referral To:

SubjectPe eratior::::,': '

Prepare reply for signature of:

D Chairman D Commissioner D EDO, GC, CL, SOL, PA, SECY, IA, PE D Signature block omitted D Return original of incoming with response QXpor direct reply SuSpenSe:

Jan 9

Q For appropriate action 0

For information Remarks OCA to Ack gQ ~

~

~ e'e/r a

irRC62 For the Commission:

'Send three I3) copies of reply to Secy Correspondence and Records Branch ACTION SLIP

Qi 0