PM-82-389, Forwards Monthly Operating Rept for Apr 1982

From kanterella
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Apr 1982
ML20052F586
Person / Time
Site: Hatch 
Issue date: 05/04/1982
From: Nix H
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML20052F587 List:
References
PM-82-389, NUDOCS 8205130217
Download: ML20052F586 (1)


Text

'

Georgi

  • Powir Compiny Post Offica Box 439 B+rity, Georgic 31513 Telephone 912 367-7781 912 537-9444 GeorgiaPower Edwin 1. Hatch Nuclear Plant May 4, 1982 PM-82-389 PLANT E.

I.

HATCH NRC Monthly operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Sir:

Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.

s r Md he H.

G. yx p

1 Plant Manager RECEIVED s

HLS/hh MAY 131982> [8 2-'

niramucn====

r.02OI luaGIIUil M l

\\

E O

1 i

D 1

l l

l

{hs.

i l

i G205130217 820504 PDR ADOCK 05000 R