PM-82-389, Forwards Monthly Operating Rept for Apr 1982
(Redirected from PM-82-389)
| ML20052F586 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 05/04/1982 |
| From: | Nix H GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20052F587 | List: |
| References | |
| PM-82-389, NUDOCS 8205130217 | |
| Download: ML20052F586 (1) | |
Text
'
Georgi
- Powir Compiny Post Offica Box 439 B+rity, Georgic 31513 Telephone 912 367-7781 912 537-9444 GeorgiaPower Edwin 1. Hatch Nuclear Plant May 4, 1982 PM-82-389 PLANT E.
I.
HATCH NRC Monthly operating Report Director Office of Inspection and Enforcement United States Nuclear Regulatory Commission Washington, D. C.
20555
Dear Sir:
Per Tech Specs section 6.9.1.6 please find attached the NRC Monthly Operating Report for Hatch Unit 2, Docket #50-366.
s r Md he H.
G. yx p
1 Plant Manager RECEIVED s
HLS/hh MAY 131982> [8 2-'
niramucn====
r.02OI luaGIIUil M l
\\
E O
1 i
D 1
l l
l
{hs.
i l
i G205130217 820504 PDR ADOCK 05000 R