PM-79-892, Forwards Monthly Operating Rept for Sept 1979

From kanterella
(Redirected from PM-79-892)
Jump to navigation Jump to search
Forwards Monthly Operating Rept for Sept 1979
ML19253B810
Person / Time
Site: Hatch 
Issue date: 10/10/1979
From: Manry M
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
Shared Package
ML19253B811 List:
References
PM-79-892, NUDOCS 7910220268
Download: ML19253B810 (1)


Text

Georgia Power Company Post Othee Box 442 Baxley. Georgia 31513 Telephone 912 367-7781 912 537-9444 m

Georgia Power Edwin I. Hatch Nuclear Plant the southern electrc system October 10, 1970 PM-70-802 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-321 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.

20R55

Dear Sirs:

Pursuant to Section 6.4.1.6 of the Hatch Unit 1

Technical Specifications, please find attached the NRC Monthly Ooerating Report.

,s

'_l, W,,

.s

' M'.

Manry Plant Manager M4/peb xc:

C. T. Moore T. V. Greene File Dg' 1150 361 7910220 z67