PM-79-234, Forwards Monthly Operating Rept for Feb 1979
(Redirected from PM-79-234)
| ML19289D717 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 03/09/1979 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19289D718 | List: |
| References | |
| PM-79-234, NUDOCS 7903140280 | |
| Download: ML19289D717 (1) | |
Text
.g G< Orqa PO * > CG ' priy Pt t 0".c n B ;4 44/
[q. e y fir r rr 1 ]151 'f Te, phcr.. 91 ? lb,,
776i 912 'Ji7 '3141 L
Georgia Power Edwin I. Hatch Nuclear Plant Maren 9, 1979 PM-79-234 PLANT E. I. HATCH NRC Monthly Re @ t Docket No. 50-321 Office of Plans and Schedules Directorate of Licensing U.S. Nuclear Regulatory Cor=ission Washington, D.C.
20545
Dear Sirs:
Pursuant to Section 6.9.1 (c) of the Hatch Unit 1 Technical Specifications, please find attached the NRC Monthly Operating Report.
h.v
/t.
t4enA' M./Manry Plant Manag MM/bvw R
THis DOCUMEllT C0tlTAlt4S xc:
H. C. Nix POOR QUAUTY PAGES T. v. creene a
File Gyi s
730314 op g6 4