PM-79-147, Forwards Monthly Operating Rept for Jan 1979
Jump to navigation
Jump to search
| ML19263C252 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 02/07/1979 |
| From: | Manry M GEORGIA POWER CO. |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML19263C253 | List: |
| References | |
| PM-79-147, NUDOCS 7902130090 | |
| Download: ML19263C252 (1) | |
Text
"
Gecrg a Pcwer Ccmpany Post O'f ce Box 442 Samley. Georgta 31513 7e.acnone 912 067 6696 Tms DOCutaEllT C0 tit p{g 912 367-7731 i
g j
POOR quAUW Georga Power Edwin I. Haten Nuclear Plant
+g 3. j emr.. r,c e,w e Feb"uary 7,1979 PM-79 147 PLANT E. I. HATCH NRC Monthly Report Docket No. 50-366 Office of Plans and Schedules Directorate of Licensing U.S. Nuclear Regulatory Consission
'4ashington, D.C.
20545
Dear Sirs:
Pursuant to Sec tion 6.9.1.6 of the Hatch Unit 2 Technical Specifications, please find attached the NRC Monthly Opersting Report.
~r,
/,. //
'l,
Y
/ M: _ % - r 7 ;W
,M.
Manry f'
Plant Manager MM/bvw xc:
H. C. Nix T. V. Greene File 7902130090
/
[