PLA-7519, Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations.

From kanterella
Jump to navigation Jump to search
Response to Regulatory Issue Summary 2016-09, Preparation and Scheduling of Operator Licensing Examinations.
ML16251A237
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 09/07/2016
From: Franssen R
Susquehanna, Talen Energy
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-7519, RIS-16-09
Download: ML16251A237 (3)


Text

TALEN~

Robert J. Franssen Susquehanna Nuclear, LLC Plant Manager 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3170 Fax 570.542.1504 robert.franssen@talenenergy .com ENERGY SEP 0 7 2016 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION RESPONSE TO NRC REGULATORY ISSUE

SUMMARY

2016-09 "PREPARATION AND SCHEDULING OF OPERATOR LICENSING EXAMINATIONS" Docket No. 50-387 PLA-7519 and 50-388 Reference 1: NRC RIS 2016-09, "Preparation and Scheduling of Operator Licensing Examinations,"

dated June 16, 2016.

The purpose of this letter is to respond to the Nuclear Regulatory Commission Regulatory Issue Summary 2016-09 "Preparation and Scheduling of Operator Licensing Examinations" (Reference 1). Enclosed in the NRC Form 536 (Enclosure 1) representing the current plan for operator licensing needs at the Susquehanna Steam Electric Station.

Susquehanna Nuclear, LLC will support Region I to balance examiner workload and provide mutually agreeable exam schedules through 2021. Susquehanna Nuclear, LLC intends to prepare all license operator examinations during this period.

Should you have any questions regarding this submittal, please contact Mr. Jason Jennings, Manager- Nuclear Regulatory Affairs at (570) 542-3155.

This submittal contains no new regulatory commitments.

Sincerely, R. J. Franssen : NRC Form 536 Copy: NRC Document Control Desk Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. T. E. Hood, NRC Project Manager Mr. M. Shields, PA DEP/BRP to PLA-7519 NRCForm536

NRC FORM 536 U. S. NUCLEAR REGULA TORY COMMISSION APPROVED BY OMS: NO. 3150-0131 EXPIRES: 10/31/2017 (05*2016) Estimated burden per response to comply with this voluntary infonmation collection request: 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This

~f\ RE:cv(

P .,,. infonmation collection is used to plan budgets and resources for operator examinations. Send
  • ~%".

~

.. 0 OPERATOR LICENSING comments regarding burden estimate to the FOIA, Privacy, and lnfonmation Collections Branch (T-5

~ ' F53), U.S. Nuclear Regulatory Commission, Washington, DC20555-0001, or by e-mail to

~

~ q

~

EXAMINATION DATA lnfocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs,

~+ o'r., NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503. If a means

'1 ..... *."' used to impose an infonmation collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.

FACILITY NRC REGION Susquehanna Nuclear, LLC 1 A. PROPOSED EXAMINATION PREPARATION SCHEDULE CY 18 CY 19 CY 20 CY 21 PROPOSED NUMBER ESTIMATED NUMBER OF LICENSEE-PREPARED 1 I 1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0 0 0 EXAMINATIONS B. INITIAL OPERA TOR LICENSE EXAMINATIONS CY 18 CY 19 CY 20 CY 21 PROPOSED NUMBER NUMBER OF REACTOR OPERATORS 5 8 8 NUMBER OF SENIOR REACTOR OPERATORS -INSTANT 8 6 6 NUMBER OF SENIOR REACTOR OPERATORS-UPGRADE 0 2 2 NUMBER OF SENIOR REACTOR OPERATORS- LIMITED 0 0 0 PROPOSED DATES PRIMARY DATE 02/26/2 018 08/ 19/2019 08/23/2021 ALTERNATE DATE 03/05/2018 08/26/2019 08/30/202 1

c. PROPOSED GENERIC FUNDAMENTALS EXAMINATION (GFE) SCHEDULE PROPOSED CY 17 CY 18 NUMBER MARCH SEPTEMBER MARCH SEPTEMBER ESTIMATED NUMBER OF 14 CANDIDATES NRC FORM 536 (05-2016)