Other: ML13060A357, ML14010A371, ML14251A231, ML14323A680, ML15057A228, ML15089A123, ML15238B576, PLA-7071, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (NRC Order EA-12-049), PLA-7137, Second Six-Month Status Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, PLA-7222, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. (NRC Order EA-12-051), PLA-7296, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (NRC Order EA-12-051), PLA-7610, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (NRC Order EA-12-049)
|
MONTHYEARML13060A3572013-02-28028 February 2013 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design Basis External Events (NRC Order EA-12-049) Project stage: Other ML13183A3892013-07-10010 July 2013 Online Reference Portal for Review of Mitigation Strategies Submittal in Response to Order EA-12-049 Project stage: Approval PLA-7071, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (NRC Order EA-12-049)2013-08-26026 August 2013 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (NRC Order EA-12-049) Project stage: Other PLA-7072, Request for Implementation Date Relief in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2013-08-26026 August 2013 Request for Implementation Date Relief in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Request ML14010A3712014-01-15015 January 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Susquehanna Steam Electric Station, Units 1 and 2, TAC Nos.: MF0888 and MF0889 Project stage: Other ML13339A7642014-01-24024 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies Project stage: Acceptance Review PLA-7137, Second Six-Month Status Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events2014-02-28028 February 2014 Second Six-Month Status Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events Project stage: Other ML14251A2312014-08-27027 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard Requirements for Mitigation Strategies for Beyond-Design-Basis External Events(Nrc Order EA-12-049) PLA-7204 Project stage: Other PLA-7222, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. (NRC Order EA-12-051)2014-08-27027 August 2014 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation. (NRC Order EA-12-051) Project stage: Other ML14323A6802014-11-24024 November 2014 Plan for the Onsite Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Instrumentation Related to Orders EA-12-049 and EA-12-051 Project stage: Other ML15057A2282015-02-25025 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (NRC Order EA-12-049) PLA-7295 Project stage: Other PLA-7296, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (NRC Order EA-12-051)2015-02-25025 February 2015 Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (NRC Order EA-12-051) Project stage: Other ML15089A1232015-04-13013 April 2015 Report for the Audit Regarding Implementation of Mitigating Strategies and Reliable Spent Fuel Pool Instrumentation Related to Orders EA-12-049 and EA-12-051 (TAC Nos. MF0888, MF0889, MF0890, and MF0891 Project stage: Other ML15238B5762015-08-26026 August 2015 Fifth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (NRC Order EA-12-049) Project stage: Other PLA-7610, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (NRC Order EA-12-049)2017-05-31031 May 2017 Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Event (NRC Order EA-12-049) Project stage: Other 2014-11-24
[Table View] |
|
---|
Category:Letter type:PLA
MONTHYEARPLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) PLA-8032, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032)2022-10-28028 October 2022 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments - Supplemental Information (PLA-8032) PLA-8026, Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026)2022-10-19019 October 2022 Biennial 10 Crf 50.59 and 72.48 Summary Report and Changes to Regulatory Commitment (PLA-8026) PLA-8015, Application for Order Approving Indirect Transfer of Control of Licenses2022-09-29029 September 2022 Application for Order Approving Indirect Transfer of Control of Licenses PLA-8030, Evacuation Time Estimate Report PLA-80302022-09-15015 September 2022 Evacuation Time Estimate Report PLA-8030 PLA-8025, Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value2022-08-10010 August 2022 Supplement to License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value PLA-8019, Nd Refueling Outage Owner'S Activity Report, PLA-80192022-07-13013 July 2022 Nd Refueling Outage Owner'S Activity Report, PLA-8019 PLA-8013, Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-80132022-06-27027 June 2022 Response to Request for Additional Information Regarding License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-8013 PLA-8012, 10 CFR 50.46 Annual Report2022-06-10010 June 2022 10 CFR 50.46 Annual Report PLA-8005, Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005)2022-05-23023 May 2022 Response to Request for Additional Information Regarding License Amendment to Revise Reactor Steam Dome Pressure - Low Instrumentation Function Allowable Value (PLA-8005) PLA-8001, Radiation Exposure Information and Reporting System - PLA-80012022-04-28028 April 2022 Radiation Exposure Information and Reporting System - PLA-8001 PLA-7987, Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987)2022-04-26026 April 2022 Radioactive Effluent Release Report and Offsite Dose Calculation Manual - (PLA-7987) PLA-7986, 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-79862022-04-26026 April 2022 2021 Annual Environmental Operating Report (Nonradiological) Docket No. 50-387, PLA-7986 PLA-7985, Annual Radiological Environmental Operating Report2022-04-22022 April 2022 Annual Radiological Environmental Operating Report PLA-7883, Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883)2022-03-31031 March 2022 Proposed Amendment to Licenses NPF-14 and NPF-22: Relocate Technical Specification Unit Staff Qualification Requirements to Quality Assurance Program (PLA-7883) PLA-7995, Property Insurance Program (PLA-7995)2022-03-30030 March 2022 Property Insurance Program (PLA-7995) PLA-7998, Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report2022-03-29029 March 2022 Submittal of Unit 1 Cycle 23 Core Operating Limits Report and Reload Safety Analysis Report PLA-7991, Proof of Financial Protection and Guarantee of Payment of Deferred Premium2022-03-24024 March 2022 Proof of Financial Protection and Guarantee of Payment of Deferred Premium PLA-7984, Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 22022-03-0808 March 2022 Supplement to License Amendment Requesting Adoption of TSTF-505, Revision 2 PLA-7962, Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-79622022-01-0505 January 2022 Application to Revise Technical Specifications to Adopt TSTF-564, Safety Limit MCPR PLA-7962 2024-01-04
[Table view] |
Text
Timothy S. Rausch PPL Susquehanna, LLC Senior Vice President & Chief Nuclear Officer 769 Salem Boulevard Berwick, PA 18603 AUG 2 6 2013 Tel. 570.542.3345 Fax 570.542.1504 tsrausch@ pplweb.com
' TM U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEAM ELECTRIC STATION REQUEST FOR IMPLEMENTATION DATE RELIEF IN RESPONSE TO MARCH 12, 2012 COMMISSION ORDER MODIFYING LICENSES WITH REGARD TO REQUIREMENTS FOR MITIGATION STRATEGIES FOR BEYOND-DESIGN-BASIS EXTERNAL EVENTS (NRC ORDER EA-12-049) Docket No. 50-387 PLA-7072 and No. 50-388
References:
I. NRC Order Number EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, dated March 12, 2012
- 2. NRC Interim Staff Guidance JLD-ISG-2012-01, Compliance with Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events, Revision 0, dated August 29, 2012
- 3. NEI I2-06, Diverse and Flexible Coping Strategies (FLEX) Implementation Guide, Revision 0, dated August 2012
- 4. PLA-6923, PPL Susquehanna's Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049),
dated October 28, 2012
- 5. PLA-6981, PPL Susquehanna 's Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), dated February 28, 2013
- 6. NRC Order EA-13-109, Order to Modify Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Sever Accident Conditions, dated June 6, 2013 On March 12, 2012, the Nuclear Regulatory Commission (NRC issued an order (Reference 1) to PPL Susquehanna, LLC (PPL). Reference 1 was immediately effective and directs PPL to develop, implement, and maintain guidance and strategies to maintain or restore core cooling, containment, and spent fuel pool cooling capabilities in the event
Document Control Desk PLA-7072 of a beyond-design-basis external event. Specific requirements are outlined in of Reference 1.
Reference 1 required submission of an initial status report 60 days following issuance of the final interim staff guidance (Reference 2) and an overall integrated plan pursuant to Section IV, Condition C. Reference 4 provided PPL' s initial status report regarding Mitigation Strategies. Reference 5 provided PPL' s overall integrated plan.
The purpose of this letter is to request relief for the final implementation date for PPL to fully comply with Reference 1,Section IV .A.2.
The Request for Relief described in this letter is based on NRC mandated changes to the Hardened Containment Vent System implementation dates that impact the Mitigation Strategy Overall Integrated Plan. Specifically, the change in implementation dates for the Hardened Containment Vent Order (NRC Order EA-12-050 was rescinded and superseded by NRC Order EA-13-109) impacts the Mitigation Strategy Overall Integrated Plan and implementation timeline. A description of the requested relief and the basis for the relief request is provided below.
NRC Order EA-12-049 requires implementation of Mitigation Strategies to include procedures, guidance, training, and acquisition, staging, or installing of equipment needed for the strategies.
Reference 5 provided PPL's response to the NRC Order EA-12-049. The cover letter identifies that delays in implementing the Hardened Containment Vent System as required by NRC Order EA-12-050 will also affect implementation of the Mitigation Strategies NRC Order EA-12-049 actions.
The Reference 5 enclosure describes PPL' s Mitigation Strategies that are based on venting the containment using the Hardened Containment Vent System. It also describes that a modification is required to install a Hardened Containment Vent System (HCVS).
Thus PPL's response to NRC Order EA-12-049 response provided in Reference 5 was premised on installation and use of a Hardened Containment Vent System as required by NRC Order EA-12-050.
Upon issuance of NRC Order EA-13-109 (Reference 6), the NRC staff changed technical and schedule requirements applicable to the Hardened Containment Vent System and rescinded the requirements of the NRC Order EA-12-050.
Document Control Desk PLA-7072 As a result, full compliance to the Mitigation Strategies required by NRC Order EA-12-049 and described in Reference 5 for PPL Susquehanna Units 1 and 2 will not be achieved until compliance to NRC Order EA-13-109 is achieved. Relief/relaxation from the NRC Order EA-12-049 IV.A.2 requirements is therefore required.
PPL will be in compliance with the aspects of the Reference 5 Mitigation Strategies for Unit 1 and Unit 2 that do not rely upon a Hardened Containment Vent System per the original schedule, unless otherwise described.
This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Mr. John L. Tripoli at 570-542-3100.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: t>(2..\e ~ \'5 Sincerely, Copy: NRC Region I Mr. J. E. Greives, NRC Sr. Resident Inspector Ms. Jessica A. Kratchman, NRR/JLD/PMB, NRC Mr. J. A. Whited, NRC Project Manager Mr. L. J. Winker, PA DEP/BRP