Annual Environmental Operating Report (Non-Radiological) PLA-6348 for 2007
ML081350496
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 04/29/2008
From: Mckinney B
Susquehanna
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
PLA-6348
Download: ML081350496 (22)


Text

'V

.. Britt T. McKInney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.3149 Fax 570.542.1504 btmckinney@pplweb.com s.

pp ITM APR 2 9 2008 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Mail Stop O-P 1-17 11555 Rockville Pike Rockville, MD 20852 SUSQUEHANNA STEAM ELECTRIC STATION ANNUAL ENVIRONMENTAL OPERATING REPORT (NON-RADIOLOGICAL)

PLA-6348 Docket Nos. 50-387

.50-388 The Susquehanna Steam Electric Station Annual Environmental Operating Report (Non-Radiological) is hereby submitted for the calendar year 2007 in accordance with the Environmental Protection Plan.

Should you have any questions or require additional information, please contact Mr. Rocco R. Sgarro, Manager - Nuclear Regulatory Affairs, at (610) 774-7552.

B. T. McKinney Attachment Copy: Mr. S. J. Collins, NRC Region I, Regional Administrator Mr. R. R. Janati, DEP/BRP Mr. F. W. Jaxheimer, NRC Sr. Resident Inspector Mr. B. K. Vaidya, NRC Project Manager

_ýYEfý

Susquehanna Steam

,Electric Station Units 1 & 2 2007 ANNUAL REPORT Annual Environmental Operating

Report, (Nonradiological) 1 RA April'2008

Susquehanna Steam Electric Station Units 1 & 2 2007 ANNUAL ENVIRONMENTAL OPERATING REPORT (NONRADIOL OGICAL)

  • i PPL Susquehanna, LLC Berwick, PA April 2008

SUSQUEHANNA STEAM ELECTRIC STATION ANNUAL ENVIRONMENTAL OPERATING REPORT (NONRADIOLOGICAL) 2007 Curtis H. Saxton

/21?6" Prepared by:

Reviewed by:

Curtis H. Saxton Supervisor - Services & Programs Date:

41A10 Date:

q1) d 6 e Bruce E. Rhoads Manager - Plant Chemistry Approved by:

Date:

Operations

Susquehanna Steam Electric Station Units 1 & 2 2007 ANNUAL ENVIRONMENTAL OPERATING REPORT (NONRADIOL OGICAL)

Facility Operating License Nos. NPF-14 & NPF-22 Docket Nos. 50-387 & 50-388 Prepared by Plant Chemistry PPL Susquehanna, LLC Berwick, PA April 2008

FOREWORD The Susquehanna Steam Electric Station (Susquehanna SES) consists of two boiling water reactors with design electrical ratings of 1220 megawatts electrical (MWE) net for Units 1 and 2, respectively. The site consists of approximately 1,700 acres located in Salem Township, Luzerne County, Pennsylvania, approximately five miles northeast of Berwick, Pennsylvania. An additional 700 acres of PPL mostly undeveloped and recreational lands are located on the East Side of the Susquehanna River in Conyngham and Hollenback Townships. Under terms of an agreement finalized in January 1978, 90% of the Susquehanna SES is owned by PPL Susquehanna, LLC (Licensee) and 10% by the Allegheny Electric Cooperative, Inc.

This report discusses environmental commitments and impacts from January 1, 2007 through December 31, 2007. In summary it documents that environmental commitments were met and there was no significant adverse environmental impact from station operation.

TABLE OF CONTENTS SECTION PAGE NO.

Foreword Table of Contents 1.0 OBJECTIVE 1-1 2.0 ENVIRONMENTAL ISSUES 2-1 2.1 Aquatic Issues 2-1 2.2 Terrestrial Issues 2-3 2.2.1 Studies Previously Completed 2-3 2.2.2 Sound Level Survey 2-3 2.2.3 Maintenance of Transmission Line Corridors 2-3 2.3 Cultural Resources Issues 2-3 3.0 CONSISTENCY REQUIREMENTS 3-1 3.1 Plant Design and Operation 3-1 3.2 Reporting Related to NPDES Permits and State Certifications 3-2 3.3 Changes Required for Compliance with other Environmental 3-2 Regulations 4.0 ENVIRONMENTAL CONDITIONS 4-1 4.1 Unusual or Important Environmental Events 4-1 4.2 Environmental Monitoring 4-1 4.2.1 General Monitoring 4-1 4.2.2 Maintenance of Transmission Line Corridors 4-1 ii

SECTION PAGE NO.

5.0 ENVIRONMENTAL PROTECTION PLAN REPORTING REQUIREMENTS 5-1 5.1 Review and Audit 5-1 5.2 Records Retention 5-1 5.3 Changes in Environmental Protection Plan 5-2 5.4 Plant Reporting Requirements 5-2 5.4.1 Routine Reports 5-2 5.4.2 Nonroutine Reports 5-2 6.0 ATTACHMENTS 6-1 Table 2.1-1 2007 Shad Impingement Monitoring Program Figure 3.2-1 PLE 0024361, March 2007 Monthly Discharge Monitoring Report Figure 5.1-1 Auditing Organization Chart (2007) iii

1.0 OBJECTIVE The Licensee has developed procedures and guidelines to ensure that operation of Susquehanna SES does not adversely affect the environment in the vicinity of the station. Also, these procedures allocate responsibilities and define interfaces necessary to monitor environmental impacts. They include coordination of U.S.

Nuclear Regulatory Commission (NRC) requirements with other federal, state, and local requirements for environmental protection.

The objective of this 2007 Annual Environmental Operating Report (Nonradiological) is to provide a summary of both environmental programs and procedures. This report is required by the Final Environmental Statement (FES) for the operation of the Susquehanna SES, Unit 1 and 2, NUREG-0564, June 1981, and Appendix B - Environmental Protection Plan (EPP) to Operating Licenses, No. NPF-14 and No. NPF-22. The 2007 report is the 26th Annual Environmental Operating Report (Nonradiological) submitted to meet EPP requirements.

The Licensee submitted an Environmental Report-Operating License Stage for Susquehanna SES to the NRC in May 1978. This report reviewed the results of the preoperational environmental programs and described the preoperational and proposed operational environmental monitoring programs. The NRC and other agencies reviewed this report and made recommendations for operational environmental monitoring programs which were listed in the FES.

1-1

2.0 ENVIRONMENTAL ISSUES 2.1 Aquatic Issues The aquatic monitoring program for operation of the Susquehanna SES is divided into two parts. Part 1 includes effluent monitoring required by a National Pollutant Discharge Elimination System (NPDES) permit issued by the Pennsylvania Department of Environmental Protection (PaDEP).

Monthly discharge monitoring reports are submitted to the PaDEP as part of the permitting requirements. The station's operational NPDES permit No. PA-0047325 was reissued on September 1, 2005, and expires on August 31, 2010. Part 2 of the aquatic monitoring program deals with programs listed in the FES or recommended by the PaDEP or U.S. Fish and Wildlife Service.

The PaDEP is responsible for regulating the water quality permit for the Susquehanna SES. The NPDES permit deals with discharge parameters for the Susquehanna SES Sewage Treatment Plant, Cooling Tower blowdown, and miscellaneous low volume waste discharges. The Cooling Tower blowdown also includes in-plant process streams which discharge to the Susquehanna River. Various low volume waste sumps discharge to the storm sewers which flow into Lake Took-a-while, and eventually into the Susquehanna River. A copy of the NPDES permit was provided to the NRC in 2005 (PLA-5952 September 2, 2005).

American Shad The Susquehanna Anadromous Fish Restoration Committee continued to administer programs to restore American Shad (Alosa sapadissima) to the Susquehanna River in 2007. The restoration program is a continuing commitment to return shad and other migratory fishes to historic spawning and nursery waters above major dams in the Susquehanna River.

The Susquehanna SES intake screens were monitored daily for impinged juvenile American Shad from 1 August through 28 September 2007.

During the two-month period, 64 fish of nine species, predominately channel catfish (33) and smallmouth bass (19) were collected along with 234 crayfish (Table 2.1-1). Most fish were young-of-the year or juveniles; no juvenile shad were taken. The screens did not operate from 8-17 August 2007 due to PPL maintenance activities.

2-1

Biofoulina Mollusk Monitorina The biofouling mollusk monitoring program continued at the Susquehanna SES in 2007. Since the arrival of Asian clams in the vicinity of the plant, the program continues to include biweekly artificial substrate inspections at the River Intake Building and monthly inspections of artificial substrates and the cement shoreline of the Engineered Safeguards Service Water Spray Pond. The spray pond is also inspected annually via scuba. River substrates were inspected at select sites this summer from Millersburg to Great Bend Pennsylvania. While the Asian clam is present in the vicinity of the plant, its densities are still relatively low.

In July, personnel of the Pennsylvania Department of Environmental Protection reported that adult zebra mussels had been collected in the river in the vicinity of Hallstead, Pennsylvania. Zebra mussels have not yet been found south of this location in the Susquehanna River.

During September 2007, PPL Susquehanna personnel treated the spray pond with biocide to kill Asian clams in the pond.

2-2

2.2 Terrestrial Issues 2.2.1 Studies Previously Completed Terrestrial environmental studies completed prior to 1989 included Cooling Tower bird impaction and sound level surveys.

2.2.2 Sound Level Survey An increase in station power generation of 5% was completed during spring 1995. A power uprate sound level survey was conducted in June 1995.

2.2.3 Maintenance of Transmission Line Corridors Transmission line corridor vegetation maintenance and inspection records are maintained by the Planning and Engineering Services Department of PPL Electric Utilities and are available upon request.

There were no adverse environmental impacts to transmission corridors reported in 2007. Records will be maintained for five years.

2.3 Cultural Resources Issues Environmental Protection Plan actions required to satisfy Title 36, Code of Federal Regulations Part 800, relating to archeological sites, were completed in 1987. The Advisory Council on Historic Preservation (ACHP), in accordance with 36 CFR 800.6 (a)(1), approved the NRC's determination of "no adverse effect" for archeological sites SES-3, SES-6, SES-8, and SES-1 1 located on the Licensee's property (NRC letter dated October 28, 1987, to ACHP).

As part of the determination-of-effect process, the Licensee committed to and is taking appropriate measures to mitigate impacts from plant maintenance and operation to sites SES-3, SES-6, SES-8, SES-1 1 and 36LU43. There was no impact to these sites from plant maintenance and operation in 2007.

2-3

3.0 CONSISTENCY REQUIREMENTS 3.1 Plant Design and Operation In accordance with the Environmental Protection Plan (EPP), the Licensee shall prepare and record an environmental evaluation of proposed changes in plant design, operation, or performance of any test or experiment which may significantly affect the environment. Before initiating such activities, the Licensee shall provide a written evaluation and obtain prior approval from the Director, Office of Nuclear Reactor Regulation. Criteria for the need to perform an environmental evaluation include: (1) a significant increase in any adverse environmental impact previously evaluated by the NRC or Atomic Safety and Licensing Board, (2) a significant change in effluent or power level, or (3) a matter not previously evaluated which may have a significant adverse environmental impact.

The EPP requires that if an activity meets any of the criteria to perform an environmental evaluation, the NRC will be notified. If the change, test, or experiment does not meet any of these criteria, the Licensee will document the evaluation and allow the activity to occur.

During operation of the Susquehanna SES in 2007, there were five proposed activities that the Licensee reviewed as part of the unreviewed environmental question program. None of these activities were determined to involve an unreviewed environmental question or require prior NRC notification. The activities reviewed were:

1.

Submittal of Extended Power Uprate River Water Consumptive Use Application to Susq. River Basin Commission.

2.

Relocation of underground electrical conduit at Susquehanna Riverlands.

3.

Reutilization of Sulfuric Acid Injection tanks for U1/U2 Extended Power Uprate Project Plan.

4.

Construction of Steam Dryer Shielded Storage Enclosure

5.

Installation of Ground Water Wells for Tritium Monitoring 3-1

3.2 Reportinq Related to NPDES Permits and State Certifications The US Nuclear Regulatory Commission was provided a copy of PLE-0024361 (April 19, 2007), which was sent to PaDEP as notification of an NPDES noncompliance that occurred in March 2007 at the Sewage Treatment Plant. Refer to Figure 3.2-1 for PLE-002461 cover letter.

The Susquehanna SES has an NPDES permit; therefore, state certification pursuant to Section 401 of the Clean Water Act is not required.

3.3 Changes Required for Compliance with Other Environmental Regulations On September 12, 2007 the Susquehanna River Basin Commission approved PPL Susquehanna's Extended Power Uprate (Docket No.

19950301 -1) for riverwater withdrawal and consumptive use.

3-2

4.0 ENVIRONMENTAL CONDITIONS 4.1 Unusual or Important Environmental Events During 2007, there was one operating occurrence, described below, reviewed as part of the significant environmental event evaluation program. There were no significant or adverse environmental effects related to station operation and there were no EPP noncompliances.

1.

A significant environmental event evaluation was prepared for a diesel fuel spill of approximately 70 gallons from a ruptured saddle tank on a water truck. The spill was immediately contained and cleaned up. There was no release to a waterway. NRC notification was made (Event Number: 43589) pursuant to 1 OCFR50.72(b)(2)(xi) as an event related to the protection of environment since a courtesy notification to the PaDEP was made.

This event was determined not to be a significant environmental event.

4.2 Environmental Monitoring 4.2.1 General Monitoring With the exception of aquatic monitoring required for compliance with the NPDES permit, all monitoring of station operational impacts on aquatic and terrestrial biota listed in the FES and Appendix B of the operating license have been completed.

4.2.2 Maintenance of Transmission Line Corridors In 2007, the Field Services Department of PPL Electric Utilities maintained transmission line vegetation maintenance and inspection records.

4-1

5.0 ENVIRONMENTAL PROTECTION PLAN REPORTING.

REQUIREMENTS 5.1 Review and Audit The Licensee has established procedures for an independent group to review and audit compliance with the EPP. Audits of EPP compliance are conducted by Quality Assurance. The Manager-Quality Assurance is responsible for verifying compliance with the EPP. The Vice President-Nuclear Operations is responsible for environmental monitoring and for providing any related support concerning licensing. The Manager - Plant Chemistry is responsible for day-to-day environmental monitoring.

The Auditing Organization Chart (Fig. 5.1-1) lists the groups utilized in reviewing and auditing of the Susquehanna SES environmental programs as well as those responsible for managing these programs. PPL's Corporate Director of Environmental Management is available to provide auditing support as necessary.

There are periodic audits of the EPP program. The next audit of the EPP is scheduled for 2008 as part of an overall Chemistry Program Audit.

5.2 Records Retention Records and logs relative to environmental aspects of plant operation and audit activities are retained in the Nuclear Records System. This system provides for review and inspection of environmental documents, which are available to the NRC upon request.

All records concerning modifications of plant structures, systems and components which are determined to potentially affect the continued protection of the environment are retained for the life of the plant. All other records, data, and logs relating to the environmental programs and monitoring are retained for at least five years or, where applicable, in accordance with the requirements of other agencies. Transmission line corridor vegetation maintenance records are maintained by PPL Electrical Utilities per section 2.2.3 of this report.

5-1

5.3 Changes in Environmental Protection Plan No changes were made to the EPP during 2007.

5.4 Plant Reporting Requirements 5.4.1 Routine Reports This Annual Environmental Operating Report (Nonradiological) was prepared to meet routine reporting requirements of the EPP for 2007. It provides summaries and analyses of environmental protection activities required in Subsection 4.2 of the EPP for the reporting period.

5.4.2 Nonroutine Reports There were no unusual or Important Environmental Events as identified in the Environmental Protection Plan that required reporting in 2007.

5-2

6.0 ATTACHMENTS Table 2.1-1 2007 Shad Impingement Monitoring Program Figure 3.2-1 PLE 0024361, March 2007 Monthly Discharge Monitoring Report Cover Letter Figure 5.1-1 Auditing Organization Chart (2007) 6-1

TABLE 2.1-1 2007 AMERICAN SHAD IMPINGEMENT PROGRAM I

-Dt

. T im Itm Foun on Trs Ba/rvlngSre 2007 Shad I

Fish Other 1 Aug 1200 Nets set to begin sampling.

2 Aug 1500 0

10 smallmouth bass 19 crayfish 3 Aug 1400 0

5 smallmouth bass 9 crayfish 4-5 Aug Nets set but not checked.

6 Aug 1430 0

2 smallmouth bass 21 crayfish 1 tessellated darter 7 Aug 1300 0

1 smallmouth bass 3 crayfish 1 spottail shiner 8 Aug 1400 0

0 0

PPL working on river intake screens.

No water flowing through nets.

9 Aug 1030 0

0 F

I_ No water flowing through nets.

10-12 Aug Nets set but not checked.

13 Aug 1500 0

0 0

No water flowing through nets.

14 Aug 1010 0

0 0

No water flowing through nets.

15 Aug Nets set but not checked.

16 Aug 1100 0

0 0

No water flowing through nets.

17 Aug 1200 0

0 0

No water flowing through nets.

18-19 Aug Nets set but not checked.

20 Aug 1445 0

3 channel catfish 26 crayfish 1 rock bass 1 spotfin shiner PPL work on river intake screens appears to be completed.

21 Aug 1205 0

1 channel catfish 14 crayfish 1 rock bass 22 Aug 1400 0

5 channel catfish 9 crayfish 1 northern pike 1 spottail shiner 1 brown bullhead 23 Aug 1430 0

2 channel catfish 6 crayfish 24 Aug 1320 0

5 channel catfish 7 crayfish 25-26 Aug Nets set but not checked.

27 Aug 1500 0

5 channel catfish 14 crayfish 28 Aug Nets set but not checked.

29 Aug 0900 0

0 3 crayfish 30 Aug 1000 0

0 6 crayfish 31 Aug 1130 0

0 2 crayfish 6-2

TABLE 2.1-1 (continued)

Dat Tim Itm Fon on Trs Ba/Taeln Scree 2007 I Shad I

Fish Other 1-3 Sep Nets set but not checked.

4 Sep 1320 0

0 16 crayfish 5 Sep 0845 0

2 channel catfish 3 crayfish 6 Sep 0937 0

1 spotfin shiner 3 crayfish 7 Sep 1140 0

1 channel catfish 1 crayfish 8-9 Sep Nets set but not checked.

10 Sep 1450 0

0 16 crayfish 11 Sep 0935 0

0 3 crayfish 12 Sep 0930 0

0 2 crayfish 13 Sep 1130 0

0 5 crayfish High volume of leaves/debris in traveling screen net.

14 Sep 1145 0

1 bluntnose minnow 1 crayfish 15-16 Sep Nets set but not checked.

17 Sep 1100 0

1 smallmouth bass 2 crayfish 1 rock bass 18 Sep 0900 NA Leaves/debris combined with flow through 0

traveling screen net prevented lifting net onto (trash bar) platform for inspection.

19 Sep 0910 NA Had to dump contents of traveling screen net 2 crayfish in order to lift onto platform.

(trash bar) 20 Sep 1025 0

0 3 crayfish 21 Sep 1130 0

0 2 crayfish 22-23 Sep Nets set but not checked.

24 Sep 0850 10 1 3 channel catfish 10 crayfish 25 Sep Nets set but not checked.

26 Sep 0750 0

1 channel catfish 8 crayfish 27 Sep 0830 0

2 channel catfish 10 crayfish 1 tessellated darter 28 Sep 0825 0

3 channel catfish 8 crayfish 28 Sep Nets removed.

TOTALS 0 shad 64 fish - 9 species 234 crayfish 33 channel catfish 19 smallmouth bass 3 rock bass 2 spottail shiner 2 spotfin shiner 2 tessellated darter 1 northern pike 1 brown bullhead 1 bluntnose minnow 6-3

i I

Figure 3.2-1 April 19, 2007 P1 P4 STM Ms. Kate Crowley Water Quality Regional Manager Bureau of Water Quality Management Pennsylvania Department of Environmental Protection Two Public Square Wilkes-Barre, PA 18711-0790 SUSQUEHANNA STEAM ELECTRIC STATION DISCHARGE MONITORING REPORT - MARCH 2007 NPDES PERMIT NO. PA 0047325 PLE 0024361

Dear Ms. Crowley:

Pursuant to Part A,3.b.(1) of NPDES Permit No. PA 0047325, enclosed is the Susquehanna Steam Electric Station (SES) Discharge Monitoring Report (DMR) for March and the Monthly Facility Report Form (01-112).

During March, the monthly average CBOD limit was exceeded at the Sewage Treatment Plant (outfall 079) due to increased flows resulting from a large population of temporary workers on site.

Preemptive measures and immediate corrective actions were taken to improve treatment, including increasing air, alternately loading aeration beds, and increasing sludge hauling frequency; however, it took some time for the plant to respond to an upset and it was not until the first sample collected in April that all parameters including CBOD were again within permit limits.

If you have any questions, please call Curt Saxton (570) 542-1879 or Jerrold McCormick at (570) 542-3014.

Respectfully yours, Bruce E. Rhoads Manager - Plant Chemistry CHS/kds -March 2007 DMR (12 pages) - Monthly Facility Report Form (1 page)

Copy to:

Ms. N. Green, EPA Region III NRC, ATTN: Document Control Desk NRC, Region 1 Mr. A. J. Blamey, NRC, Sr. Resident Inspector Mr. R. V. Guzman, NRC, Project Manager

FIGURE 5.1-1 AUDITING ORGANIZATION CHART (2007) 6-5