MONTHYEARPLA-8141, Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-81412024-09-18018 September 2024 Response to Request for Additional Information Regarding Relief Request 1RR06, PLA-8141 PLA-8142, Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-81422024-09-18018 September 2024 Registration for the Use of Spent Fuel Storage Casks 306, 309, and 307 - PLA-8142 PLA-8117, 23rd Refueling Outage Owners Activity Report (PLA-8117)2024-07-23023 July 2024 23rd Refueling Outage Owners Activity Report (PLA-8117) PLA-8126, Response to Request for Confirmation of Information Regarding Relief Request 1RR062024-05-29029 May 2024 Response to Request for Confirmation of Information Regarding Relief Request 1RR06 PLA-8122, Annual Radiological Environmental Operating Report (PLA-8122)2024-05-28028 May 2024 Annual Radiological Environmental Operating Report (PLA-8122) PLA-8123, Main Steam Isolation Valve Leakage2024-05-23023 May 2024 Main Steam Isolation Valve Leakage PLA-8115, Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115)2024-05-23023 May 2024 Relief Request IRR06 One Time Extension to the Fourth 10-Year Inservice Testing Program Interval (PLA-8115) PLA-8101, Re 2023 Annual Report of Radiation Exposure2024-04-22022 April 2024 Re 2023 Annual Report of Radiation Exposure PLA-8095, 2023 Annual Radiological Environmental Operating Report (PLA-8095)2024-04-22022 April 2024 2023 Annual Radiological Environmental Operating Report (PLA-8095) PLA-8094, Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-80942024-04-22022 April 2024 Radioactive Effluent Release Report and Offsite Dose Calculation Manual PLA-8094 PLA-8113, Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113)2024-04-11011 April 2024 Response to Request for Additional Information Regarding Relief Request 4RR-11 (PLA-8113) PLA-8102, Annual Environmental Operating Report (Nonradiological) PLA-81022024-04-11011 April 2024 Annual Environmental Operating Report (Nonradiological) PLA-8102 PLA-8112, Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-81122024-04-0909 April 2024 Relief Request 4RR-11 Relief from End of Interval Boundary Leakage Test PLA-8112 PLA-8110, Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110)2024-04-0404 April 2024 Submittal of Unit 1 Cycle 24 Core Operating License Report (Pla 8110) PLA-8100, Property Insurance Program (PLA-8100)2024-04-0101 April 2024 Property Insurance Program (PLA-8100) PLA-8109, Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109)2024-03-21021 March 2024 Supplement to Request for Exemption from Certain Requirements of 10 CR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance (PLA-8109) PLA-8107, Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance2024-03-19019 March 2024 Request for Exemption from Certain Requirements of 10 CFR 72.212 and 10 CFR 72.214 Resulting from Fuel Basket Design Control Compliance PLA-8099, Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099)2024-02-13013 February 2024 Proof of Financial Protection and Guarantee of Payment of Deferred Premiums (PLA-8099) PLA-8096, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2024-01-0404 January 2024 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8077, Emergency Plan Revision 67 (PLA-8077)2023-12-27027 December 2023 Emergency Plan Revision 67 (PLA-8077) PLA-8088, Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088)2023-12-0505 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks and Security Event Notifications Implementation (PLA-8088) PLA-8089, Submittal of Revision to Inservice Testing Program Plan2023-12-0505 December 2023 Submittal of Revision to Inservice Testing Program Plan PLA-8084, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.22023-11-29029 November 2023 Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 PLA-8091, Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091)2023-11-0808 November 2023 Response to Request for Additional Information Regarding Proposed Relief Request for the Fifth 10-Year Inseervice Inspection Interval (PLA-8091) PLA-8082, Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program2023-11-0202 November 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Application to Revise Technical Specifications to Adopt TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program PLA-8080, Proposed Relief for Valve 251130 (PLA-8080)2023-08-14014 August 2023 Proposed Relief for Valve 251130 (PLA-8080) PLA-8074, Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval2023-08-0303 August 2023 Proposed Relief Request for the Fifth 10-Year Inservice Test Program Interval PLA-8076, Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076)2023-07-20020 July 2023 Unit 2 - 21st Refueling Outage Owner'S Activity Report (PLA-8076) PLA-8078, Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-80782023-07-0505 July 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report, Revision 1, PLA-8078 PLA-8054, Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence2023-06-0808 June 2023 Proposed Amendment to Licenses NPF-14 and NPF-22: Remove Control Rod Operability Separation Criteria and Replace Reference to Banked Position Withdrawal Sequence with the Analyzed Rod Position Sequence PLA-8073, Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval2023-06-0101 June 2023 Proposed Relief Request for the Fifth 10-Year Inservice Inspection Interval PLA-8067, Notification of Completion of Emergence from Bankruptcy (PLA-8067)2023-05-17017 May 2023 Notification of Completion of Emergence from Bankruptcy (PLA-8067) PLA-8064, Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064)2023-05-17017 May 2023 Response to NRC Regulatory Issue Summary 2023-01 (PLA-8064) PLA-8066, Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-80662023-05-0808 May 2023 Notification of Planned Closing Date and Information Identified in March 30, 2023 Order, PLA-8066 PLA-8053, Radiation Exposure Information and Reporting System2023-04-27027 April 2023 Radiation Exposure Information and Reporting System PLA-8058, Annual Radiological Environmental Operating Report (PLA-8058)2023-04-26026 April 2023 Annual Radiological Environmental Operating Report (PLA-8058) PLA-8041, Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041)2023-04-25025 April 2023 Radioactive Effluent Release Report and Offsite Dose Calculation Manual (PLA-8041) PLA-8047, 2022 Annual Environmental Operating Report (Nonradiological), PLA-80472023-04-19019 April 2023 2022 Annual Environmental Operating Report (Nonradiological), PLA-8047 PLA-8062, Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-80622023-04-11011 April 2023 Supplement to Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 252F007B, PLA-8062 PLA-8061, Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-80612023-04-10010 April 2023 Relief Request 4RR-10 Relief from Code Seal Weld Requirement for Valve 25F007B, PLA-8061 PLA-8060, Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060)2023-03-30030 March 2023 Submittal of Unit 2 Cycle 22 Core Operating Limits Report (PLA-8060) PLA-8057, Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-80572023-03-15015 March 2023 Application for Order Approving Indirect Transfer of Control of Licenses and Approving Conforming License Amendments- Supplemental Information, PLA-8057 PLA-8052, (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums2023-02-13013 February 2023 (Sses), Proof of Financial Protection and Guarantee of Payment of Deferred Premiums PLA-8048, Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence2023-01-14014 January 2023 Response to Request for Additional Information Regarding License Amendment Requesting Temporary Addition of Analyzed Rod Position Sequence PLA-8042, Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence2023-01-10010 January 2023 Proposed Emergency Amendment to License NPF-22: Temporary Addition of Analyzed Rod Position Sequence PLA-8039, Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information2022-12-22022 December 2022 Application for Order Approving Indirect Transfer of Control of License Amendments - Supplemental Information PLA-8038, Notification of Petition for Bankruptcy (PLA-8038)2022-12-14014 December 2022 Notification of Petition for Bankruptcy (PLA-8038) PLA-8036, Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-80362022-11-30030 November 2022 Registration for the Use of Spent Fuel Storage Casks 203, 202, and 204, PLA-8036 PLA-8035, Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-80352022-11-0808 November 2022 Registration for the Use of Spent Fuel Storage Casks 205, 200, and 201, PLA-8035 PLA-8031, Emergency Plan Revision 66 (PLA-8031)2022-11-0707 November 2022 Emergency Plan Revision 66 (PLA-8031) 2024-09-18
[Table view] |
Text
Robert A. Saccone Vice President - Nuclear Operations PPLSusquehanna, LLC 769 Salem Boulevard Berwick, PA 18603 PIaI F I
%Na%a a
Tel. 570.542.3698 Fax 570.542.1504 rasacconeepplweb.com P W MAY 18 2006 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station OP1-17 Washington, DC 20555 SUSQUEHANNA STEAM ELECTRIC STATION SUPPLEMENT TO PROPOSED AMENDMENT NO. 281 TO LICENSE NPF-14 AND PROPOSED AMENDMENT NO. 251 TO LICENSE NPF-22: "APPLICATION FOR LICENSE AMENDMENT AND RELATED TECHNICAL SPECIFICATION CHANGES TO IMPLEMENT FULL-SCOPE ALTERNATIVE SOURCE TERM IN ACCORDANCE WITH 10 CFR 50.67" Docket Nos. 50-387 PLA-6055 and 50-388
References:
- 1) PLA-5963, Mr. B. T.McKinney (PPL) to Docunent ControlDesk (USNRC)
ProposedAmendment No. 281 to License NPF-14 and ProposedAmendment No. 251 to License NPF-22: "ApplicationforLicenseAmendment andRelated Techlnical Specification Changes To Implement Full-Scope Alternative Source Term In Accordance with 10 CFR 50.67, " dated October 13, 2005.
The purpose of this letter is to supplement the Reference l request for an amendment to the licensing basis for the Susquehanna Steam Electric Station (SSES) Units 1 and 2 that supports a full implementation application of an Alternative Source Term (AST) methodology.
In Reference 1, PPL indicated that the Recirculation Pump Seizure Event AST Analysis would be provided as a separate document at a later date. PPL revised the Recirculation Pump Seizure Analysis and has concluded, in accordance with 10 CFR 50.59, that NRC approval is not required. Thus, a separate submittal will not be provided to NRC for the AST impacts on the Recirculation Pump Seizure Analysis.
As discussed with the SSES Project Manager on January 10, 2006, PPL identified an error subsequent to the submittal of Reference 1. The error involved incorrect transposition of calculation results in a calculation result summary table which was then also carried into results tables presented in Sections 4.6.5 and 4.6.6 of the detailed AST Safety Assessment Report (Attachment 2 of Reference 1). Attachment l to this letter contains the markup of the Reference 1, Attachment 2 affected page showing the correct values.
Awl
Document Control Desk PLA-6055 to this letter contains the revised calculation EC-RADN-1 126, Revision 1, provided to replace the Revision 0 version of the calculation originally provided in 2 of Reference 1.
If you have any questions regarding this submittal, please contact Mr. Michael H. Crowthers at (610) 774-7766.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on: C 6 Respectfully, Robert accone Vice President - Nuclear Operations Attachments:
Attachment 1 - Markup of the Reference 1, Attachment 2 Affected Page Showing the Correct Values Attachment 2 - Revised Calculation EC-RADN-I 126, Revision I cc: NRC Region I Mr. A. Blarney, NRC Sr. Resident Inspector Mr. R. V. Guzman, NRC Project Manager Mr. R. Janati, DEP/BRP
Attachment 1 to PLA-6055 Markup of the Reference 1, Attachment 2 Affected Page Showing the Correct Values
Attachment 2 to PLA-5963 Page 49 of 60 An unidentified unfiltered inleakage rate of 500 cfm is borservatively assumed in the RADTRAD model. This inleakage bounds the tracer gas test results (including error band) from the December 2004 SSES CRHE inleakage test.
In addition, 10 cfm of unfiltered inleakage is added to the CRHE to account for ingress/egress of personnel.
4.6.4 Radiological Transport Modeling (see Figures 4 & 11)
'The radiological release modeled in this analysis is consistent with RG 1.183.
The activity was released from the Reactor Building via the SGTS via the environment over a 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> period.
The 0 - 2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> CRHE z/Q from the SGTS exhaust vent to the Control Room outside air intake of 1.45E-03 sec/in3 was used in the analysis.
4.6.5 Results - Control Room Operator Dose The RADTRAD computer code was used to determine the Control Room operator dose for the FHA/EHA events. Table 4.6-2 shows the proposed licensing basis dose limit for the FHA/EHA compared to the regulatory limit.
Table 4.6-2 FHA/EHA Control Room Operator D se (rem)
Calculation TEDE RG 1.183 TEDE CR Operator Dose (FHA) 4.4 0 I 5.0 CR Operator Dose (EHA) 0.13 5.0 4.6.6 Results - Offsite Doses The RADTRAD computer code was used to'determiiine the offsite doses. Table 4.6-3 shows the proposed licensing basis dose limit for the FHA/EHA compared to the regulatory limit.
Table 4.6 FHA/EHA OffiAte Doses (rem)
' " lCalculation TEDE l RGI1.183 TEDE FHA EAB Dose l -1.8CW q 6.3 LPZ Dose l : ,br 6.3 EAB Dose 1.74 ' 6.3 LPZ Dose 0.10 ' 6.3