MONTHYEARML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions PLA-3027, Monthly Operating Repts for Apr 19881988-04-30030 April 1988 Monthly Operating Repts for Apr 1988 PLA-2938, Monthly Operating Repts for Oct 19871987-10-31031 October 1987 Monthly Operating Repts for Oct 1987 PLA-2924, Monthly Operating Repts for Sept 19871987-09-30030 September 1987 Monthly Operating Repts for Sept 1987 PLA-2913, Monthly Operating Repts for Aug 19871987-08-31031 August 1987 Monthly Operating Repts for Aug 1987 PLA-2900, Monthly Operating Rept for Jul 19871987-07-31031 July 1987 Monthly Operating Rept for Jul 1987 PLA-2886, Monthly Operating Repts for June 19871987-06-30030 June 1987 Monthly Operating Repts for June 1987 PLA-2866, Monthly Operating Repts for May 19871987-05-31031 May 1987 Monthly Operating Repts for May 1987 PLA-2853, Monthly Operating Repts for Apr 19871987-04-30030 April 1987 Monthly Operating Repts for Apr 1987 PLA-2832, Monthly Operating Repts for Mar 19871987-03-31031 March 1987 Monthly Operating Repts for Mar 1987 PLA-2810, Monthly Operating Repts for Feb 19871987-02-28028 February 1987 Monthly Operating Repts for Feb 1987 PLA-2798, Monthly Operating Repts for Jan 19871987-01-31031 January 1987 Monthly Operating Repts for Jan 1987 PLA-2782, Monthly Operating Repts for Dec 19861986-12-31031 December 1986 Monthly Operating Repts for Dec 1986 PLA-2765, Monthly Operating Repts for Nov 19861986-11-30030 November 1986 Monthly Operating Repts for Nov 1986 PLA-2753, Monthly Operating Repts for Oct 19861986-10-31031 October 1986 Monthly Operating Repts for Oct 1986 ML20207F9501986-09-30030 September 1986 Monthly Operating Repts for Sept 1986 PLA-2713, Monthly Operating Repts for Aug 19861986-08-31031 August 1986 Monthly Operating Repts for Aug 1986 PLA-2701, Monthly Operating Rept for Jul 19861986-07-31031 July 1986 Monthly Operating Rept for Jul 1986 PLA-2675, Monthly Operating Repts for June 19861986-06-30030 June 1986 Monthly Operating Repts for June 1986 PLA-2660, Monthly Operating Repts for May 19861986-05-31031 May 1986 Monthly Operating Repts for May 1986 PLA-2639, Monthly Operating Repts for Apr 19861986-04-30030 April 1986 Monthly Operating Repts for Apr 1986 PLA-2624, Monthly Operating Repts for Mar 19861986-03-31031 March 1986 Monthly Operating Repts for Mar 1986 PLA-2606, Monthly Operating Repts for Feb 19861986-02-28028 February 1986 Monthly Operating Repts for Feb 1986 PLA-2595, Monthly Operating Repts for Jan 19861986-01-31031 January 1986 Monthly Operating Repts for Jan 1986 PLA-2580, Monthly Operating Repts for Dec 19851985-12-31031 December 1985 Monthly Operating Repts for Dec 1985 PLA-2567, Monthly Operating Repts for Nov 19851985-11-30030 November 1985 Monthly Operating Repts for Nov 1985 PLA-2552, Monthly Operating Repts for Oct 19851985-10-31031 October 1985 Monthly Operating Repts for Oct 1985 PLA-2543, Monthly Operating Repts for Sept 19851985-09-30030 September 1985 Monthly Operating Repts for Sept 1985 PLA-2530, Monthly Operating Repts for Aug 19851985-08-31031 August 1985 Monthly Operating Repts for Aug 1985 PLA-2516, Monthly Operating Repts for Jul 19851985-07-31031 July 1985 Monthly Operating Repts for Jul 1985 PLA-2500, Monthly Operating Repts for June 19851985-06-30030 June 1985 Monthly Operating Repts for June 1985 PLA-2487, Monthly Operating Repts for May 19851985-05-31031 May 1985 Monthly Operating Repts for May 1985 PLA-2466, Monthly Operating Repts for Apr 19851985-04-30030 April 1985 Monthly Operating Repts for Apr 1985 PLA-2442, Monthly Operating Repts for Mar 19851985-03-31031 March 1985 Monthly Operating Repts for Mar 1985 PLA-2424, Monthly Operating Repts for Feb 19851985-02-28028 February 1985 Monthly Operating Repts for Feb 1985 PLA-2409, Monthly Operating Repts for Jan 19851985-01-31031 January 1985 Monthly Operating Repts for Jan 1985 PLA-2387, Monthly Operating Repts for Dec 19841984-12-31031 December 1984 Monthly Operating Repts for Dec 1984 PLA-2371, Monthly Operating Repts for Nov 19841984-11-30030 November 1984 Monthly Operating Repts for Nov 1984 PLA-2349, Monthly Operating Repts for Oct 19841984-10-31031 October 1984 Monthly Operating Repts for Oct 1984 PLA-2330, Monthly Operating Repts for Sept 19841984-09-30030 September 1984 Monthly Operating Repts for Sept 1984 PLA-2305, Monthly Operating Repts for Aug 19841984-08-31031 August 1984 Monthly Operating Repts for Aug 1984 PLA-2273, Monthly Operating Repts for Jul 19841984-07-31031 July 1984 Monthly Operating Repts for Jul 1984 PLA-2248, Monthly Operating Repts for June 19841984-06-30030 June 1984 Monthly Operating Repts for June 1984 ML20092M9831984-05-31031 May 1984 Monthly Operating Repts for May 1984 PLA-2195, Monthly Operating Repts for Apr 19841984-04-30030 April 1984 Monthly Operating Repts for Apr 1984 1998-02-28
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML17146B1741999-08-0303 August 1999 GL 96-06 Risk Assessment for Sses. ML20206D3331999-04-27027 April 1999 SER of Individual Plant Examination of External Events Submittal on Susquehanna Steam Electric Station,Units 1 & 2. Staff Notes That Licensee IPEEE Complete with Regard to Info Requested by Suppl 4 to GL 88-20 ML20195B2381999-03-31031 March 1999 Redacted Version for 10CFR2.790 Request for Decommissioning Status Rept for Sses,Units 1 & 2 ML17164A8451998-10-31031 October 1998 SSES Unit 1 Tenth Refueling & Insp Outage ISI Outage Summary Rept. ML20236N6751998-07-0909 July 1998 Part 21 & Deficiency Rept Re Notification of Potential Safety Hazard from Breakage of Cast Iron Suction Heads in Apkd Type Pumps.Caused by Migration of Suction Head Journal Sleeve Along Lower End of Pump Shaft.Will Inspect Pumps ML20217Q4891998-04-21021 April 1998 Rev 1 to Draft LDCN 2482, FSAR Chapter 13.4 & FSAR Chapter 17.2 Changes to Support ITS Implementation ML18026A4931998-03-30030 March 1998 LER 97-007-01:on 971017,entry Into TS 3.0.3 Occurred to Allow Completion of Surveillance Testing of One Channel of Rbm.Caused by Failure of Components in LPRM Output to Rbm. Submitted TS Change Request to Extend LCO Action Statement ML18026A5401998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Susquehanna Steam Electric Station.W/980313 Ltr ML18026A4891997-11-17017 November 1997 LER 97-007-00:on 971017,TS 3.0.3 Entry Voluntarily Made. Caused by Inadequate Post Maint Testing Following Earlier Work Associated W/Components.Failed Components Repaired, Replaced & Testing Completed ML18017A2921997-10-28028 October 1997 1997 Nrc/Fema Observed Exercise. ML17158C1861997-06-0505 June 1997 Proceedings of Intl Topical Meeting on Advanced Reactors Safety Vol II, on 970601-05 ML20140A9661997-05-29029 May 1997 Part 21 Rept Re Ksv Emergency Diesel Generator Power Piston Failure.Caused by Jacket Water in Combustion Chamber. Recommends That Users Verify That Crown Thickness at Valve Cutout Be 100 Minimum ML18026A4781997-03-28028 March 1997 Rev 1 to Application of Anfb to ATRIUM-10 for Susquehanna Reloads. ML20137G6261997-03-25025 March 1997 Svcs Part 21 Rept Re Emergency Generators Installed at Zion Station Which Developed Significant Drop in Crankcase Lube Oil Level.Caused by Crack in Liner Wall,Allowing Jacket Water to Enter Chamber ML20155F7661996-07-25025 July 1996 Partially Deleted Job Number 739619-96, Investigation of E Diesel Breaker Misalignment ML20155F7491996-07-24024 July 1996 Independent Safety Evaluation Svcs Project Rept 3-96, Investigation of E Diesel Generator In-Operability Event ML20117G4641996-05-14014 May 1996 Part 21 Rept Re Cooper Bessemer Reciprocating Products,Div of Cooper Cameron Corp,Issued Ltr to Define Utils/Plants Containing Similar Equipment as Supplied on Cooper Bessemer Ksv & Enterprise Dsr EDGs ML18026A5961996-01-0202 January 1996 LER 95-013-00:on 951119,thermally Induced Pressure Locking of HPCI Valve Occurred Under Bonnet Pressure of 3,000-7,000 Psig.Damaged HPCI Injection Valve repaired.W/960102 Ltr ML18017A0511995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for SSES Units 1 & 2. W/951215 Ltr ML20092H7641995-08-31031 August 1995 Monthly Operating Repts for Aug 1995 for Susquehanna Ses ML17158A8771995-08-15015 August 1995 Exercise Manual. ML17158A8061995-07-14014 July 1995 Books 1 & 2 of ISI Outage Summary Rept SSES Unit 1 8th Refuel Outage. ML18017A0461995-07-0707 July 1995 LER 95-008-00:on 950609,shift Average Licensed Core Thermal Power Was Exceeded.Caused by Failed Instrumentation Drift. Repaired & Recalibrated Subject Instrumentation ML17164A6631995-04-11011 April 1995 Impact of Extending T-10 AOT from 3 to 7 Days. ML17164A5871995-01-31031 January 1995 Monthly Operating Repts for Jan 1995 for Susquehanna Ses ML18026A5351994-10-31031 October 1994 SSES Unit 1 & 2 MSIV Leakage Alternate Treatment Method Seismic Evaluation. W/One Oversize Drawing ML17158A4821994-08-23023 August 1994 ISI Outage Summary Rept Unit 2 6th Refueling Outage, Books 1 & 2 of 2 ML17158A2391994-04-0505 April 1994 Books 1 & 2 of SSES Unit 1 Seventh Refueling & Insp Outage ISI Outage Summary Rept. ML18017A2701993-12-31031 December 1993 PP&L Annual Rept 1993. ML17158A2651993-12-31031 December 1993 Allegheny Electric Cooperative,Inc Annual Rept 1993. ML17158A1631993-12-0909 December 1993 Remote Indication of Spent Fuel Pool Level & Temperature. ML18026A4281993-08-16016 August 1993 PP&L Response to NRC Concerns Re Loss of Spent Fuel Pool Cooling Following Loca,Sses,Units 1 & 2. ML18026A4261993-06-0909 June 1993 LER 90-007-01:on 900705,primary Power Supply to RPS a Power Distribution Panel Lost When One Electrical Protection Assembly (EPA) Breaker Tripped.Epa Logic Cards Reviewed & RPS Power Supply Will Be redesigned.W/930609 Ltr ML17157C2441993-02-28028 February 1993 Monthly Operating Rept for Feb 1993 for Susquehanna Steam Electric Station,Units 1 & 2 ML18017A2031993-02-0101 February 1993 Books 1 & 2 of Unit 2 Fifth Refueling & Insp Outage,Isi Outage Summary Rept. ML20044C2741993-01-31031 January 1993 Corrected Monthly Operating Rept for Jan 1993 for Susquehanna Steam Electric Station,Unit 2,consisting of Info on Unit Shutdowns & Power Reductions ML17157C3691992-12-31031 December 1992 PP&L Annual Rept 1992. ML20056C3941992-12-31031 December 1992 Allegheny Electric Cooperative,Inc Annual Rept 1992 ML18017A0421992-12-14014 December 1992 Suppl to 921127 Part 21 Rept Re High Air Concentration in Reactor Bldg Making Area Uninhabitable for Retrieving Air Filters,Per NUREG-0737,Item II.F.1.Util Current Position Re Fuel Pool Cooling Issues Contrary to Reg Guide 1.3 ML18026A2481992-11-27027 November 1992 Part 21 Rept Re Substantial Safety Hazard in Design of Facility for Loss of Normal Spent Fuel Pool Cooling ML18026A4231992-11-17017 November 1992 LER 92-016-00:on 920416,discovered That Existing Analysis for Two Spent Fuel Storage Pools Did Not Reflect Current Fuel Design & Plant Operation.Caused by Failure to Modify FSAR Analysis.Fsar Will Be revised.W/921117 Ltr ML17157C1421992-10-21021 October 1992 Engineering Assessment of Fuel Pool Cooling Piping EDR-G20020. ML17157C1411992-08-31031 August 1992 Loss of Fuel Pool Cooling Event Evaluation. ML17157C1401992-08-31031 August 1992 Review of Fuel Pool Cooling During Postulated Off-Normal & Accident Events SSES Units 1 & 2. ML20082C4941992-08-14014 August 1992 Evaluation of Unit 1 & Unit 2 Derating of Power Cables in Raceways Wrapped W/Thermo-Lag Matl ML17157C1381992-07-27027 July 1992 Safety Consequences of Boiling Spent Fuel Pool at Susquehanna Steam Electric Station. ML17157B9331992-07-24024 July 1992 Sixth Refueling & Insp Outage Inservice Insp Outage Summary Rept, Books 1 & 2 ML20097D4681991-12-31031 December 1991 Pennsylvania Power & Light Company,1991 Annual Rept ML18017A0391991-07-26026 July 1991 LER 91-010-00:on 910628,RWCU Isolated on Two Occassions Due to Actuations of Steam Leak Detection Instrumentation. Caused by Design Deficiency & Elevated Ambient Penetration Room Temps.Temp Modules replaced.W/910726 Ltr 1999-09-30
[Table view] |
Text
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ .
@ AVERAGE DAILY UNIT POWER LEVEL D \v
\
\
M w h DOCKET NO. 50-387 LP ~% Om g ( UNIT
$ DATI 02/03/87
. RIC Si COMPLETED aY J.A. Hirt TELEPHONE (717)542-3917
/
MONTH Jan11ary 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) iMWe Net) g 932 1044 37 2
1039 1040 g3 1041 3 g, 1042 _
1041 1043 4 ,0
, {
5 1041 1042 21 6
1042 1044 3
7 1041 1043 23 _
8 1040 1043 9 1036 1042 23 10 1040 1043 26 1036 1044 11 y 12 1036 1044
,3
~
1039 13 29 1043 14 1042 1041 3g 15 1041 16 1044 INSTRUCTIONS ge dady unit power levelin MWe. Net for each day in the reporting month. Compute to he neare t whole (9/77) 8702190136 870131 PDR ADOCK 05000337 .
R PDR --
- - N 3
e g&vl +7 Z __ 7 T-l_ . 3 L N- 1- UCNJ OPERATING DATA REPORT DOCKET NO. 50-387
$ DATE 02/03/s/
OpRIC Sih COMPLETED BY J.A. Hirt TEllPHONE (717)b4Z-3917
, OPERATING STAT S -
- 1. Unit Name:
b " " "
- 2. Reporting Period: Jan g 1987
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe):
1065
- 6. Maximum Dependable Capacity (Gross MWe): 1068
- 7. Maximum Dependable Capacity (Net MWe): 1032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
None
- 9. Power Level To which Restricted. If Any (Net MWe): None
- 10. Reasons For Restrictions,If Any: N/A
.1 This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 744 32,017
- 12. Number Of Hours Reactor Was Critica] 744 744 22,931.5 0 0 812.7
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line 744 744 22,358
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) 2,436.774 2,436,774 68.719.912
- 17. Gross Electrical Energy Generated (MWH) 801,496 801,496 22.389.034
- 18. Net Electrical Energy Generated (MWH) 772,055 772,035 21,447,084
- 19. Unit Service Factor 100.0 100.0 69.8
- 20. Unit Availability Factor 100.0 100.0 69.8
- 21. Unit Capacity Factor (Using MDC Net) 100.6 100.6 64.9
- 22. Unit Capacity Factor (Using DER Net) 97.4 97 4 62.9
- 23. Unit Forced Outage Rate 0.0 0.0 10,9
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date,and Duration of Eacht:
No shutdowns are scheduled.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup: N/A
- 26. Units in Test Status IPrior to Commercial Operation): Forecast Achie$ed INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPERATION to/77)
t gANN4 ,
.D .
I h DOCKET NO.
50-387 UNIT SHUTDOWNS AND POWER REDUCI10NS g R UNIT NAME SSES - Unit One
@f@ M DATE 02/03/87
- fC S COMPLETED BY J.A. Hirt REPORT MONTH .Tamnq 1987 TELEPHONE (7171542-3917 r.
jg }g je.,
N. i . Date g 3g }Yh
,j&
Licensee Event
,E-r, g '! '8 Cause & Corrective Action to 5 mo gO 6-d: jgg Report a g Prevent Recurrence I
d There were no~ shutdowns or significant power reductions experienced during January, 1987.
I 2 3 4*
F: Forced Reason: Method:
S: Scheduled Exhibit G -Instructions A-Equipment Failure (Explain) I-Manual for Preparation of Data B. Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)
E-Operator Training & License Examination from previous month F-Administrative
' Operational Error (Explain)
. 5-Reduction 5 Exhibit I - Same Source N/77) 11-O:her (Explain) 9-0ther
SUSQUEHANNA STFJM ELECI'RIC STM' ION
. Docket Nunber 50-387 Date 02/03/87 3 *
, Ccupleted by J.A. Hirt Telepham (717) 542-3917 Challenges to Main Stean Safety Relief Valves Nom Changes to the Offsite Dose Calmlation Manual Nom Major Changes to Radioactive Waste Treatment Systens Nom I
i 1
l
4 AVERAGE DAILY UNIT POWER LEVEL Q \v \
i
?
E CO w DOCKET NO. 50-388 L7 '
~% Two WIT kg E ogi.E 2/03/87 J.A. Hirt NJC Si COMPLETED BY TELEPHONE (717)542-3917 MONTH January, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net) (MWe Net) g 1051 915 37 2
1052 1053 g
3 051 19 1053 .
4 050 1054 20
~
5 1052 1054 21 6 1052 1053
.n 7
1052 1045 23 _
8 1052 960 24 9
1052 1043 25 10 775 1054 -
26 ig 0 1054 0 1054 12 ,3 13 1053 9
14 30 15 304 878 0
, 16 t
l INS 7RUCT10NS On th format, list the average dady unit power levelin MWe Net for each day in the reporting inonth. Compute to the nearest whole megawatt.
(9/77) l l
y %
-gglr l - +Y Z ,?_". _ ,
L ;"t UTJtJ OPERATING DATA REPORT o DOCKET NO. 50-388 O is DATE 02/03/87 NIC $Y COMPLETED BY .T A Hi rt TEllPHONE (717)542-3917 OPERATING STATUS Unit %o
- 1. Unit Name: Swehanna Stean Electric Station Notes
- 2. Reporting Period: January 1987
- 3. Licensed Thermal Power (MWt): 3293
- 4. Nameplate Rating (Gross MWe): 1152
- 5. Design Electrical Rating (Net MWe): 1065
- 6. Maximum Dependable Capacity (Gross MWe):
1068
- 7. Maximum Dependable Capacity (Net MWe): 1032
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since last Report, Give Reasons:
None
- 9. Power Level To Which Restricted,If Any (Net MWe): Nom
- 10. Reasons For Restrictions,if Any: N/A This Month Yr..to.Date Cumulative
- 11. Hours In Reporting Period 744 744 17,256
- 12. Number Of Hours Reactor Was Critical 681.0 681.0 13,789
- 13. Reactor Reserve Shutdown Hours 0 0 717.9
- 14. Hours Generator On.Line 645.3 645.3 13,374.6
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (MWH) ? n1(;,nna 2.016.004 41,408,889
- 17. Gross Electrical Energy Generated (MWH) 664 A06 664.506 13,568,800
- 18. Net Electrical Energy Generated (MWH) 640.023 640,023 l'3,042,552
- 19. Unit Service Factor 86.7 86.7 77.5
- 20. Unit Availability Factor 86.7 86.7 77.5
- 21. Unit Capacity Factor (Using MDC Net) 83.4 83.4 73.2
- 22. Unit Capacity Factor (Using DER Net) 80.8 80.8 n .0
- 23. Unit Forced Outage Rate 13.3 13.3 H-)
! 24. Shutdowns Scheduled Over Next 6 Months (Type. Date,and Duration of Eacht:
! No Shutdowns are scheduled
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation): Forecast Achiesed l
INITIA L CRITICALITY INITIA L ELECTRICITY COMMERCIAL OPER ATION l
l l
l (4/77i
'l 46 ANN 4
) )N (y m
5 5 DOCKET NO. 50-388 UNIT SHUTDOWNS AND POWER REDUC 110NS
$
- UNIT NAME SSES-Unit Two DATE n'> /n 4 /R7
%###C @i S REPORT MON 111 January 1987 COMPLETED BY TELEPHONE J.A. Hirt (717)542-3917
- jg 3 $I3 Licensee Eg K Cause & Corrective h Date g gg ( js& Event gg Action to H
f= 5 j;;jg Report a en U g{ Prevent Recurrence c5 1 870111 F 98.7 A 2 87-001-00 IN ISV Unit 'No was shutdown fran 19% power on January 11, 1987, at 0154 hours0.00178 days <br />0.0428 hours <br />2.546296e-4 weeks <br />5.8597e-5 months <br />, in order to make a contairment entry to repair,the Reactor Building Chilled Water "B" Icop inboard isolation valve. The valve had _. _
failed to close during surveillance testing. The shutdown was rcquired to otrnply with Technical. Specificatiois section 3.6.3.a. After the reactor was shutdown / cooled down maintenance personnel replaced the solenoid valve which controlled the isolation valve's pneunatic supply.
Unit 'No was restarted and synchroniz(d to the grid on January 15, 1987 at 0422 hours0.00488 days <br />0.117 hours <br />6.977513e-4 weeks <br />1.60571e-4 months <br />.
I 2 3 4 F: Forced Reason: Method: Exhibit G -Instructions S: Scheduled A-Equipment Failure (Exrun) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4 Continuation 0161)
E Operator Training & Ucense Examination from previous month F-Administrative 5 G-Operational Error (Explain) 5-Reduction Exhibit I - Same Source (9/77) Il-Other (Explain) 9-Other
SUSQUEHARE STEAM FrHTRIC STATION Docket Ntznber 50-388 Date 02/03/87 Canpleted by: J.A.-Hirt Telephone:. (717) 542-3917 Challenges to Main'Stean Safety Refief Valves None Changes to the Offsite Dose Calculation Manual None Major Changes to Radioactive Waste Treatment Systans None i
l 1
PP&L Pennsylvania Power & Light Company Two North Ninth Street
- 215 / 770 5151 Harold W. Keiser Submitted pursuant to Vice President-Nuclear Operations -Technical Specifications 1 ', - . 215/770-7502 Section.6.9.1.6 FEB 101987 Director, Data Automation &
Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MONTHLY OPERATING REPORTS Docket Nos. 50-387/NPF-14 PLA-2798 FILE R41-2A 50-388/NPF-22
Dear Mr. Beebe:
The January 1987 monthly operating reports for Susquehanna SES Units 1 and 2 are attached.
Very truly yours,
\ LLO%
H. W. Keiser Vice President-Nuclear Operations Attachment cc: Document Control Desk (Original)
NRC Region 1 Mr. L. R. Plisco - NRC Resident Mr. M. C. Thadani - NRC Project Manager l ll