PLA-2188, Responds to NRC Re Violations Noted in IE Insp Rept 50-387/84-09.Corrective Actions:Training Records Revised to Indicate QC Inspector Completion of Required Training & QC Inspectors Certified in Radwaste Discipline
| ML20084S532 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 05/04/1984 |
| From: | Kenyon B PENNSYLVANIA POWER & LIGHT CO. |
| To: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| Shared Package | |
| ML20084S530 | List: |
| References | |
| PLA-2188, NUDOCS 8405250186 | |
| Download: ML20084S532 (3) | |
Text
_
PPaJ.
Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101
- 2151 770 5151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 MAY 0 41984 Mr. Thomas T. Martin, Director Division of Engineering and Technical Programs U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION NRC INSPECTION REPORT 50-387/84-09 ER 100450 FILE 841-04 PLA-2188 Docket No. 50-387
Dear Mr. Martin:
This letter provides PP&L's response to your letter of April 5, 1984, which forwarded NRC Region I Inspection Report 50-387/84-09 with Appendix A, Notice of Violation.
Your Notice advised that PP&L was to submit a written reply within thirty (30) days of the date of the letter. We trust that the Commission will find the attached response acceptable.
Very truly yours, t'
s 1
B. D. K Vice President-Nuclear Operations Attachments cc: Mr. R. H. Jacobs - NRC Senior Resident Inspector Mr. P. Clemons - NRC Region 1 Inspector i
1 l
8405250186 040521 PDR ADOCK 05000 0
i
r-i
~
RESPONSE T0-NOTICE OF VIOLATION Violation (387/84-09-01)
Technical Specification 6.8 requires that the licensee establish, implement and maintain procedures to carry out an effective quality assurance program, a.
Procedure No. NTI-QA-3310A, "Radwaste Worker Training," developed pursuant to the above, states in the Terminal Unit objective:
"Upon completion of this unit the student should be able to demonstrate an understanding of Department of Transportation (D.O.T.) Procedure. This will be assessed by obtaining a minimum score of 70% on the unit exam."
Contrary to the above, a Quality Control Inspector received the Radwaste Worker Training during March 1983, however, he did not demonstrate an understanding of the training by taking the examination upon completion of the unit. The inspector was one of several employees who were not required to take the examination.
b.
Section 7.6 of Procedure No. QCP-10. " Training, Qualification and Certification of Inspection, Examination and Testing Personnel," developed pursuant to the above, stated "A Certificate of Qualification QC 8-10-1, shall be issued to each qualified individual.
This certification shall indicate the specific level of capability,_ Level I, Level II and Level-III, and the specific function for which the individual is certified.
Specific functions / disciplines a person may be certified in are as follows:
General Mechanical Electrical I&C Radwaste Receipt Inspection."
Contrary to the above, a Quality Control Inspector performed inspections involving transportation activities and was not certified in the Radwaste function.
Response
(1) Corrective steps which have been taken and the results achieved:
The records upon which the NRC Inspector based his inspection were-a.
incomplete. Based upon backup data, in the form of test results and
~
attendance sheets, training records have been revised,to indicate-that the QC inspectors had taken and passed the required examinations.~
j b.
The QC Inspector:in question had all_the required' training in the l
Radwaste function and!was certifiable, but because of his multidiscipline background the. inspector was certified in the'
" General" discipline ~as allowed by QCP #10.- The inspector, as well~
as all QC inspectors involved in radwaste activities have been l.
formally certified in the Radwaste discipline.
H g
s
]
i
- (2) Corrective steps.which have been or will be taken to avoid further
' violations:
a.
Training records have been corrected to properly indicate completion of required training, therefore the inspection activitie-37 the QC inspector are valid.;
)
~
b.
To preclude recurrence of this violation the responsible QC supervisor will, insure any Quality Control personnel assigned to radwaste activities are certified in the Radwaste function.
(3) Date of Full. Compliance:
In accordance with the above statements, PP&L is now in full compliance.