PLA-2059, Provides Revised Scheduled Completion Date for Safety Parameter Display Sys of No Later than 840701.Extending Completion Date Will Not Reduce Ability to Deal W/Emergency
| ML18040A723 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 02/01/1984 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| References | |
| PLA-2059, NUDOCS 8402070200 | |
| Download: ML18040A723 (2) | |
Text
0 0
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8402070200 DOC ~ DATE: 84/02/01 NOTARIZED:
NO DOCKET FACIL:50 387 Susquehanna Steam Electric Stationi Unit li Pennsylva 05000387 50 388 Susquehanna Steam Electric Stationi Unit 2i Pennsylva 05.0-.-
AUTH BYNAME AUTHOR AFFILIATION CURTIS',He 'ennsylvania Power L Light Co, REC IP ~ NAME RECIPIENT AFFILIATION SCHKENCERrA ~
Licensing Br anch 2
S UBJECT: Pr'ovides revisea scheduled completion date for safety parameter display sys of no later than 840701.Extending completion date will not reduce ability to deal w/emergency, DISTRIBUTION COOK'001S COPIES RECEIVED:LTR J ENCL SIZE:
TITLK: Licensing Submittal:
PSAR/FSAR Amdts 8 Relateo Correspondence NOTES: icy NMSS/FCAF/PM'PDR 2cys ~
icy NMSS/FCAF/PM ~
LPDR 2cys.
05000387 05000388 RKC IP IKNT
-ID CODE/NAME NRR/DL/ADL NRR LB2 LA INTERNAL: ELD/HDS4 IE/DEPER/EPB 36 IE/OQASIP/QAB21.
NRR/DE/CKB il NRR/OE/EQB 13 NRR/DE/MKB 18 NRR/DE/SAB 24 iVRR/DHFS/HFEB40 NRR/DHFS/PSRB NRR/DS I/AEB 26=
NRR/DSI/CPB 10 NRR/DSI/ICSB 16 NRR/OSI/PSO 19 NRR/DSI/RSB 23 RGNl EXTERNAL: ACRS 41 DMB/DSS (AMDT'8)
LPDR 03.
NSIC 05 NOTES:
COPIES LTTR EN 1
1 1
3l 1
1 2
1.
1 1
1 1
1 1
3 RECIPIENT ID CODE/NAMK NRR LB2 BC PKRCHlR ~
01 IE F ILK IK/DEPER/IRB 35 NRR/QE/AEAB NRR/DE/KHEB NRR/DK/GB 28 NRR/DE/MTEB 17 NRR'/QE/SGEB 25 NRR/DHFS/LQB '32 NRR/DL/SSPB NRR/DSI/ASB NRR/QS I/CSB 09 NRR/OS I/METB 12 RAB 22 RM/ODAMI/MI8 BNL(AMDTS ONLY)
FEMA,RKP 0 IY 39 NRC PDR 02 NTIS COPIES LTTR ENC 1
1 1
1 1
1 1
1 1
1 1
1 TOTAL NUMBER OF COPIES REQUIREOe LTTR 57 ENCL
Pennsylvania Power 8 Light Company Two North Ninth Street
~ Allentown, PA 18101
~ 215 I 7705151 Norman W. Curtis Vice President-Engineering 6 Construction-Nuclear 21 5/770-7501 FEB g g jgey Director of Nuclear Reactor Regulation Attention:
Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U.S. Nuclear Regulatory CatInission Washington, D.C.
20555 SUSQUEfQHNA STEAM ELECTRIC STATION SPDS CCNPLLTION SCHEDULE ER 100450/100508 FILE 896 PLA-2059 Docket Nos. 50-387 50-388
Dear Mr. Schwencer:
This letter is provided to revise the scheduled completion date for the Susquehanna SES Units 1 and 2 Safety Param ter Display Systems.
As you are aware fram previous correspondence, we have been encountering difficulties.
with testing and installation of the systems.
We have recently evaluated the status of remaining work and have projected a completion date for both units no later than July 1, 1984.
Based on our evaluation, we are requesting that the Unit 2 operating license, when issued, contain a July 1; 1984 completion date requirement.-
Additionally, we are in the process of requesting a change to License Condition 2.C. (28) (g) (1) for the Unit 1 Operating License (NPF-14) to reflect the July 1, 1984 date.
It is our position that extending the completion date f'r SPDS does not reduce our ability to deal with an emergency.
The reasons for this position remain the sana as those stated in PLA-1717 dated June 23, 1983.
Should you have any questions, please contact W. W. Williams at (215) 770-7856.
Very trul
- yours, N. W. Curtis Vice President-Engine ing & Construction-Nuclear cc:
R. L. Perch NRC 8402070200 840201 PDR ADOCK 05000387 F