PLA-1655, Monthly Operating Rept for Apr 1983

From kanterella
(Redirected from PLA-1655)
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1983
ML20076H209
Person / Time
Site: Susquehanna Talen Energy icon.png
Issue date: 05/06/1983
From: Kenyon B, Kuczynski L
PENNSYLVANIA POWER & LIGHT CO.
To: Beebe M
NRC OFFICE OF RESOURCE MANAGEMENT (ORM)
References
PLA-1655, NUDOCS 8306160472
Download: ML20076H209 (5)


Text

.

e..

[ AVERAGE DAILY UNIT POWER LEVEL D

gni ,,,, 3 DOCKET NO. 50-387

" ,J L

UNIT One s0 DATE 5-6-83 0 7g gib COMPLETED BY L.A. Kuczynski TELEPHONE (717)542-2181 MONTH Anr11. I983 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net)

I 1010 37 0 2 1060 18 0

3 1060 g, o 4 1028 0 20 5 0 0 21

' 0 0 6 n 7 D 0 8

0 o 4

9 0 25 0 10 0 0 26 II O 27 0 0 0 12 28 13 0 0 29 14 0 30 0 0

15 3l 16 0 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

(9/77) 8306160472 830506 PDR ADOCK 05000387 R PDR

~~* N D@ /f!\

M ____l

\ 3 a- 1 W ,J OPERATING DATA REPORT N PPat N

$OpRIC STfs 0 DOCKET NO.

DATE 50-387 5-6-83 COMPLETED BY L. A. Kuczynski TELEPHONE (717)542-2181 OPERATING STATUS Unit 1 Notes

1. Unit Name: Susquehanna Steam Electric Station
2. Reporting Period: April, 1983 3293
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe): 1280x0.9=1152
5. Design Electrical Rating (Net MWe): 1152-41=1111
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
  • *MDC to be determined
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report,.Give Reasons:

None

9. Power Level To Which Restricted,if Any (Net MWe): Non e
10. Reasons For Restrictions. If Any: None This Month Yr..to-Date Cumulative
11. Hours in Reporting Period 719 2879 '3971.5
12. Number Of Hours Reactor Was Critical 95.5 1708.7 2638.7
13. Reactor Reserve Shutdown Hot.rs 0 133 197.6
14. Hours Generator On-Line 95.5 1556.I 2408.7
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 310,000 3.767.729 5.062.194
17. Gross Electrical Energy Generated (MWH) 103,100 1,253,170 1.597.590 l 18. Net Electrical Energy Generated (MWH) 99,809 1.192.661 1,513,966
19. Unit Service Factor N/A
20. Unit Availability Factor N/A l 21. Unit Capacity Factor (Using MDC Net) N/A
22. Unit Capacity Factor (Using DER Net) N/A
23. Unit Forced Outage Rate N/A 2.4. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

None

25. If Shut Down At End Of Report Period. Estimated Date of Startup: 5-11-83
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved I

INITIA L CRITICALITY 09-07-82 09-10-82 INITIAL ELECTRICITY 11-19-82 11,-16-82 COMMERCIAL OPERATION 05-15-83 I

(9/77 )

f

ANN 4 a Fifl $

DOCKET NO. 50-387 L -

UNIT SHUTDOWNS AND POWER REDUCTIONS e pp,t UNIT NAME One e DATE 5-6-83 L A. Encz m ki REPORT MONTH April, 1983 COMPLETED BY

  1. RIC @ TELEPHONE (717)542-2181 w.

n g

.$ E };; .$ Licensee E r, o Cause & Corrective No. Date 3g ,gE Event gg g3 Action to H

$E 5 jgg Report # mo g V

Prevent Recurrence d

11 4/4/83 S 623.5 B 3 N/A ZZ ZZZZZZ As part of scheduled startup testing, a full closure of the main steam isolation valves was initiated which

~

resulted in a reactor scram.

I 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3 Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)

EOperator Training & License Examination F-Administrative 5 G-Operational Error (Explain) Exhibit 1 - Same Source (9/77) Il-Other (Explain)

i4-

/

SUSQUEHANNA STEAM ELECTRIC STATION Docket Number 50-387 Date 5-6-83 Completed by L. A. Kuczynski Telep5one (717)542-2181 April, 1983 Challenges to Main Steam Safety Relief Valves None Changes to the Of fsite Dose Calculation Manual None Major' Changes to Radioactive Water Treatment Systems None i-

7

@ Pennsylvania Power & Light Company Two North Ninth Street

  • AMentown, PA 18101 + 215 / 7745151 Bruce D. Kenyon Vice President-Nuclear Operations 215/770-7502 MY l 01983 Director, Data Automation &

Management Information Division Attention: Mr. M. R. Beebe Management Information Branch Office of Resource Management ,

U.S. Nuclear Regulatory Commission Washington, D.C. 20555 SUSQUEHANNA STEAM ELECTRIC STATION MON 3LY OPERATING REPORT - APRIL 1983 ER 100450 FILE 841 PLA-1655 Docket No. 50-387 Dect Mr. Beebe:

The April 1983 monthly operating report for Susquehanna SES Unit 1 is attached.

Very trul yours, W

B. D. Kenyon Vice President-Nuclear Operatians Attachment cc: Mr. James M. Allan INPO Records Center Acting Regional Administrator Suite 1500 Region I 1100 circle 75 Parkway U.S. Nuclear Regulatory Commission Atlanta, Georgia 30339 631 Park Avenue King of Prussia, PA 19406 Director Mr. Thomas E. Pollog Office of Inspection and Enforcement Department of Environmental U.S. Nuclear Regulatory Commission Resources Washington, D.C. 20555 Bureau of Radiation Protection Attn: Document Control Desk (12 copies) P.O. Box 2063 Harrisburg, PA 17120 Mr. G. Rhoads - NRC Mr. R. Perch - NRC dM Ifl l