Text
PV.
'tb RV V~" '
' lF~(454~4$ 44~Wba@cAf0EN~~iS>~rArAC4a.'S~r;iakha4i~~kbi 0
REGULATORY INFORMATION DISTRIBUTION *S STEM
('RIDS)-
ACCESSION NBR:8205110450 DOC ~ DATK: 82/05/03 NOTARIZED:= NO, DOCKET ¹ FACIL:,50<<387 Susquehanna Steam Electric Stations.Uni.t,l'E,'Pennsyl'va 05000387'0.
388 Susquehanna S'team Electric Stations 'Unit 2~ Pennsylva 5000 AUTHRNAME AUTHOR AFFILIATION CURT IS E N ~ li ~
Pennsylvania Power 8, Light Co+
RKC IP ~ NAME RECIPIENT AFFILIATION SCHnENCER i A.
L-ic'ensing, Branch 2
SUBJECT:
Revises Paragon aph I ~ B ~ 4 of util 810611 litr re.lpreservice/
inservice exam, Augmented, preservice 8 inser vice insp programs have been established in accordance w/NUREG>>0619.
DISTRISUTIDN CODE:
SOOIS CDPIES RECEIVEDtl.TR,J ENCL.O SIZE!
TITLE': PSAR/FSAR AMDTS and Rel ated Cor respondence NOTES:
RECIPIENT IO CODE/NAME A/D LICENSNG LIC BR ¹2 LA INTERNAL! ELD IE/DEP EPOS 35 MPA NRR/DE/EQB 13 NRR/DE/HGEB 30 NRR/DE/MTEB 17 NRR/DK/SAB 24 NRR/DHFS/HFKB40 NRR/DHFS/OLB 34 NRR/DSI/AEB 26 NRR/DSI/CP8 10 NRH/DSI/ETSB 12 NRR/DS I/PSB 19 NRR/DSI/RSB 23 04 COPIES LTTR
- ENCL, 1
1 1
3 2
1 1
1 1
1 1
1 1
1 1'ECIPIENT ID CODE/NAME LIC BR ¹2 BC PERCHtR ~
01 IE FILE IE/DEP/EPLB 36 NRR/DE/CEB 11 NRR/DE/GB 28 NRR/DE/MEB 18 NRR/DE/QAB 21 NRR/DE/SEB 25 NRR/DHFS/LQB 32 NRR/DHFS/PTRB20 NRR/DS I/ASB 27
'NRR/DS I/CSB 09 NRR/DSI/ICSB 16 NRR/DSI/RAB 22 NRR/DST/LGB 33 RGN1 COPIES LTTR ENCL 1
1 1
3 1
2--
1 1
1 1
1 1
1 1
1 1
2 EXTERNAL: ACRS 41 10 1
FERA<<RKP DIV 39 1
NRC PDR 02 1
NTIS 1
BNL(AMDTS ONLY)
LPDR 03 NSIC 05 1
"?
1 TOTAL NUMBER OF COPIES REQUIRED)
LTTR 58
- ENCL,
Pennsylvania Power 8 Light Company Two North Ninth Street
~ Ailentown; PA 18101
~ 215 l 7705151 Norman W. Curtis Vice President-Engineering
& Construction-Nuclear 215/ 770-5381 NAY 3 3982 Mr. A. Schwencer, Chief Licensing Branch No.
2 Division of Licensing U;S. Nuclear Regulatory Commission Washington, D.C.
20555 SUSQUEHANNA STEAM ELECTRIC STATION PRESERVICE/INSERVICE EXAMINATION NUREG 0619 ER 100450 PILE 841-2 PLA-1075 Docket Nos.
50-387 50-388
Reference:
Letter dated 6/11/81 Curtis to Schwencer (PLA-807)
Dear Mr. Schwencer:
The following revises paragraph I.B.4 of PP&L's response to NUREG 0619 transmitted via the above referenced letter:
Ins ections Augmented Preservice and Inservice Inspection Programs have been established in accordance with the guidance of NUREG 0619 as follows:
a.
A preservice surface examination of the accessible portions of the nozzle bore and inner radius has been performed on each of six (6)
Unit 81 feedwater nozzles.
A complete examination was not performed due to interference from the installed thermal sleeves and spargers.
The liquid penetrant examinations were performed in accordance with GE I&SE procedure number ISE-QAI-331; no recordable indications were detected.
The Unit 82 feedwater nozzles will be surface examined by liquid penetrant methods completely prior to sparger installation.
Note also that all nozzle forgings have undergone complete shop magnetic ~++/
particle inspection and have met ASME Section III requirements.
5 b.
A preservice ultrasonic examination of all six (6) feedwater nozzle 0
inner radii, safe
- end, and bore regions have been performed.
All safe ends were inspected in accordance with ASME Section XI requirements and GE T&SE procedure ISE-QAI-322, "Ultrasonic Examination of Similar and 8205ii0450 820503 PDR ADOCK 05000387 9
'ivAY 03 1982 Page 2
SSES PL'A-1075 ER 100450 File 841-2 Mr. A. Schwencer Dissimilar Metal Welds."
The inner radius and bore regions were separated into zones for examination purposes and examined in accordance with the following GE I&SE procedures:
ISE-QAI-332; Procedure for Nozzle Inner Radius Zone 2 Ultrasonic Examination.
ISE-QAI-333, Procedure for Nozzle Inner Radius Zone 3 Ultrasonic Examination.
ISE-QAI-334, Ultrasonic Examination of Nozzle Inner Radius, Zone l.
These procedures represent specialized techniques 'for performance of this examination and were prepared for Susquehanna utilizing proven General Electric Company generic specifications
- E50YP32, E50YP33 and E50YP31, respectively.
Inspection personnel who performed these examinations with the specialized technique were qualified by actual field experience and/or on
- a. full scale nozzle mock"up at the General Electric facility.
No recordable indications were detected, c.
The Inservice Inspection Program'will include requirements for augmented periodic ultrasonic and liquid penetrant testing to determine the inservice integrity of feedwater nozzles in accordance with the schedule in NUREG 0619, Table 2, "Routine Inspection Intervals" and the provisions of Section 4.3, "Inspections."
On line leakage monitoring provisions have not been included at Susquehanna SES as on-line leakage monitoring has yet to be proven as an effective quantitative measure of feedwater nozzle bypass leakage.
Furthermore, on-line leakage monitoring has not been determined to be a suitable alternative to the inspection methods and intervals outlined in Table 2 of NUREG 0619.
In addition, the following revises paragraph II.C of PP&L's response to NUREG 0619:
Ins ections SSES Unit 81 liquid penetrant examinations, in accordance with GE I&SE procedure number ISE-QAI-331, have been performed on the CRDRL nozzle
MPY P 3 1982 SSES PLA-1075 ER 100450. File 841-2 Hr. A. Schwencer
~<kwMka6s'~ARO&d&k&RMi@ME~
0 e
gf Page 3
blend radius, bore region, and reactor pressure vessel wall area eight (8) inches beneath the nozzle.
No recordable indications were detected.
Examination similar to the above shall also be performed on Unit 82.